IR 05000259/1979029
| ML18024B093 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry, Oconee |
| Issue date: | 10/01/1979 |
| From: | Blake J, Herdt A, Van Dorn P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML18024B092 | List: |
| References | |
| 50-259-79-29, 50-260-79-29, 50-296-79-29, NUDOCS 7911150131 | |
| Download: ML18024B093 (8) | |
Text
UNITEDSTATES NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100 ATLANTA,GEORGIA 30303 Report Nos. 50-259/79-29, 50-260/79-29, and 50-296/79-29 Iicensee:
Tennessee Valley Authority 500A Chestnut Street Tower..II Chattanooga, Tennessee 37401 Facility Name:
Browns Ferry Nuclear Plant Docket Nos. 50-259, 50-260 and 50-296 License Nos. DPR-33, DPR-52, DPR-68 Inspection at Browns Fer Sit near Decatur, Alabama Inspectors:
P n Do
/~ /
7V Date igned ke Approved y:
(.
A. R. Herdt, Section Chief, RCES Branch Da e Signed
/0
~ 7 Date igned SUMMARY Inspection on September 11-14, 1979 Areas Inspected This routine, unannounced inspection involved 56 inspector-hours onsite in the areas of inservice inspection program procedures, records and work (Unit 3);
maintenance and modification welding and nondestructive examination programs (Units 1, 2, and 3); core spray piping replacement (Unit 3).
Results Of the three areas inspected, no apparent items of noncompliance or deviations were identifie ~,
Persons Contacted Licensee Employees DETAILS
+J. L. Harness, Assistant Plant Superintendent G. T. Jones, Outage Director D. Jent, Assistant Outage Director
+R. Cole, QA Coordinator, Office of Power
+D. E. Harvey, ISI Coordinator S. Linginfelter, QA Engineer T. L. Hale, ISI Coordinator Other licensee employees contacted included four technicians.
NRC Resident Inspector W. F. Sullivan
+Attended exit interview.
2.
Exit Interview The inspection scope and findings were summarized on September 14, 1979 with those persons indicated in Paragraph 1 above.
No items of concern were addressed.
3.
Licensee Action on Previous Inspection Findings Not inspected.
4.
Unresolved Items Unresolved items were not identified during this inspection.
5.
Independent Inspection A.
Storm Preparations r
On Wednesday, September 12, 1979, the inspectors observed the licensee preparation of the site for the possible high winds and rain expected from the passage of hurricane or,tropical storm Frederick.
Activities observed included inspection and lashing down of materials stored outdoors; picking up 'of loose materials; and securing of crane booms.
~ ~,c
~
r-
~
~
>
~
0 ~
s.
Core Spray Piping Inspection (Unit 3)
The inspector selected five of the replacement core spray piping welds which had been ultrasonically examined for a base line inspection and reviewed the test data and,evaluations.
The welds inspected were as follows:
(1)
Weld TSCS-3-409 Report R-005 Calibration No. C-001 (2)
Weld TSCS-3-408 Report R-006 Calibration No. C-001 (3)
Weld TSCS-3-425 Report R-007 Calibration No. C-001 (4)
Weld TSCS-3-404 Report R-008 Calibration No. C-001 (5)
Weld TSCS-3-402 Report R-001 Calibration No. C-001 There were no items of noncompliance or deviations in this area of inspec-tion.
6.
Welding The inspector reviewed the licensees program for the control of welding activities during maintenance and modification operations involving safety related systems.
The welding procedures used by the licensee are contained in DPM N 73M2 consisting of the TVA OEDC General Procedures G-29M, G-29C and G-29E which have been approved for use at the operating plants by the Chief of the Nuclear Generation Branch and the Chief of the Power Plant Maintenance Branch.
~
'he inspector reviewed the following specific welding procedures contained in DPM N 73M2 for conformance with ASME lection IX requirements:
GT-SM11-0-3 GT-SM18-0-1
GT-.SM88".0-,.1B GT<<. 11~01A Sg)1-B-.3 he licensees weldipg material coptrol, system is contai'nod in Modification/
~
~
dditxon Enstruction (MAI) 12*
Outage Too) Room Procedure'l in the *sectioq concerning welding materials.
For modification/adPitj.qn operations the qeldipg aalu filler material contra). requigemeats are'pylesIented by work pl,ans generited in accordance pith the licensee's standard'pract:ice procedure BFA'28
"Plant Podifcations and Work Plants
, while for.maint'enance operation's involving welshing of safety related structures 'pr components the requirements are ippleiientpg by
@echanical maintanence ijstructions.
The ipspeqtor reviewed the 'foglqwiag plans and instructions:
Work Plap 7747 " ")iSRV. 'fail Piece Addition - Prefabrjcatioq" Work Pfan 7723
-,
",Core Spray Elope Replacement" Mechanical Maintenance Epstruction 8Q
-. l'gelding Bonnet E,ip on yll Recir-,
culafjon Pump Suction an/ Dischjjge Valves" The inspector visually inspected aad reviewed the wplding documentqgipq for age following welds which had ljeen complete'd 'in accordance with WP, 774/ aijd VP 7723i Welf Number TSCS".3-425 TSCS,3-.418 3ATF20 System Core Spray Corp Spray MSRV 3A/P21 MSRV
The we3,der gpalificqtion records for thy personnel involved with the four weld joiijt:s wer'e'revieweg fpr compliance with 'ASME CIIdy Section P"requirq-.,
meats.
'herevere no items of nqqcoypliance og deviations identified during this aghast.'oR the jnsp'ection.'.,
Nopdestructive Eyaminatioa (NDE)
Aa inspeptjon was qade of the Ijcensee's program for. nondestrgctive qxamina-.
tj.pn'of wilds jssocj.atgd pith jaintepaqce aad mjdi.fxcation al:t'$vi,tie The inspector reviewed the following NDE procedures for technical adequacy and compliance with licensee commitments and regulatory requirements:
(a)
Nuclear Penetrant Testing - Procedure BF-PT-1 (b)
Specification for Dry Mage+netic Particle Examination - Prod and Yoke Methods (c)
Process Specification for Radiographic Examination ASME Code -Section III and Applicable Subsections (Industrial Labortories Inc.,
Chattanooga, Tennessee)
(d)
DPM N73M2 Sections 3.M.5.1 and 3.C.5.2 - Visual Inspection Procedure The inspector reviewed the certification status of Level I, II and III personnel in the various NDE disciplines and the licensees method of maintaining the certifications for these inspector.
Welding inspection records for the weld joints listed in paragraph 6 above were examined to verify the implementation of the NDE procedures.
There were no items of noncompliance or deviations in this area of inspec-tions.
8.
Inservice Inspection - Review of Program (Unit 3)
Tennessee Valley Authority (TVA) has contracted with Lambert, MacGill and Thomas,.Inc.
(LMT) to perform and document the inservice inspections (ISI).
ISI is being performed in accordance with the ASME Boiler and Pressure Vessel Code Section XI, 1974 edition plus addenda through Summer 1975.
TVA has developed the ISI program, QA requirements and procedures to control and document inspections.
These documents include the Operations QA Manual; TVA Browns Ferry Nuclear Plant Surveillance Instruction 4.6.6,
"Preservice Baseline Inspection and Inservice Inspection Program, Unit 3";
Procedure N-AI-l, Rev.
1, "Duties of the Authorized TVA Inspector, TVA Nuclear Plants"; procedure N-UT-l, Rev.
1, "Ultrasonic Examination of Nuclear Coolant System Piping";
procedure N-MT-1, Rev.
0, "Dry Magnetic Particle Examination - Prod and Yoke Methods"; procedure BF-PT<<l, Rev.
0,
"Nuclear Penetrant Testing";
and audit checklist for audit no.
OPQAA-BF-79-SP-04.
The inspector reviewed these documents to determine whether appropriate procedures/instructions were provided and requirements were being met in the following areas:
licensee approvals; QA organization; general QA requirements such as specification of quality requirements, control of program deviations, quality documentation and identification of components/systems covered by the program; establishment and control of work procedures to insure control of inspections; control of corrective action; document control; contxol of examination equipment; quality
- records; qualification of personnel; scope of the inspection such as areas to be examined, examination category, method and extent of examination and exemptions; and inspection intervals.
r
~ ',,
~
w5 No items of noncompliance or deviations were identified.
9.
Inservice Inspection - Review of Procedures (Unit 3)
The applicable Code is identified in paragraph 8.
The 'inspector reviewed ISI inspection procedures in detail for conformance to NRC and Code require-ments.
The procedures reveiwed were N-UT-1, Rev.
1', "Ultrasonic Examination of Nuclear Coolant System Piping"; BF-PT-l, Rev.
0, "Nuclear Penetrant Testing"; and N-MT-1, Rev.
0, "Dry Magnetic Particle Examination - Prod and Yoke Methods".
The procedures were reviewed in the areas of procedure approvals; personnel qualification requirements; procedure scope; require-ments for records such as results, data sheets, equipment data, calibration data sheets, calibration blocks, penetrant material, and couplant material; and technical requirements for ultrasonic testing (UT) (type of apparatus, equipment calibration, extent of coverage, test calibration, size and frequency of search units, beam angles, DAC curves, reference level, scanning level, method of demonstrating penetration and recording and evaluation of indications), liquid penetrant test (PT) (type of material analysis of materials, surface preparation, temperature requirements, methods of application and removal of materials, time intervals evaluation of indications and procedure qualification requirements)
and magnetic particle test (MT) (requirement for continuous current, dry particle requirements, irispection technique, prod spacing, amperage for the prod method, yoke pole spacing, yoke lifting power requirements and evaluation of indications).
No items of noncompliance or deviations were identified.
10.
Inservice Inspection - Observation of Work and Work Activities (Unit 3)
Th'e applicable Code is identified in paragraph 8.
The inspector observed inspection activities to determine if NRC and procedural requirements were being met.
The inspector observed portions of L-wave and 45 degree shear wave UT of Main Steam System Weld No. GMS-3-17, portions of MT of reactor vessel stud no'.
25 and PT inspection of Reactor Water Cleanup System support Weld No. RWC-3-Hl.
The ISI program was being followed, personnel were properly qualified, procedures were available, personnel were familiar with equipment and methods being employed, results were appropriately recorded and procedure technical attributes were being followed for each of the types of inspection.
No items of noncompliance or deviations were identified.