Corrected Copy of Which Forwarded IE Insp Repts 50-269/79-19,50-270/79-17 & 50-287/79-19 on 790723-26.No Noncompliance Noted.Insp Rept Numbers and Insp Dates Revised
ML19249E974
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 09/10/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19249E970 List:
References
NUDOCS 7910020808
Download: ML19249E974 (2)


See also: IR 05000269/1979019

Text

.

.

Corrected Copy Issued

September 10, 1979

/paancy 'o

UNITED STATES

.

! 3 y, g (' o

NUCLEAR REGULATORY COMMISSION

\\

v

-

E

REGION 11

3*

' Ii

101 MARIETT A sT., N.W., SUITE 3100

o,

/

g * *v

ATLANTA, GEORGI A 30303

,

"*

AUG 2 31979

In Reply Refer To:

.

RII:NE

50-269/79-19

50-270/79-17

50-287/79-19

.

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 33189

Char 1ctte, N C 28242

Gentlemen:

-

This refers to the inspection conducted by N. Economos of this office on

July 23-26, 1979, of activities authorized by NRC Operating License Nos. DPR-38,

DPR-47 and DPR-55 for the Oconee 1, 2, and 3 facilities, and to the discussion

of our findings held with J. E. Smith at the conclusion of the inspection.

Areas examined during the inspection and our findings ar.: discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be p1xed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed 'in the Public Document Room.

_ . -

-

10i'4

052

.

".910020808

.

.

.

  • $UG I 3

e

.*:

Duke Power Coupany

-2-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

'

-

-

sf

a

C. E. Merp y, Chi

Reactor Construction and Engineerfsg

Support Branch

Raclosure:

' Inspection Report Nos. 50-269/79-19,

50-270/79-17 and 50-287/79-19

cc w/ encl:

J. E. Smith, Station Manager

-

,

P. O. Box 11?a

Seneca, S C 29678

-

1074