IR 05000387/1979021

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-387/79-21 & 50-388/79-12 on 790618-29 & 0709-27.Noncompliance Noted:Failure to Control Drawings
ML17138A945
Person / Time
Site: Oconee, Susquehanna  Duke Energy icon.png
Issue date: 09/11/1979
From: Gallo R, Mccaughy R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML17138A940 List:
References
50-387-79-21, 50-388-79-12, NUDOCS 7911210559
Download: ML17138A945 (16)


Text

U.S.

NUCLEAR PEGULATORY COMMISSION OFFICE OF INSPECTION AiND ENFORCEMENT Region I 50-387/79-21 Report No.

50-388/79-12 Docket'o.

50-388 CPPR-101'icense No.

CPPR-102 Priority Category A

Licensee:

Penns lvania Power

& Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Facility Name:

Susquehanna Steam Electric Station, Units 1 and

Inspection at:

. Berwick, Pennsylvania Inspection conducted:

June 18-29 and July 9-27, 1979 P

Inspectors

"~ /

. zb /W R.

M. Gallo, nt Reactor Inspector r/>//

date sign d

date signed Approved by:

.

~

re/ 'p~

R.

W. McGaughy'ef, Projects Section, RC&ES B

n date signed date sig.ed Ins ection Surname;:

Unit 1 Ins ection on June 18-29 and Jul 9-27 1979 Re ort No. 50-387 79-21 Areas Ins ected:

Routine inspection y the resident inspector of work activities re ative to:

installation and welding of reactor coolant pressure boundary and other piping; cable pulling activities; and installation of safety related com-ponents.

The inspector also performed plant tours and reviewed licensee action on previously identified items.

The inspection involved 100 inspector-hours, including 14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> during off shifts, by the NRC resident inspector.

Results:

Of the four areas inspected, no items of noncompliance were identified

~n t ree areas; one apparent item of noncompliance was identified.

(Infraction failure to control drawings in accordance with an approved procedure - Paragraph 7.a).

Region I Form 12 (Rev. April 77)

I

Ins ection Summar (Continued)

Unit 2 Ins ection on June 18-29 and Jul 9-27, 1979 Re ort No. 50-388/79-12

~AI d:

Th i

p p

f d

p d

d action on previously identified items.

The inspection involved 4 inspector-hours by the NRC resident inspector.

Results:

No items of noncompliance were identifie Persons Contacted DETAILS Penns lvania Power and I.i ht Com an Note L. Ballard, Site QAE R. Beckley, Site QAE G. Burvis, Site QAE P. Capotosto, Site QAE E. Carroll, Site QAE T. Clymer, Site QAE S. L. Denson, Assistant Project Construction Manager R.

H. Featenby, Project Construction Manager M. Gorski, Resident Engineer J. Green, Resident NQAE T. F. Oldenhage, Resident Engineer A. R. Sabol, Manager, Nuclear Quality Assurance H. Stokes, Senior Project Engineer, Construction Bechtel Cor oration Y. Anada, Civil QAE J.

Dahnert, Piping QCE M. Daubenheyer, Project Superintendent Services D. Dharia, Field Engineer D. Donati, Lead Electrical QCE M. A. Drucker, Electrical QAE G. Gelinas, Lead Piping/Mechanical QCE N.

D. Griffin, Assistant Project Field Engineer J.

Khandar, Mechanical QAE A. Konjura, Mechanical QAE R.

Lamb, Assistant Lead Welding QCE T. Minor, Project Field Engineer H. Lilligh, Project QAE J. O'ullivan, Assistant Project Field Engineer B. Ott, Lead Welding QCE K. D. Peterson, Resident Project Engineer W. Ross, Lead Welding Engineer

G. Schrader, Project Field Engineer N. 0. Shah, Resident Civil Group Supervisor K. Stout, Assistant Project Field QCE E. Stumpf, Area Lead Electrical Engineer C. Turnbow, Field Construction Manager 4,

1 1,2,3,5

2, 3, 4,

1, 2, 3, 4,

1

4

1 4,

4.

1,

1 1, 3, 4,

1

General Electric Com an Note G. S. Bragan, Installation Manager E. A. Gustafson, Site Manager (Nuclear Energy Business Group)

J.

C. Walker, gA/gC Representative Nuclear Installation Services Com an

.

NISCo T. S. Kopac, Site Manager 0. Demiranda, FACE J. Reinier, Field gA/gC Manager Peabod Testin Com an M. Whalen, NDE Supervisor Pro rammed and Remote S stems PAR C. Odendahl, Field Service Representative

'Notes 1 - denotes those present at exit 2 - denotes those present at exit 3 - denotes those present at exit 4 - denotes those present at exit 5 - denotes those present at exit interview, June interview, June interview, July interview, July interview, July 22, 1979.

29, 1979.

~

13, 1979.

20, 1979.

27, 1979.

2.

The inspector also interviewed other PPRL employees as well as employees of Bechtel, Peabody Testing Company and General Electri,c Company.

Plant Tour - Units 1 and

The inspector observed work activities in progress, completed work and plant status in several areas of the plant during general'-inspection

~

of the plant.

The inspector examined work for. any obvious defects or noncompliance with regulatory requirements or license conditions.

Particular note was taken of, presence of'uality control, inspectors and quality control evidence such as inspection records, material identification, nonconforming material identification, housekeeping

'nd equipment preservation.

The inspector interviewed craft personnel, supervision and guality Control personnel as such personnel were available in the work areas.

No items of noncompliance were. identifie '

3.

Licensee Action on Previous Ins ection Findin s

'a ~

b.

(Open)

Unresolved Item (387/78-17-03):

Classification of Reactor Building Crane Rails as "Non-g".

The inspector noted that Drawing C-268 provides for the purchase of crane rails, crane rail clamps, and filler plates for the Seismic Category I Refueling Platform as "Non-g".

This classification appears to be similar to the classification of the reactor building crane rails as

"Non-g" identified in Inspection Report 387/78-17.

The inspector stated that the classification of both reactor build-ing and refueling platform rails and supports would be considered as a generic item and was still under review by the NRC.

(Closed)

Unresolved Item (387/78-18-01; 388/78-17-01):

Reactor Coolant Pressure Boundary Piping - Review of Storage and Maintenance.

The inspector verified that the Bechtel Field Storage and Maintenance group had issued

"Equipment Maintenance Requirements and Record" cards for. both Unit 1 and Unit 2 GE supplied piping.

The inspector also verified that routine inspections were being conducted and examined by site gC in accordance with the requirements of Project Special Provisions Notice G-5 1 Revision 4.

The inspector reviewed the com-pleted MCAR No. 1-26 which documents licensee actions to reduce defic-iencies in storage and maintenance and promptly resolving identified deficiencies.

C.

The inspector had no further questions on this matter at, this time.

(Closed)

Unresolved Item (387/79-03-02):

Safety Related Pipe Sup-port - Records.

The inspector reviewed selected detailed pipe support drawings asso-ciated with guality Control Inspection Report (gCIR) 26.0-M213-A1-296 to verify that the weld procedure specified on the hanger drawing had been documented on the gCIR.

No discrepancies were identified.

The inspector also verified that an in-process gCIR for support SP-HCB-138-1 had been issued and the inspections completed.

In addition, the Project Field guality Control Engineer (PF(CE) completed a review to verify that other similar missing gCIR'.s did not exist.

The PF(CE approved instructions to appropriate gC Engineers regard-ing the verification of in-process inspection records prior to com-pletion of the final gC inspection.

The inspector had no further questions on this matte d.

. (Closed)

Unresolved Item (387/79-03-03)

Pipe Support Seismic Classification.

Pipe support GBB-109-927 detailed drawing has'.been revised to requir e it toi.be Seismic Category I.

This information agrees with Bechtel Drawing M-199.

The inspector verified that the referenced Stress Isometric Drawing, 864-J, included the seismic calculation results for GBB-109-H27.

e.

The inspector also reviewed additional detailed support drawings on the GBB-109 line.

All supports were identified as Seismic Category I.

The inspector had no further questions on this matter.

(Closed)

Noncompliance (387/79-10-02):

Failure to Follow Procedures for the Control of Nonconforming I'tems.

The inspector reviewed actions taken regarding Nonconformance Reports 3350 and 3521.

The Nonconformance Reports had been dispositioned and closed as stated in the licensee's letter to the'NRC dated June'll, 1979.

The inspector interviewed Field Engineering and guality Control per-sonnel regarding the requirements of Field Inspection Procedure G-3.

Personnel interviewed were knowledgeable of.the requirements restric-ting work on nonconforming items.

The inspector reviewed six addi-tional Nonconformance Reports to verify that no work had been accom-plished without appropriate disposition or Conditional Release.

Documentation reviewed by the inspector included:

Project Construction Manager memorandum File No.. 40.d.487, dated March 13, 1979.

Project Field guality Control Engineer memorandum GCS-607, dated May 29, 1979.

Nonconformance Report Nos.:3560, 3602, 3612, 3692, 3831 and 3853.

The inspector had no further questions on this matter at this time.

(Closed)

Unresolved 'Item.(387/79-15-06):

Classification, of Support Steel for Hydraulic Control Unit The licensee has determined that the subject structural support steel is safety-related.

The inspector examined the Bechtel "(-

List" Revision 10A of May 1979, which now includes this steel.

The inspector revi'ewed NISCO installation inspection records for this support steel.

NISCO had always considered the steel as safety-'related and had been conducting their routine inspection of this material.

The inspector also reviewed Bechtel gC Surveil-lance Records for the NISCO subcontract.

The Bechtel gC surveil-lance reports now include the installation of support steel for the Hydraulic Control Units.

The inspector had no further questions on this matter.

4.

Reactor Coolant Pressure Boundar and Safet -Related Pi in a.

Recirculation S stem Nozzle Modification - Unit

Cg The inspector reviewed procedures and observed work in progress relative to the Recirculation System nozzle modification.

The procedures and work were examined to verify conformance with ASME Section III thru Summer 1976 Addenda and Section XI 1974 edition for General Electric Installation and Service Engineering (GE I&SE) work; and ASME Section III thru Winter 1972 Adden'da for Bechtel work; and conmitments in PPSL letters, to the NRC, PLA-291 dated September 25, 1978 and PLA-350 dated May 4, 1979.

Procedures reviewed included:

Bechtel FCI-M-174 Revision 2.

GE IPSE Procedures:

SRSE 1-4, Revision 1; SRSE 1-,7, Reyision 5;

SRSE l-ll, Revision 3; and SRSE 1-32, Revision

.2.

The inspector observed work in progress and verified conformance to the applicable procedures:

SRSE l-ll and FCI-M-174.

Specific work evolutions observed included:

Cutting and rigging of external, jet pump risers:

RD-1-A4 RD-1-A6 RD-1-A7 RD-1-A8 RD-1-B4 RD-1-B5 RD-1-B6 RD-1-B8

Cutting and Machining of recirculation nozzles.

N2B N2C N2G N2H During the work in progress, the licensee has identified discrep-ancies during the modification work.

The conditions noted are documented in accordance with applicable QA Manual Requiiements including:

Nonconformance Reports:

Bechtel-4072, 4092; GE IPSE - Nos.

1-9 ll and 12.

The inspector observed Ultrasonic Testing (UT) of the Recirculation System External Jet Pump riser weld mockup.

The UT of this mockup was accomplished in accordance with FCI-M-174 and Bechtel Technique UT-100 Revision 2.

The mockup was considered necessary by the licensee to verify that the final weld configuration could be ultra-sonically examined during Pre-Service and In-Service inspection.

The development of a procedure suitable for field application is being pursued by the Pre-Service inspection contractor.

No items of noncompliance were identified.

b.

Pi in Hork in Pro ress - Unit

The inspector reviewed work in progress.for the turnover of'he Station Service Hater System to the Integrated Startup Group (ISG)

for testing.

The system turnover includes portions of the safety-related Emergency Service Hater System.

The inspector reviewed

. turnover documentation to verify that procedural requirements were being observed including such aspects as:

documentation and correc-tion nonconforming conditions, review by site QA and QC, documenta-tion of turnover exceptions, and approval signatures.

The above activities were evaluated against criteria established in the following documents:

PSAR Appendix D.

FSAR Sections 3.2,.3. 13,.9.2.1 and 9.2. 5.

Bechtel Specifications M201,.M204,and M213.

Bechtel Field Procedure G-19, Revision (R

Project Special Provisions Notice G-7.4, Revision 0.

ISG Adminsitrative Directive 6.1, Revision 4.

During review of this turnover, the inspector noted that pipe sup-ports JRD-129-H9 and JRR-141-1-H6 were documented as Seismic Cate-gory II on the respective detailed hanger drawings.

These pipe supports appear to be included as restraints described by Regula-tory Guide 1.29, Paragraph 3.

The inconsistency between Regulatory Guide 1.29, as coranitted to -in FSAR Section 3.13, and the drawing classification of these pipe supports was documented by Bechtel gA on IOM 1237 dated July 16, 1979.

Specific pipe supports identified by the, licensee to possibly have incor rect seismic classification are included as Item No.

2905 on the system turnover exception form. 'his matter is considered unresolved pending resolution of the licensee's turnover exception item.

(387/79-21-01)

5.

Reactor Coolant Pressure Boundar and Safet Related Pi in Weldin The following activities were examined and the inspector verified that they were being performed in accordance with ASME Section III and Section IX Codes, the PSAR Appendix D, the Bechtel guality Assurance Manual Section III, the NISCO Field gA Manual, site specifications M164 and M204 and drawing M199, Peabody Testing Procedure IPPT-300-39-03, NISCO Welding Procedure 80.5.1-180 Revision B, and General Electric Procedure GEK'-33246A.

a.

Weldin

- Unit

Control Rod Drive. Housing No. 06-43 Insert and Withdraw Lines.

The inspector verified selected detail drawings, welding procedure, welder qualification, quality control documentation, weld appearance, welding variables and nondestructive'esting.

No items of noncompliance were identified.

b.

Nondestructive Testin

- Unit

Liquid Penetrant Testing of Weld Joint No.

DLA-104-3 FW4.

The inspector verified surface preparation, qualification of examiner and test technique.

No items of noncompliance were identifie.

Deficienc in Cable Pullin Activities The licensee has reported a deficiency in cable pulling activities in accordance with 10 CFR 50.55(e).

The deficiency involves damage to

'safety-related cables pulled through embedded conduit.

The licensee issued a Stop Work order for all cable pulling on June 14, 1979.

On June 26, 1979, the licensee authorized a temporary release allowing the resumption of cable pulling under specified constraints.

The in-spector verified that the prerequisites to resumption of'able pulling had been accomplished.

Inspection Report 50-387/79-23 documents an inspection of cable pulling activities.

Documents reviewed by the inspector included:

PP8L Deficiency Report No. 0096.

Bechtel Management Correction Action Request 1-.35.

PPSL letters PCLBC dated June 22, 1979 and PCLBC 2845. dated June 26, 1979.

Bechtel letter BCLPC-6306 dated June 25, 1979.

No items of noncompliance were identified.

7.

Installation of Safet -Related Com onents

~

~

~

a.

Refuelin Platform - Unit

The inspector observed work in progress relative to installation of the Refueling Platform MPL No. F21-003.

The inspector noted that vendor drawings used for installation work had not been assigned Bechtel print numbers nor had they been stamped as required by Field Procedure FP-G-4.

The inspector was'informed that Nonconformance Report No. 4063 had identified the lack of approved vendor drawings.

A conditional release'to allow insta-llation work to proceed was granted, based on approval of the drawings by the Bechtel Resident Engineer.

However, the Resident Engineer's approval of the drawings did not include a drawing

'evision number nor did it speci'fy that the documents should be controlled for use in the field.

The inspector stated, that the failure to control the vendor drawings in accordance with FP-G-'4 was contrary to the requirements of 10 CFR 50, Appendix B, Cri-tei ion V.

(387/79-21-02}

IW

b.

RHR Heat Exchan er =Cleanin

- Unit

The inspector observed work:in progress relative to the cleaning or the Unit

RHR Heat Exchangers, items lE 205A and B.

The clean-ing required removal of the Heat Exchanger shell to provide access for cleaning U-tubes and the inside surface of the shell.

.The inspector evaluated the work against criteria established by the PSAR Appendix D; Bechtel Field Procedure FP-N-2, Revision 1; and the FSAR Section 9.14.2.7.

Documents reviewed by the inspector included:

FP-N-2, Equipment Installation Plan, dated July.12, 1929..

General Electric Field Deviation Disposition peport No.

KR1-144, Revision 1 and KR1-50, Revision 2.

Nonconformance Report Nos.

3602 and.428.

An unresolved item 387/78-16-03 regarding the storage pf..the pHR Heat Exchangers remains unresolved.

1)

No items of noncompliance were identified.

8.

Unresolved Items Unresolved items are matters about which more informqtion is.l.equired to ascertain whether they are acceptable items,'items of noncompliance; or deviations.

An unresolved item disclosed during the inspection is'dis-cussed in paragraph 4.b.'.

Exit Interviews At periodic intervals during the course of this inspection, meetings were held with facility management ('ates and attendees are denoted jn Detail 1) to discuss inspection scope and finding