IR 05000266/1981003
| ML19347F114 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 05/08/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML19347F115 | List: |
| References | |
| NUDOCS 8105150276 | |
| Download: ML19347F114 (1) | |
Text
DC_
pn nr uq'o
UNITED STATES
- O NUCLEAR REGULATORY COMMISSION
^
n U
$
REGION 111 b
I 799 ROOSsVELT ROAD g,*****,/
otsu ettvu. ittisois sois7 MAY B 1981 G?LI.jp7 Docket No. 50-266 d
Docket No. 50-301 D
'
(
H
~
-
Wisconsin Electric Power Company g[(( 11. ggs, 42[O
--
ATTN:
Mr. Sol Burstein g_
Executive Vice President j
Power Plants
.
-
231 West Michigan 4,
Milwaukee, WI 53201
/
t*
- I ta Gentlemen:
Thank you for your letter dated April 27, 1981, informing us of the steps you have taken to correct the noncompliance which we brought to your attention in Inspection Reports No. 50-266/81-03 and No. 50-301/81-03 forwarded by our letter dated March 16, 1981. We will examine these matters during a subsequent inspection.
Your cooperation with us is appreciated.
Sincerely, f
/ 'y )-J
_ h.
C. E. Norelius, Acting Director Division of Engin~ ring and Technical Inspection cc:
G. A. Reed, Manager
-
cc w/1tr dtd 4/27/81:
Central Files
.
Reproduction Unit NRC 20b AE0D Resident Inspector, RIII cc w/ltr dtd 4/27/81 w/o Part 2.790(d) attachment PDR Local PDR NSIC
!
TIC John J. Duffy, Chief Boiler Inspector Peter Anderson, Wisconsin's Environmental Decade Stanley York, Chairman Public Service Commission 8105150 Nh