IR 05000266/1981008
| ML19350E876 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 06/16/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML19350E877 | List: |
| References | |
| NUDOCS 8106230610 | |
| Download: ML19350E876 (1) | |
Text
o
\\
.,,
O
,JUN 1 6 1981
.
Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN:
Mr. Sol Burstein Executive Vice President Power Plants 231 West Michigan Milwaukee, WI 53201 Gentlemen:
Thank you for your letter dated May 8,1981, informing us of the steps you have taken to correct the noncompliance which we brought to your attention in Inspection Reports No. 50-266/81-08andNo.50-301/81-07 forwarded by our letter dated April 14, 1981.
The proposed corrective actions address our primary concern, namely that for calibrations which are out of tolerance, a more detailed written evaluation and justification should be made by the I&C Engineer.
As indicated in the inspection report and by the severity level of the violation, we considered this to be a documentation problem and not a challenge of the operability and accuracy of the instruments involved.
We will examine the implementation of your corrective actions during a subsequent inspection.
Your cooperation with us is appreciated.
Sincerely, C. E. Norelius, Acting Director Division of Engineering and Technical N
ec:
G. A. Reed, Manager O[
Go
.a
,
cc w/1tr dtd 5/8/81:
8gkg d[I.
/
'
DMB/ Document Control Desk (RIDS)
J;,,Y
//[
u Resident Inspector, RIII pa
,
John J. Duffy, Chief
%
Boiler Inspector p
Peter Anderson, Wisconsin's
'- j Dh Environmental Decade Stanley York, Chairman Public Service Conunission
.
RIII RIII RII RII RI/I r/so r
nklin Sp ard Yh 6/10/81 k
'
- 8106230 W 4[*
.
.
.
.