IR 05000301/1981008

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-301/81-08,on 810427-0501 & 04-08.No Noncompliance Noted.Major Areas Inspected:Preparations for Refueling & Maint/Refueling Activities
ML20004E539
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/28/1981
From: Guldemond W, Jackiw I, Ring M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20004E538 List:
References
50-301-81-08, 50-301-81-8, NUDOCS 8106120303
Download: ML20004E539 (3)


Text

.

.

O U.S. NUCIIAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No.

50-301/81-08 Docket No.

50-301 License No.

DPR-27 Licensee: Wisconsin Electric Power Company 231 West Michigan Milwaukee, WI 53203 Facility Name: Point Beach, Unit 2 Inspection At: Two Creeks, WI Inspection Conducted: April 27 - May 1, and May 4-8, 1981 d7d/

Inspectors:

g

[!fI.

W G.

u

'

u 1. Jack /w, Acting Chief

/

w

[/8/

Approved By:

Test [Jrogram Section

'

Inspection Summary Inspection on April 27 - May 1, and May 4-8, 1981 (Report No. 50-301/81-08)

Areas Inspected: Routine, announced inspection of preparations for refueling, refueling activities, and maintenance activities during the refueling outage on Unit 2.

The inspection involved a total of 38 inspector-hours onsite by one NRC inspector including six inspector hours on off shifts.

Results: In the three areas inspected, no apparent items of noncompliance or deviations were identified.

8106120303

..

_ -.

.-

.-

.- -. -

- -

-

--

.

.

.

.

e DETAILS 1.

Persons Contacted

  • G. A. Reed,' Manager, Nuclear Operations
  • R. E. Link, Superintendent, Engineering, Quality and Regulatory J. J. Zach, General Superintendent
  • F. A. Zeman, Office Supervisor R. L. Harris, Reactor Engineer

,

W. J. Herman, Superintendent, Mai cenance and Construction

'

I. L. Bleeker, SRO/ Core Loading Supervisor E. Ziller, SR0/ Core Loading Supervisor Additional plant technical and administrative personnel were contacted during the course of the inspection by the inspector.

  • Denotes those personnel present during the exit meeting.

2.

Preparation for Refueling (Unit 2)

The inspector verified that technically adequate procedures for Unit 2 Refueling 7 were approved for fuel handling, transfers, core vetification, inspection of fuel to be reused and handling of other cot; internals. The following licensee procedures were examined during this review:

WMTP 2.1 Rev. O Refueling 7, Core Reloading WMTP 2.2 Rev. O Refueling 7, Post Critical Path Fuel Assembly Inspection RP-1A Rev. 12, Preparation for Refueling RP-1C Rev. 8, Refueling RP-1D Rev. 5, Filling and Draining the Refueling Cavity RP-4A Rev. 2, Full Length Control Rod Drive Shaft Unlatching and Latching The inspector verified that the licensee's 10 CFR 50.59 safety

,

l evaluation of the reload core showed that prior NRR review is not

!

required. The inspector also reviewed the licensee's program for overall outage control.

No items of noncompliance or deviations were identified.

3.

Refueling Activities The inspector verified that prior to the handling of fuel in the core, all surveillance testing required by the technical specifica-l tions and licensee's procedures had been completed; verified that

'

during the outage the periodic testing of refueling related equip-ment was performed as required by technical specifications; and l

observed three shifts of fuel handling operations (removal, inspection, and insertion) and verified that activities were performed in accord-i ance with technical specifications and approved procedures. During-2-1..

,.

.

- - _ _,

- - _ -, _ _ - -.

. -

.

..

.

.-.

- -

__

. _ _

_. _

,...

the time frame of the inspection, the licensee incorrectly engaged a fuel eler2ent with the gripper fingers extended in the latch position undernesth the leafsprings of the element rather than under the top plate of the top nozzle. Since the analysis of the circumstances surrounding this event was incomplete at the time of the exit, the Senior Resident inspector agreed to complete the report on this event. However, the inspector became concerned that the licensee's procedure did not require the manipulator crane operator to verify the z-z axis of the gripper to ensure it is correctly inserted in the element prior to engaging. The concern was expressed to manage-ment who stated use of the z-z axis tape was normal practice and that they would review its use for inclusion into the procedure.

Additionally, the inspector verified that containment integrity was maintained as required by technical specifications and that staffing during refueling was in accordance with tedhnical specifications and approved procedures. The inspector verified that good housekeeping was maintained on the refueling areas; however, the inspector also became concerned that the licensee did not appear to eave an account-ability system (such as the use of logbooks) for the control of loose articles which may fall into the cavity.

This concern was discussed with management.

No items of noncompliance or deviations were identified.

4.

Maintenance-Refueling The inspector reviewed procedure PT.R-1 Rev. 3, Main Steam and Pressurizer Safety Valve Setpoint Test and the associated main-tenance work activity for the main steam safety valve setpoint checks. The inspector verified maintenance procedures include administrative approvals for removal and return of systems to service; hold points for inspection / audit and signoff by QA or other licensee personnel; provisions for operational testing following maintenance; reviews of material certifications; provisions for assuring LCO requirements were met during repair; provisions for housekeeping during and following maintenance; and responsibilities for reporting defects to management.

The inspector observed the main steam safety valve setpoint check maintenance activites and verified work was accomplished in accord-

,

ance with approved procedures and by qualified personnel.

No items of noncompliance or deviations were identified.

5.

Exit Interview The inspector met with licensee representatives (denoted in Paragraph 1)

on Friday, May 8, 1981, and summarized the scope and findings of the inspection activities.

-3-

'