IR 05000266/1981024
| ML20041D509 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 03/01/1982 |
| From: | Hind J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Burstein S WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20041D510 | List: |
| References | |
| NUDOCS 8203050372 | |
| Download: ML20041D509 (1) | |
Text
r
.
l March 1, 1982
as b
&
Docket No. 50-266(DEPOS)
RECElVED Docket No. 50-301(DEPOS)
[
ggg 05198gs
_
as
-
Wisconsin Electric Power Company
,$ 2 ar g I
'
'
ATIN:
Mr. Sol Burstein
\\
%4 Executive Vice President Power Plants
'D'
g
_
231 West Michigan
-
Milwaukee, WI 53201 Gentlemen:
Thank you for your letter dated February 8, 1982, informing us of the current status of your investigation in identifying and isolating the leakage of tritiated water in groun'dwater which we discussed in our Inspection Report Nos. 50-266/81-24 and 50-301/81-25 forwarded by our letter dated January 6, 1982. We are evaluating the information in your letter and will be in contact with you regarding this matter in the near future.
Your cooperation with us is appreciated.
Sincerely, d
'
t/c
,.
f Iin, Director
.
ivision of Emergency Preparedness and Operational Support cc:
G. A. Reed, Manager cc w/Itr dtd 2/8/82:
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII John J. Duffy, Chief Boiler Inspector Peter Anderson, Wisconsin's Environmental Decade Stanley York, Chairman Public Service Commission RIhItw R4II ce 1geond
.
RII RIII RIII RII
'
Oestbann/jp Schumacher F
3r ello H
2/23/82 p
gy J 7 y 2[gG SG 3/f l
P203050372 820301 61 (
{DRADOCK05000
,
--s