IR 05000261/1989009

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/89-09. Implementation of Corrective Actions Will Be Examined During Future Insps
ML14191B129
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 08/16/1989
From: Reyes L
NRC Office of Inspection & Enforcement (IE Region II)
To: Eury L
Carolina Power & Light Co
References
NUDOCS 8908250172
Download: ML14191B129 (2)


Text

ACCELERATED DISTRIBUTION DEMONSTRAION SYSETEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

SSION NBR:8908250172 DOC.DATE: 89/08/16 NOTARIZED: NO DOCKET #

lClIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261 AUTH.NAME AUTHOR AFFILIATION REYES, Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION EURY, Carolina Power & Light C SUBJECT: Ack receipt of 890726 ltr informing NRC of steps taken to correct violations noted in Insp Rept 50-261/89-0 DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR ENCL _

SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response S

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD

LO,R

D INTERNAL: AEOD

AEOD/DEIIB

AEOD/TPAD

DEDRO

D LOIS,ERASMIA

NRR SHANKMAN,S

NRR/DEST DIR

NRR/DLPQ/PEB

S NRR/DOEA DIR 11

NRR/DREP/EPB 10

NRR/DREP/RPB 10

NRR/PMAS/ILRB12

NUDOCS-ABSTRACT

OE LI-E-BERMAN,J

OGC/HDS1

&E TLE

1 RES MORISSEAU,D

RGN2 FILE 01

EXTERNAL: LPDR

NRC PDR

NSIC

R I

S TOTA NUBER F CPIESREQIRED LTR 24ENC A/

Docket No. 50-261 License No. DPR-23 Carolina Power and Light Company ATTN: Mr. Lynn W. Eury Executive Vice President Power Supply P. 0. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-261/89-09 Thank you for your response of July 26, 1989, to our Notice of Violation issued on June 26, 1989, concerning activities conducted at your H. B. Robinson facility. We have evaluated your response and found that it meets the require ments of 10 CFR 2.20 We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte

Sincerely, Luis A. Reyes, Director Division of Reactor Projects cc:

C. R. Dietz, Manager Robinson Nuclear Project Department R. E. Morgan, Plant General Manager State of South Carolina bcc: NRC Resident Inspector Document Control Desk R H:

P RII:DRP RII:DRP RIIDD P ar 011 HDnc DVerrelli A.-BHehl 08/5/89 08/

/89 08//4/89 08/14/89-rC)1o2 A 0500