IR 05000261/1989001

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/89-01
ML14191B108
Person / Time
Site: Robinson 
Issue date: 04/18/1989
From: Julian C
NRC Office of Inspection & Enforcement (IE Region II)
To: Eury L
Carolina Power & Light Co
References
NUDOCS 8904280120
Download: ML14191B108 (2)


Text

ACCELERATED DISTPJBUTION DEMONSTRATION SYWTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CESSION NBR:8904280120 DOC.DATE: 89/04/18 NOTARIZED: NO DOCKET #

ACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261 AUTH.NAME AUTHOR AFFILIATION JULIAN, Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION EURY, Carolina Power & Light C SUBJECT: Ack receipt of 890406 ltr informing NRC of steps taken to correct violations noted in Insp Rept 50-261/89-0 DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR j ENCL 0 SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response D

NOTES:

S RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD

LO,R

INTERNAL: AEOD

AEOD/DEIIB

DEDRO

NRR SHANKMAN,S

NRR/DEST DIR

NRR/DLPQ/PEB 11

NRR/DLPQ/QAB 10

NRR/DOEA DIR 11

NRR/DREP/EPB 10

NRR/DREP/RPB 10

NRR/DRIS DIR 9A

NRR/PMAS/ILRB12

NUDOCS-ABSTRACT

0 BERMAN,J

OGC/HDS1

G b

1 RGN2 FILE 01

ERNAL: LPDR

NRC PDR

NSIC

I D

S A

D D

NOTE TO ALL "RIDS" RECIPIENTS:

S PLEASE HELP US TO REDUCE WAST!

OTrACT THE DDaUT CDNR)L DESK, ROOM Pl-37 (EX ) 20 ELInDTE YOUR NAME Fa DISTRBUTION LISTS FOR DOCMTSMI YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR

ENCL Q-3-

APR 18 19889 Carolina Power and Light Company ATTN:

Mr. Lynn. W. Eury Executive Vice President Power Supply P. 0. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-261/89-01 Thank you for your response of April 6, 1989, to our Notice of Violation, issued on March 7, 1989, concerning activities conducted at your Robinson facilit We have evaluated your response and found that it meets the requirements of 10 CFR 2.20 We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte

Sincerely, Caudle A. Julian, Chief Engineering Branch Division of Reactor Safety cc: C. R. Dietz, Manager Robinson Nuclear Project Department R. E. Morgan, Plant General Manager State of South Carolina bcc: NRC Resident Inspector Document Control Desk RII RH I

RH STingen:td ABelisle HDance 04/in/89 04//y/89 04/1 /89 8904280120 890418 PIR ADOCK 05000261 EPDC:

..T Fo