IR 05000261/1989008

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/89-08
ML15008A132
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 06/29/1989
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Eury L
Carolina Power & Light Co
References
NUDOCS 8907120357
Download: ML15008A132 (2)


Text

ACCELERATED DISTRBTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CCESSION NBR:8907120357 DOC.DATE: 89/06/29 NOTARIZED: NO DOCKET #

FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261 AUTH.NAME AUTHOR AFFILIATION VERRELLI, Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION, EURY, Carolina Power & Light C STBJECT: Ack receipt of 890616 ltr informing NRC of steps taken to correct violations noted in Insp Rept 50-261/89-0 DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR L ENCL 6 SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR E CL PD2-1 PD

LO,R

INTERNAL: AEOD

AEOD/DEIIB

AEOD/TPAD

DEDRO

NRR SHANKMAN,S

NRR/DEST DIR I

NRR/DLPQ/PEB

NRR/DOEA DIR 11

S NRR/DREP/EPB 10

NRR/DREP/RPB 10

NRR/PMAS/ILRB12

NUDOCS-ABSTRACT

0 REB

,J

OGC/HDS1

G FILE

1 RES MORISSEAU,D

.1 RGN2 FILE

1 ERNAL: LPDR

NRC PDR

NSIC

R D

S A

NorE TO ALL "RIDS" RECIPIENTS:

PLEASE EP US TO ME0M =STEI OCNECT THE DOCIME CDNBO L DESK, I0CM P1-37 (EXT. 20079) TO ELIMWICUR-MMB F710 DISTRBUTI LISTS POR DOCUMENTS Y00 IXVT NEEDI OTAL NUMBER OF COPIES REQUIRED: LTTR

ENCL

.4UN 298 Docket No. 50-261 License No. DPR-23 Carolina Power and Light Company ATTN:

Mr. Lynn. W. Eury Executive Vice President Power Supply P. 0. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT: NRC INSPECTION REPORT NO. 50-261/89-08 Thank you for your response of June 16, 1989, to our Notice of Violation issued on May 18, 1989, concerning activities conducted at your H. B. Robinson facility. We have evaluated your response and found that it meets the require ments of 10 CFR 2.20 We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte

Sincerely, David M. Verrelli, Chief Reactor Projects Branch 1 Division of Reactor Projects cc: C. R. Dietz, Manager Robinson Nuclear Project Department R. E. Morgan, Plant General Manager State of South Carolina bcc: NRC Resident Inspector Document Control Desk RII:DRP RII:DRP RCarro 11 HDance'

.

06AJ/89 06/22 /89 8907120357 890629 PDR ADOCK 05000261 FTDL