IR 05000261/1989007

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/89-07
ML14191B120
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 05/19/1989
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Eury L
Carolina Power & Light Co
References
NUDOCS 8906190127
Download: ML14191B120 (2)


Text

ACCELERATED DISTR1BUTION DEMONSTRATION SYSWTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

.

CESSION NBR:8906190127 DOC.DATE: 89/05/19 NOTARIZED: NO DOCKET #

ACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261 AUTH.NAME AUTHOR AFFILIATION VERRELLI, Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION EURY, Carolina Power & Light C SUBJECT: Ack receipt of 890508 ltr informing NRC of steps taken to correct violations noted in Insp Rept 50-261/89-0 DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR

_ ENCL 0 SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

S RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR E CL ID CODE/NAME LTTR ENCL PD2-1 PD

LO,R

INTERNAL: AEOD

AEOD/DEIIB

AEOD/TPAD

DEDRO

NRR SHANKMAN,S

NRR/DEST DIR

NRR/DLPQ/PQEB

NRR/DOEA DIR 11

NRR/DREP/EPB 10

NRR/DREP/RPB 10

NRR/PMAS/ILRB12

NUDOCS-ABSTRACT

S GE.I-EBM N,J

OGC/HDS1

REGJFE

1 RGN2 FILE

1 rERNAL:

LPDR

NRC PDR

NSIC

D NOTE TO ALL "RIDS" RECIPIERIS:

S PIFASE HELP US TO REDUCE WASTE! CDNTACT THE DOCUMENT CONTIL DESK, ROOM P1-37 (EXT. 20079)

tO ELIMINATE YOUR NME FROM DISTRIBUTION LISTS FOR DOCUENS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR

ENCL-2-

XY 19 T99 Docket No. 50-261 License No. DPR-23 Carolina Power and Light Company ATTN:

Mr. Lynn. W. Eury Executive Vice President Power Supply P. 0. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-261/89-07 Thank you for your response of May 8, 1989, to our Notice of Violation issued on April 6, 1989, concerning activities conducted at your H. B. Robinson facility. We have evaluated your response and found that it meets the require ments of 10 CFR 2.20 We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte

Sincerely, (Original signed by HCDance/for)

David M. Verrelli, Chief Reactor Projects Branch 1 Division of Reactor Projects cc:

C. R. Dietz, Manager Robinson Nuclear Project Department R. E. Morgan, Plant General Manager State of South Carolina bcc: NRC Resident Inspector Document Control Desk DRS Technical Assistant RII RII BCarroll HDance 05// /89 05/ 1/89

_906190127 89"0519 PDR ADOCK 05000261 PDC