IR 05000259/1985046

From kanterella
Jump to navigation Jump to search
Safeguards Insp Repts 50-259/85-46,50-260/85-46 & 50-296/85-46 on 850924-27.No Violations Noted.Major Areas Inspected:Power Supply & Access Controls.Details Withheld (Ref 10CFR2.790 & 73.21)
ML20133G686
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 10/07/1985
From: Mcguire D, Tobin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20133G656 List:
References
50-259-85-46, 50-260-85-46, 50-296-85-46, NUDOCS 8510160082
Download: ML20133G686 (1)


Text

. -. _ - . . _ _ _

,

'

. l

. )

g REcoq UP$lTED STATES j f jo, NUCLEAR REGULATORY COMMISSION l

.7 '\ /

d REGION ll 2 ,

101 MARIETTA STnE ET. . .$ ATLANTA GEORGI A 30323

.

'

s, % / -

OCT 101985 Report Nos. 50-259/85-46, 50-260/85-46, and 50-296/85-46 Licensee: Tennessee Valley Authority 500A Chestnut Street, Tower II Chattanooga, TN 37401 Docket Nos. 50-259, 50-260, & 50-296 License Nos. OPR-33, DPR-52, & DPR-68 Facility Nasme: Browns Ferry Nuclear Plant Inspection Conducted: September 24-27, 1985

,

Inspector: bb1Em k (M lei f'l f2f-

W. Tobin, Seedor Security Inspector Date Signed Approvedby:h) . m_

-

/o /!I

'

D. R. McGuire, ChtEf, Physical Security Section D'afh Signed Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards

SUMMARY Scope: This routine, unannounced inspection involved 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> onsite inspecting: Power Supply, Compensatory Measures, Access Controls, Training and Qualification Plan, and Independent Inspection Efforts.

, Results: There were no violations identifie One Inspector Follow-up Item relative to Power Supply was opened (85-46-01).

<

!

,

l l

.

8510160082 851010 PDR ADOCK 05000259 G PDR gNCLostfFt3 C0hTA133

,

'

AFCCUAnp3 INFogg

      • """ stn

"u m our,,, " "tSuan.

L