Forwards Excerpt from IE Insp Rept 50-206/78-08 on 780612-15.No Noncompliance Noted
ML20027E253
Person / Time
Site: 05000000, San Onofre
Issue date: 07/14/1978
From: Book H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Johari Moore
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20027A625 List:
References
FOIA-82-394 NUDOCS 8211120364
Download: ML20027E253 (4)


Text

.

" s

,

,

.

.

-

.

n x

.

.

t

,

.

JUL 14197d Docket tio. 50-206

!

Southern California Edison Co:npany

'

l P. O. Box 800

2244 'n'alnut Grove Avenue Rosemead, California 91770 Attention: fir. Jack B. Moore

Vice President l

l Gentlemen:

f Subject:

iiRC Inspection of San Onofre Unit 1 This refers to tne inspection conducted by flessrs. J. Curtis and H. ilorth of this office on June 12-15, 1978 of activities authorized by llRC License ilo. OPR-13, and to the discussion of our findings held by Mr. Curtis with Mr. Curran and other members of your staff at the conclusion of the inspection.

Areas ex4 mined during this inspection are described in the enclosed inspection report.

tiithin these areas, the inspection consisted of selective examinations of procedures and representative records, inter-views with personnel, and observations by the inspectors.

Ilo iteins of noncompliance with liRC requirements were identified within

{

the scope of this inspection.

I

In accordance with Section 2.790 of tne flRC's " Rules of Practice,"

l Part 2. Title 10, Code of Federal Regulations, a copy of this letter and j

the enclosed inspection report will be placed in the tiRC's Public l

Docu.nent Room.

If this report contains any information that you believe to be proprietary, it is necessary that you submit a written application to this office, within 20 days of the date of this letter, requesting that such information be withheld from public disclosure. The applica-l tion must include a full statement of the reasons why it is claimed that the infornation is proprietary. The application should be prepared so RVQk._

k_

[ Boo

._

_

P r,c, *

Cur /fs:rc k'enslaws ki

' " " ~ " " ' "

r7//V/78-

~7/IP/78 -

7//

78-

-

-

oav a D-

. _.

. _ _.. _...

.

._

Form AIC 318 (Rev. 9 53) A.ICM 0240 W u. s. c.ovs am urwr rnento.a orr ec ts s ere.sas ies 8211120364 820928 PDR FOIA RAPKIN82-394 PDR

-

,3

,.

JUL 14 B78 Southern California Edison Company-2-that any proprietary information identified is contained in an enclosure to the application, since the application without the enclosure will also be placed in the Public Document Room.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be

'

glad to discuss them with you.

Sincerely,

,

g Ort $al rignr4 br 3,

H. E. Book

.

H. E. Book, Chief

.

Fuel Facility and liaterials Safety Branch

Enclosure:

,

IE Inspection Report

-

i j

fio. 50-206/78-08)

,

REGION V==

f Rsport No. 50-206/78-08 l

l Docket No. 50-206 License No. DPR-13 Safeguards Group

,

Licensee:

Southern California Edison Company P. O. Box 800

'

l

.;

Rosemead California 91770 Fscility Name: San Onofre Unit 1 Camp Pendleton, California Inspection at:

.

f Inspection conducted June 12-15, 1978 Inspectors:

I r/

/ Dalte Signed W. R. Curtis

^ k$. YuEw,R,aplation etialist

.

7//W7F

'

' Dat'e Signed aH. S. North, Radiation Specialist Date Signed p

Approved By:

<p.

Ovw j

y

'Date Signed H. E. Book, Chief, Fuel Facility and Summary:

Materials Safety Branch Inspection on June 12-15, 1978 and Telephone Conversations with Licensee Representatives June 21, 26 and 27 (Report No. 50-206778-08)

Areas Inspected:

Routine, unannounced inspection of emergency planning, including observation of emergency drill and drill critique and review of drill records; review of miscellaneous items including continuation of strike contingency plan; shipping cask contamination survey records; discussion with licensee representatives concerning licensee event report action; refueling shutdown plans; process radiation monitoring instrument review; and results of comparative measurements programs for environmental and effluent samples.

The inspection involved 57 man-hours onsite by two NRC inspectors.

Results:

No items of noncompliance or deviations.were identified in the areas inspected.

RV Form 219 (2)

-... _.. - g o

'

-.

  • -

s-6-

,,

memo were tested by driving them to 10 CPS (full scale) with a radiation source and they did not exhibit any evidence of saturation failure or down scale indication.

This test was being documented and records would be available for future inspections.

No items of noncompliance or deviations were identified.

9.

Environmental Protection - Implementation On March 6,1978, the licensee informed the Region V office that the San Clemente city well, one of the environmental sampling locations, had ceased operations.

During the inspection, it was determined that the San Clemente well will remain out of service permanently.

The licensee substituted a sample from a well at the San Clemente Ranch (formerly Highland Ranch). Appendix B, Technical Specification 3.2.3 specifies that drinking water samples will be collected at the Tri Cities, Huntington Beach and at a local well.

The change of the local well sample from San Clemente city to San Clemente Ranch does not represent a deviation from technical specification requirements.

No items of noncompliance or deviations were identified.

10.

Event Report Review

,

On February 27, 1978, the licensee reported pursuant to 10 CFR 20.205(b)(2), the receipt of an empty fuel element transfer cask at thesitewgichexhibitedlocalcontaminationinexcessof22,000 dpm/100 cm.

The cask, NAC-1C, was received on February 27, 1978 from G.E. Morris, Illinois.

The licensee reported that the carrier and the shipper had both been notified.

The contamination was highly localized and no spread of contamination had occurred.

The licensee decontaminated the cask prior to shipment.

The licensee's spent fuel shipping campaign has been completed.

Historically, the licensee made a total of 254 shipments,158 of them in NAC casks, beginning on March 13, 1976.

The licensee has reported rgceipt of NAC casks contaminated in excess of 22,000 dpm/100 cm a total of eleven times. Ten of the contaminated casks were received from G.E. Morris, Illinois. One of the casks was received from Chem Nuclear, Barnwell, S.C.

None of the occurrences resulted in any spread of contamination.

No items of noncompliance or devi'ations were identified.

11.

Exit Interview An exit interview was held with licensee management representatives to review the scope and findings of the inspection.

The inspectors advised that no items of noncompliance or deviations were identified.

.

_

f

.. s

..

i

~

FCTR:Rif0 71-0174

-

Southern California Edison Company

'

ATTil: Mr. William 11. Seaman

'

aef

"

.

'

P.O. Box 800

.

.

,

'

-

,

Rosemead, CA 91770 Gentlemen:

-

"

"

',

.

-

.

i i Enclosed is Quality Assurance Program Approval for Radioactive

.

.-

i.

Material Packages No. 0174, Revision No. O.

.

,

,

,

,

Sincerely,

'

' Original Si'sned b7

CBf3Lggg,EACDONALD

~

.

~

.

Charles E. MacDonald,' Chief

'

l Transportation Branch Divis-ion of Fuel Cycle and Material Safety, 201S5

-

.

Enclosure:

-

-

As stated

.

I

-

J Ti

?4}

-

-

..

l 1!

-

.

.

,

.... k

?,

-

.

_,h)M

~

E,m:

___

\\.

,a

/

fb

,

\\

\\

\\

'

f f

.

eRc ecvm m 5,

US. NUCLEAR R EGULAfonY COMthlSSION 1. APPROV AL NUMBE R

,

0174

'

naasi QUALITY ASSURANCE PROGRAM APPROVAL

-

REVISION NUMBER FOR RADIOACTIVE MATERIAL PACKAGES

'

Pu svant to the Atomic Energy Act of 1954, as amended,the Energy Reorganization Act of 1974, as amended, and Title 10,

.

REGION V==

Report No.

50-206/80-06

,

Docket No.

50-206 License No.

DPR-13 Safeguards croup Licensee:

Southern California Edison Company 2244 Walnut Grove Avenue Rosemead, California 91770 Facility Name:

San Onofre Unit 1 Inspection at:

Camp Pendleton, California Inspection conducted: __, March 3-7, 1980 Inspectors:

it4

[ @ [d H. Curtis, Had1ation 5peClallst Date# Signed Date Signed

-

Date Signed

.

Approved by:

ggg F. We slawski,# Ch f, Rea tor Radiation Safety Section /Dade Signed p

Approved by:

[O

'

.

,

H. E. Book, Chief, Fuel Facility and Materials

~ Date Signed Safety Branch Summa ry:

,

,

Inspection on March 3-7, 1980 Report No. 50-206/80-06 Areas Inspected:

Routine unannounced inspection of the quality control and confirmatory measurements aspects of the Radioactive Waste / Effluent Monitoring Program; follow-up of licensee response to IE Circulars 79-15, 79-21 and Bulletin 80-03; investigation of conditions and licensee action related to LER 80-05 (temperature differential across the circulating cooling water condenser in excess of ETS limits); and independent inspection effort in the areas of spent fuel shipment operations and g

'ified escort refresher training.

The inspection involved a total of 24.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> onsite by one inspector.

Results: No items of noncompliance or deviations were identified in the areas examined.

RV Form 219 (2)

f/

,

<

c

".....

..

,

DETAILS

'

1.

Persons Contacted

  • R. Brunet, SONGS-1 Superintendent

,

  • M. Sullivan, Supervisor Chemical and Radiation Protection, SONGS-1
  • G. Packham, Chemical and Radiation Protection Engineer S. Medling, Chemical and Radiation Protection Engineer M. Wharton, Nuclear Engineer
  • E. Bennet, Chemical and Radiation Protection Foreman
  • G. MacDonald, S.C.E. Quality Assurance and other members of the S.C.E. Staff
  • Indicates those present at the exit interview.

( 2.

Operations-General Spent Fuel Shipmen In the period during which the inspection was conducted the plant was in the normal operating mode at full power (~450 MW) until Thursday March 6th when the rupture disc of the Pressurizer Relief Tank (PRT) was accidently blown out during a tank purging operation.

The facility was taken to hot shutdown for twelve to fifteen hours

'

to replace the rupture disc and return the PRT to operable ~ status.

This event was reported to Region V by the resident-inspector who would follow up on the item.

-

Spent Fuel movement and shipment operations were under way during the inspection.

Loaded fuel cask decontamination, A T testing, and licensee radiation monitoring surveys were observed by the inspector.

The radiation monitoring operations were discussed with radiation protection personnel and fuel shipment procedures were examined. A survey of radiation levels around the loaded shipping cask was made and levels noted confirmed those reported by the licensee.

No items of noncompliance or deviations were identified.

3.

Radioactive Waste Systems - Quality Assurance and Confirmatory Measurements Quality Control The licensee's program for quality control of analytical measurements has not undergone any major change in the past two years.

Laboratory procedures are reviewed internally under the standard SCE review and revision program.

Small revisions and changes have been made in laboratory procedures in response to changes in published standard chemical procedures and changes announced in ASTM publications.

,

--

.-

-,

., -

-

r

-

-.

-,,e

-

-,

e-,

,

,,