Division of Construction Inspection and Operational Programs
From kanterella
Jump to navigation
Jump to search
Division of Construction Inspection and Operational Programs (NRC/NRO/DCIP) | |
|---|---|
Sunhee Victoria
5 February 2007 - 19 March 2019 | |
| HQ Office | |
Region 1Division
Branch
Region 2Division
Branch
Region 3Division
Branch
Region 4Division
Branch
| |
| [from] | MONTHYEARML19077A3832019-03-190Issue date: 19 March 2019 Title: RIC Thank You Letter to NUPIC ML19077A3822019-03-190Issue date: 19 March 2019 Title: RIC Thank You Letter to NNSA ML19056A4192019-02-220Issue date: 22 February 2019 Title: Nuclear Regulatory Commission February 2018 EPRI Joint Utility Task Group Presentation ML19035A6152019-02-040Issue date: 4 February 2019 Title: Letter to T. Owen, Paxton & Vierling Steel Company/Owen Industries, from T. Mcginty, NRC, NRC Office of Investigations Report No. 2-2018-007 - Release of OI Synopsis. ML18352A9212019-01-170Issue date: 17 January 2019 Title: Completion of Action Items from the 2017 Inspections, Tests, Analyses, and Acceptance Criteria Demonstration Project ML18334A2892019-01-090Issue date: 9 January 2019 Title: Responses and Revision to Two Notices of Nonconformance Contained in Nuclear Regulatory Commission Inspection Report 99900345/2018-201 ML18347A4792018-12-140Issue date: 14 December 2018 Title: Fourth Extension Request for Nuclear Regulatory Commission Office of Investigation Report 3-2017-003 and Notice of Violation OI 2-2018-010, Letter to K. J. Connell, Framatome Inc., from W. B. Jones, NRC, NRC Office of Investigations Report No. 2-2018-010 - Release of OI Synopsis2018-12-110Issue date: 11 December 2018 Title: Letter to K. J. Connell, Framatome Inc., from W. B. Jones, NRC, NRC Office of Investigations Report No. 2-2018-010 - Release of OI Synopsis RIS 2018-06, Clarification of the Requirements for Reactor Vessel Upper Head Bare Metal Visual Examinations2018-12-100Issue date: 10 December 2018 Title: Clarification of the Requirements for Reactor Vessel Upper Head Bare Metal Visual Examinations ML18318A3862018-11-190Issue date: 19 November 2018 Title: Third Extension Request for Nuclear Regulatory Commission Office of Investigations Report 3-2017-003 and Notice of Violation ML18312A0852018-11-080Issue date: 8 November 2018 Title: Final NRC Staff Slides for ACRS, Section 17.5 SE with No Open Items (Phase C), Clinch River Nuclear Site Early Site Permit Application ML18311A3872018-11-080Issue date: 8 November 2018 Title: Hti Acknowledgement of Disputed Notice of Nonconformance of Nuclear Regulatory Commission Inspection Report 99900345/2018-201 ML18306A6472018-11-020Issue date: 2 November 2018 Title: Draft NRC Staff Slides for ACRS, Section 17.5 SE with No Open Items (Phase C), Clinch River Nuclear Site Early Site Permit Application ML18302A2992018-11-010Issue date: 1 November 2018 Title: Full Metrics for FY2018 ML18302A2982018-11-010Issue date: 1 November 2018 Title: 2018 Annual Assessment of the Vendor Inspection Program Plan (Vipp) ML18302A1492018-10-290Issue date: 29 October 2018 Title: Nuclear Regulatory Commission Inspection of Applied Technical Services OI 3-2017-003, Second Extension Request for Nuclear Regulatory Commission Office of Investigations Report 3-2017-003 and Notice of Violation2018-10-160Issue date: 16 October 2018 Title: Second Extension Request for Nuclear Regulatory Commission Office of Investigations Report 3-2017-003 and Notice of Violation ML18152B7852018-10-120Issue date: 12 October 2018 Title: Summary of Nuclear Regulatory Commission Vendor Inspections Affecting Inspections, Tests, Analyses, and Acceptance Criteria ML18261A3752018-10-110Issue date: 11 October 2018 Title: Nuclear Regulatory Commission Vendor Inspection Report of Laboratory Testing, Inc., No 99902064/2018-201 RIS 2018-05, Supplier Oversight Issues Identified During Recent NRC Vendor Inspections2018-10-050Issue date: 5 October 2018 Title: Supplier Oversight Issues Identified During Recent NRC Vendor Inspections ML18270A1472018-10-010Issue date: 1 October 2018 Title: Vrg Update for CIP Public Meeting (October 1, 2018) ML18271A2162018-10-010Issue date: 1 October 2018 Title: Readiness Group (Vrg) Update (Presentation) ML18270A1502018-09-270Issue date: 27 September 2018 Title: Planned Interactions with Commission in Final Year Prior to Licensee Submitting All ITAAC Complete Notification (Presentation) ML18236A8692018-09-260Issue date: 26 September 2018 Title: Recommendations for Enhancing the Nuclear Regulatory Commission Cold Operator Licensing Process, Part B Information Notice 2018-11, Kobe Steel Quality Assurance Record Falsification2018-09-240Issue date: 24 September 2018 Title: Kobe Steel Quality Assurance Record Falsification ML18270A1522018-09-200Issue date: 20 September 2018 Title: Planned Interactions with Commission in Final Year Prior to Licensee Submitting All ITAAC Complete Notification (Handout) ML18261A1672018-09-180Issue date: 18 September 2018 Title: Nuclear Regulatory Commission Inspection of Transware Enterprises ML18260A0712018-09-170Issue date: 17 September 2018 Title: Extension Request for Nuclear Regulatory Commission Office of Investigations Report 3-2017-003 and Notice of Violation ML18257A2542018-09-170Issue date: 17 September 2018 Title: Gutor Electronic Llc'S Response to the Nuclear Regulatory Commission'S Inspection Report No. 99902060/2018-201 and Notice of Nonconformance ML18222A2812018-09-060Issue date: 6 September 2018 Title: IP 73758 Part 52, Functional Design and Qualification, Preservice and Inservice Testing Programs for Pumps, Valves and Dynamic Restraints ML18236A8702018-09-050Issue date: 5 September 2018 Title: Recommendations Colp Charter Part B Final ML18208A3112018-08-160Issue date: 16 August 2018 Title: Nuclear Regulatory Commission Office of Investigations Report 3-2017-003 and Notice of Violation (Letter) Information Notice 2018-09, Electrical Arc Flash Caused by Foreign Material Damages Fire Door2018-08-100Issue date: 10 August 2018 Title: Electrical Arc Flash Caused by Foreign Material Damages Fire Door OI 2-2017-017, U.S. NRC Office of Investigations Report 2-2017-017; and Exercise of Discretion2018-07-190Issue date: 19 July 2018 Title: U.S. NRC Office of Investigations Report 2-2017-017; and Exercise of Discretion ML18158A5132018-07-180Issue date: 18 July 2018 Title: Challenges in the Qualification of First of a Kind Components (July 18, 2018) Information Notice 2018-08, Failure to Enter the Required Technical Specifications Action Statement for Operation During Recent Surveillance Testing While Using a Reactor Protection System Test Box2018-06-130Issue date: 13 June 2018 Title: Failure to Enter the Required Technical Specifications Action Statement for Operation During Recent Surveillance Testing While Using a Reactor Protection System Test Box Information Notice 2018-07, Pump/Turbine Bearing Oil Sight Glass Problems2018-06-130Issue date: 13 June 2018 Title: Pump/Turbine Bearing Oil Sight Glass Problems ML18164A2462018-06-120Issue date: 12 June 2018 Title: Uncompleted ITAAC Notification Checklist (UINC) 841 for ITAAC 3.3.00.07d.iii.a (Index No. 803) for Vogtle Unit 3 ML18164A2452018-06-120Issue date: 12 June 2018 Title: Uncompleted ITAAC Notification Checklist (UINC) 1659 for ITAAC 3.3.00.07d.iii.a (Index No. 803) for Vogtle Unit 4 ML18164A2512018-06-070Issue date: 7 June 2018 Title: Uncompleted ITAAC Notification Checklist (UINC) 840 for ITAAC 3.3.00.07d.iii.b (Index No. 804) for Vogtle Unit 3 ML18164A2502018-06-070Issue date: 7 June 2018 Title: Uncompleted ITAAC Notification Checklist (UINC) 1661 for ITAAC 3.3.00.07d.iii.b (Index No. 804) for Vogtle Unit 4 ML18164A2492018-06-070Issue date: 7 June 2018 Title: Uncompleted ITAAC Notification Checklist (UINC) 843 for ITAAC 3.3.00.07d.iii.c (Index No. 805) for Vogtle Unit 3 ML18164A2482018-06-070Issue date: 7 June 2018 Title: Uncompleted ITAAC Notification Checklist (UINC) 1660 for ITAAC 3.3.00.07d.iii.c (Index No. 805) for Vogtle Unit 4 RIS 2018-03, National Terrorism Advisory System and Protective Measures for the Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material2018-06-010Issue date: 1 June 2018 Title: National Terrorism Advisory System and Protective Measures for the Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material RIS 2002-22, Clarification on Endorsement of Nuclear Energy Institute Guidance in Designing Digital Upgrades in I&C Systems2018-05-310Issue date: 31 May 2018 Title: Clarification on Endorsement of Nuclear Energy Institute Guidance in Designing Digital Upgrades in I&C Systems ML18143B6332018-05-310Issue date: 31 May 2018 Title: Clarification on Endorsement of Nuclear Energy Institute Guidance in Designing Digital Upgrades in I&C Systems ML18116A2682018-05-180Issue date: 18 May 2018 Title: Revised RIS 2002-22 Supp 1 (Clean) ML18099A1142018-05-160Issue date: 16 May 2018 Title: IMC 2507 Vendor Inspections OI 1-2015-020, Letter to J. Gresham, Westinghouse Electric Company, from P. Krohn, NRC, NRC Office of Investigations Report Nos. 1-2015-020 and 2-2016-001 - Release of OI Synopses2018-05-020Issue date: 2 May 2018 Title: Letter to J. Gresham, Westinghouse Electric Company, from P. Krohn, NRC, NRC Office of Investigations Report Nos. 1-2015-020 and 2-2016-001 - Release of OI Synopses OI 2-2017-011, Letter to E. Wills, Wectec Global Project Services Inc., from P. Krohn, NRC, NRC Office of Investigations Report No. 2-2017-011 - Release of OI Synopsis.2018-05-020Issue date: 2 May 2018 Title: Letter to E. Wills, Wectec Global Project Services Inc., from P. Krohn, NRC, NRC Office of Investigations Report No. 2-2017-011 - Release of OI Synopsis. OI 4-2017-026, Letter to D. Watkins, Tobolski Watkins Engineering Inc., from P. Krohn, NRC, NRC Office of Investigations Report No. 4-2017-026 - Release of OI Synopsis2018-05-020Issue date: 2 May 2018 Title: Letter to D. Watkins, Tobolski Watkins Engineering Inc., from P. Krohn, NRC, NRC Office of Investigations Report No. 4-2017-026 - Release of OI Synopsis ML18074A1242018-03-270Issue date: 27 March 2018 Title: Review Approach and Expectations for the NuScale Power LLC Initial Test Program ML18072A1352018-03-270Issue date: 27 March 2018 Title: Meeting Agenda - Vogtle 3 & 4 Initial Test Program (ITP) Activities - March 27, 2018 RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-03-260Issue date: 26 March 2018 Title: Preparation and Scheduling of Operator Licensing Examinations ML18078B2692018-03-220Issue date: 22 March 2018 Title: RIC 2018 Thank You Letter to Christer Viktorsson (Uae) ML18078B2572018-03-220Issue date: 22 March 2018 Title: RIC 2018 Thank You Letter to Rii (William B. Jones) ML18078B2152018-03-220Issue date: 22 March 2018 Title: RIC 2018 Thank You Letter to NNSA (Zhou Shirong) ML18078A4222018-03-220Issue date: 22 March 2018 Title: RIC 2018 Thank You Letter Southern Nuclear Operating Company (David Jones) ML18060A2982018-03-070Issue date: 7 March 2018 Title: Proposed Pilot Approach for the NuScale Power, LLC, Initial Test Program Review ML18051A0842018-03-010Issue date: 1 March 2018 Title: Clarification on Endorsement of Nuclear Energy Institute Guidance in Designing Digital Upgrades in Instrumentation and Control Systems Information Notice 2018-02, Testing and Operations-Induced Degradation of 3-Stage Target Rock Safety Relief Valves2018-02-260Issue date: 26 February 2018 Title: Testing and Operations-Induced Degradation of 3-Stage Target Rock Safety Relief Valves Information Notice 2018-03, Operating Experience Regarding Failure to Meet Technical Specifications Requirements for Changing Plant Conditions2018-02-260Issue date: 26 February 2018 Title: Operating Experience Regarding Failure to Meet Technical Specifications Requirements for Changing Plant Conditions Information Notice 2018-04, Operating Experience Regarding Failure of Operators to Trip the Plant When Experiencing Unstable Conditions2018-02-260Issue date: 26 February 2018 Title: Operating Experience Regarding Failure of Operators to Trip the Plant When Experiencing Unstable Conditions ML17228A4092018-02-220Issue date: 22 February 2018 Title: Draft NRC Regulatory Issue Summary 2018-XX, Clarification of the Requirements for Reactor Pressure Vessel Upper Head Bare Megal Visual Examinations Information Notice 2018-01, Noble Fission Gas Releases During Spent Fuel Cask Loading Operations2018-02-210Issue date: 21 February 2018 Title: Noble Fission Gas Releases During Spent Fuel Cask Loading Operations ML18018A5462018-01-300Issue date: 30 January 2018 Title: NRC and EPRI Joint Utility Task Group Procurement Form Held on January 30 - February 1, 2018, in Orlando, Florida ML18023B3722018-01-230Issue date: 23 January 2018 Title: NRC Draft Regulatory Issue Summary 2002-22, Suppl. 1, Clarification on Endorsement of Nuclear Energy Institute Guidance in Designing Digital Upgrades in I&C Systems, Provided for Jan 26, 2018, Public Meeting RIS 2018-01, Common Violations Cited During First 2 Years of 10 CFR Part 37, Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material, Implementation and Guidance Documents Available to Support2018-01-220Issue date: 22 January 2018 Title: Common Violations Cited During First 2 Years of 10 CFR Part 37, Physical Protection of Category 1 and Category 2 Quantities of Radioactive Material, Implementation and Guidance Documents Available to Support ML17268A2012017-12-220Issue date: 22 December 2017 Title: Memo: Status of Charters: Declaration of Plant-Referenced Simulator to Support Cold Licensing Process RIS 2017-08, Process for Scheduling and Allocating Resources for Fiscal Years 2020 Through 2022 for the Review of New Licensing A0plications for Light-Water Reactors and Non-Light Water Reactors2017-12-210Issue date: 21 December 2017 Title: Process for Scheduling and Allocating Resources for Fiscal Years 2020 Through 2022 for the Review of New Licensing A0plications for Light-Water Reactors and Non-Light Water Reactors Information Notice 2017-05, : Potential Binding of Schneider Electric/Square-D Masterpact Nt and Nw 480-Vac Circuit Breaker Anti-Pump Feature2017-12-130Issue date: 13 December 2017 Title:
Information Notice 2017-05, Potential Binding of Schneider Electric/Square-D Masterpact Nt and Nw 480-Vac Circuit Breaker Anti-Pump Feature2017-12-130Issue date: 13 December 2017 Title: Potential Binding of Schneider Electric/Square-D Masterpact Nt and Nw 480-Vac Circuit Breaker Anti-Pump Feature Information Notice 2017-05, Potential Binding of Schneider Electric/Square-D Masterpact NT and NW 480-VAC Circuit Breaker Anti-Pump Feature2017-12-130Issue date: 13 December 2017 Title: Potential Binding of Schneider Electric/Square-D Masterpact NT and NW 480-VAC Circuit Breaker Anti-Pump Feature ML17334A5572017-11-300Issue date: 30 November 2017 Title: RIC 2018 Mark Rauckhorst Speaker Invitation Letter Session Title: New Reactor Construction, Commissioning, and Transition to Operations ML17334A5092017-11-300Issue date: 30 November 2017 Title: RIC 2018 Mr. Liu Hua Speaker Invitation Letter Session Title New Reactor Construction, Commissioning, and Transition to Operations ML17334A4542017-11-300Issue date: 30 November 2017 Title: RIC 2018 Mr. Christer Viktorsson Speaker Invitation Letter Session Title New Reactor Construction, Commissioning, and Transition to Operations ML17261A3752017-09-290Issue date: 29 September 2017 Title: Memoranda: Inspections, Tests, Analyses, and Acceptance Criteria Demonstration Project Action Plan Information Notice 2017-06, Battery and Battery Charger Short Circuit Current Contributions to a Fault on the DC Distribution System2017-09-260Issue date: 26 September 2017 Title: Battery and Battery Charger Short Circuit Current Contributions to a Fault on the DC Distribution System Information Notice 2017-05, Potential Binding of Schneider Electric/Square-D Masterpact Nt and Nw 480-VAC Circuit Breaker Anti-Pump Feature2017-09-010Issue date: 1 September 2017 Title: Potential Binding of Schneider Electric/Square-D Masterpact Nt and Nw 480-VAC Circuit Breaker Anti-Pump Feature RIS 2017-04, Clarification on the Implementation of Compensatory Measures for Protective Strategy Deficiencies or Degraded or Inoperable Security Systems, Equipment, or Components2017-08-300Issue date: 30 August 2017 Title: Clarification on the Implementation of Compensatory Measures for Protective Strategy Deficiencies or Degraded or Inoperable Security Systems, Equipment, or Components Information Notice 2017-04, High Energy Arc Faults in Electrical Equipment Containing Aluminum Components2017-08-210Issue date: 21 August 2017 Title: High Energy Arc Faults in Electrical Equipment Containing Aluminum Components Information Notice 2017-03, Anchor/Darling Double Disc Gate Valve Wedge Pin and Stem-Disc Separation Failures2017-06-150Issue date: 15 June 2017 Title: Anchor/Darling Double Disc Gate Valve Wedge Pin and Stem-Disc Separation Failures Information Notice 2017-01, Reactor Coolant System Leakage from a Control Rod Drive Threaded Connection2017-05-030Issue date: 3 May 2017 Title: Reactor Coolant System Leakage from a Control Rod Drive Threaded Connection RIS 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-04-050Issue date: 5 April 2017 Title: Preparation and Scheduling of Operator Licensing Examinations ML17088A6572017-03-280Issue date: 28 March 2017 Title: 2017 RIC Presentation from Yamir Diaz-Castillo Entitled, Current NRC Vendor Findings and the Results from the 1st SONGS Lessons Learned Inspection RIS 2017-01, Human Reliability and Human Performance Database2017-02-020Issue date: 2 February 2017 Title: Human Reliability and Human Performance Database RIS 2016-12, NRC Employee Access to Switchyards at Licensee Facilities2016-11-220Issue date: 22 November 2016 Title: NRC Employee Access to Switchyards at Licensee Facilities RIS 2016-10, License Amendment Requests for Changes to Emergency Response Organization Staffing and Augmentation2016-08-050Issue date: 5 August 2016 Title: License Amendment Requests for Changes to Emergency Response Organization Staffing and Augmentation ML16187A3792016-07-070Issue date: 7 July 2016 Title: Appreciation for John Simmons Support of the NRC Vendor Oversight Workshop ML16125A3262016-07-070Issue date: 7 July 2016 Title: Results of the U.S. Nuclear Regulatory Commission Staff Review of NEI 08-02 Corrective Action Processes for New Nuclear Power Plants During Construction, Draft Revision 4 Information Notice 2016-07, Operating Experience Regarding Impacts on Site Electrical Power Distribution from Inadequate Oversight of Contractor Activities2016-06-200Issue date: 20 June 2016 Title: Operating Experience Regarding Impacts on Site Electrical Power Distribution from Inadequate Oversight of Contractor Activities Information Notice 2016-07, Operating Experience Regarding Impacts on Site Electrical Power Distribution From Inadequate Oversight of Contractor Activities2016-06-200Issue date: 20 June 2016 Title: Operating Experience Regarding Impacts on Site Electrical Power Distribution From Inadequate Oversight of Contractor Activities Information Notice 2016-08, Inadequate Work Practices Resulting in Faulted Circuit Breaker Connection2016-06-170Issue date: 17 June 2016 Title: Inadequate Work Practices Resulting in Faulted Circuit Breaker Connection RIS 2016-09, Withdrawn - NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations2016-06-160Issue date: 16 June 2016 Title: Withdrawn - NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations RIS 2016-08, Process for Scheduling and Allocating Resources in Fiscal Year 2019 for the Review of New Licensing Applications for Light-Water Reactors and Non-Light-Water Reactors2016-06-070Issue date: 7 June 2016 Title: Process for Scheduling and Allocating Resources in Fiscal Year 2019 for the Review of New Licensing Applications for Light-Water Reactors and Non-Light-Water Reactors RIS 2016-07, Containment Shell or Liner Moisture Barrier Inspection2016-05-090Issue date: 9 May 2016 Title: Containment Shell or Liner Moisture Barrier Inspection RIS 2016-05, Embedded Digital Devices in Safety-Related Systems2016-04-290Issue date: 29 April 2016 Title: Embedded Digital Devices in Safety-Related Systems RIS 2016-04, Clarification of 10 CFR 50.46 Reporting Requirements and Recent Issues Identified with Guidance Not Approved for Use2016-04-190Issue date: 19 April 2016 Title: Clarification of 10 CFR 50.46 Reporting Requirements and Recent Issues Identified with Guidance Not Approved for Use ML16104A3202016-04-140Issue date: 14 April 2016 Title: Invitation to Participate in the 5th Nuclear Regulatory Commission Workshop on Vendor Oversight - Nichol RIS 2016-03, 10 CFR 50.59 Issues Identified in NRCs San Onofre Steam Generator Tube Degradation Lessons Learned Report2016-04-130Issue date: 13 April 2016 Title: 10 CFR 50.59 Issues Identified in NRCs San Onofre Steam Generator Tube Degradation Lessons Learned Report RIS 2016-02, Design Basis Issues Related to Tube-To-TubeSheet Joints in Pressurized-Water Reactor Steam Generators2016-03-230Issue date: 23 March 2016 Title: Design Basis Issues Related to Tube-To-TubeSheet Joints in Pressurized-Water Reactor Steam Generators RIS 2016-01, Guidance for the Use of Accreditation in Lieu of Commercial Grade Surveys for Procurement of Laboratory Calibration and Test Services2016-03-160Issue date: 16 March 2016 Title: Guidance for the Use of Accreditation in Lieu of Commercial Grade Surveys for Procurement of Laboratory Calibration and Test Services Information Notice 2016-01, Recent Issues Related to the Commercial Grade Dedication of Allen Bradley 700-RTC Relays2016-02-170Issue date: 17 February 2016 Title: Recent Issues Related to the Commercial Grade Dedication of Allen Bradley 700-RTC Relays RIS 2015-17, Review and Submission of Updates to Final Safety Analysis Reports, Emergency Preparedness Documents, and Fire Protection Documents2015-12-230Issue date: 23 December 2015 Title: Review and Submission of Updates to Final Safety Analysis Reports, Emergency Preparedness Documents, and Fire Protection Documents RIS 2015-11, Protective Action Recommendations for Members of the Public on Bodies of Water2015-11-050Issue date: 5 November 2015 Title: Protective Action Recommendations for Members of the Public on Bodies of Water ML15306A4502015-11-030Issue date: 3 November 2015 Title: Summary of Public Meeting to Discuss NEI 14-09 Guidelines for Implementation of 10 CFR Part 21 Reporting of Defects and Noncompliance Information Notice 2015-09, Mechanical Dynamic Restraint (Snubber) Lubricant Degradation Not Identified Due to Insufficient Service Life Monitoring2015-09-240Issue date: 24 September 2015 Title: Mechanical Dynamic Restraint (Snubber) Lubricant Degradation Not Identified Due to Insufficient Service Life Monitoring ML15205A1692015-08-070Issue date: 7 August 2015 Title: ACRS Review of the Davis Besse Nuclear Plant LRA - Transmittal of the Sser Information Notice 2015-07, Temporary Suspension of e-QIP System to Affect Pending Background Investigations2015-07-150Issue date: 15 July 2015 Title: Temporary Suspension of e-QIP System to Affect Pending Background Investigations Information Notice 2015-06, ISOO Notice 2015-02: Message from OPM to Security Clearance Holders2015-06-180Issue date: 18 June 2015 Title: ISOO Notice 2015-02: Message from OPM to Security Clearance Holders RIS 2015-06, Tornado Missile Protection2015-06-100Issue date: 10 June 2015 Title: Tornado Missile Protection ML15106A4842015-06-050Issue date: 5 June 2015 Title: Rev. 2, Revision to NRC Inspection Manual Part 9900 Technical Guidance, Operability Determinations & Functionality Assessments for Resolution of Degraded or Nonconforming Conditions Adverse to Quality or Safety RIS 2005-20, Rev. 2, Revision to NRC Inspection Manual Part 9900 Technical Guidance, Operability Determinations & Functionality Assessments for Resolution of Degraded Or Nonconforming Conditions Adverse To Quality or Safety2015-06-050Issue date: 5 June 2015 Title: Rev. 2, Revision to NRC Inspection Manual Part 9900 Technical Guidance, Operability Determinations & Functionality Assessments for Resolution of Degraded Or Nonconforming Conditions Adverse To Quality or Safety Information Notice 2015-05, Inoperability of Auxiliary and Emergency Feedwater Auto Start Circuits on Loss of Main Feedwater Pumps2015-05-120Issue date: 12 May 2015 Title: Inoperability of Auxiliary and Emergency Feedwater Auto Start Circuits on Loss of Main Feedwater Pumps Information Notice 2015-05, Inoperability Of Auxiliary And Emergency Feedwater Auto Start Circuits On Loss Of Main Feedwater Pumps2015-05-120Issue date: 12 May 2015 Title: Inoperability Of Auxiliary And Emergency Feedwater Auto Start Circuits On Loss Of Main Feedwater Pumps RIS 2015-07, Withdrawn NRC Regulatory Issue Summary 2015-07, Process for Scheduling and Allocating Resources in FY2017 for the Review of New Licensing Applications for Large Light Water Reactors and Small Modular Reactors2015-05-110Issue date: 11 May 2015 Title: Withdrawn NRC Regulatory Issue Summary 2015-07, Process for Scheduling and Allocating Resources in FY2017 for the Review of New Licensing Applications for Large Light Water Reactors and Small Modular Reactors RIS 2015-05, Withdrawn NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations2015-04-200Issue date: 20 April 2015 Title: Withdrawn NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations Information Notice 2013-13, Rev.1, Deficiencies with Effluent Radiation Monitoring System Instrumentation2015-04-150Issue date: 15 April 2015 Title: Rev.1, Deficiencies with Effluent Radiation Monitoring System Instrumentation Information Notice 2013-13, Rev.1, Deficiencies With Effluent Radiation Monitoring System Instrumentation2015-04-150Issue date: 15 April 2015 Title: Rev.1, Deficiencies With Effluent Radiation Monitoring System Instrumentation RIS 2015-04, Withdrawal of Administrative Letter 93-012015-04-140Issue date: 14 April 2015 Title: Withdrawal of Administrative Letter 93-01 RIS 2015-03, Identifying and Reporting Security Incidents Under 10 CFR Part 372015-02-240Issue date: 24 February 2015 Title: Identifying and Reporting Security Incidents Under 10 CFR Part 37 ML14272A2172015-02-180Issue date: 18 February 2015 Title: Reporting of H-3, C-14, Tc-99, and I-129 on the Uniform Waste Manifest RIS 2015-02, Reporting of H-3, C-14, Tc-99, and I-129 on the Uniform Waste Manifest2015-02-180Issue date: 18 February 2015 Title: Reporting of H-3, C-14, Tc-99, and I-129 on the Uniform Waste Manifest RIS 2015-01, Qualification Requirements for Bolt and Stud Non-Destructive Examinations2015-01-290Issue date: 29 January 2015 Title: Qualification Requirements for Bolt and Stud Non-Destructive Examinations RIS 2015-01, Qualification Requirements for Bolt and Stud Non-Destructive Examinations (TAC Mf4148)2015-01-290Issue date: 29 January 2015 Title: Qualification Requirements for Bolt and Stud Non-Destructive Examinations (TAC Mf4148) Information Notice 2015-01, Degraded Ability to Mitigate Flooding Events2015-01-090Issue date: 9 January 2015 Title: Degraded Ability to Mitigate Flooding Events Information Notice 2014-15, Inadequate Controls of Respiratory Protection Accessibility, Training, and Maintenance2014-12-010Issue date: 1 December 2014 Title: Inadequate Controls of Respiratory Protection Accessibility, Training, and Maintenance Information Notice 2014-12, Crane and Heavy Lift Issues Identified During NRC Inspections2014-11-140Issue date: 14 November 2014 Title: Crane and Heavy Lift Issues Identified During NRC Inspections RIS 2014-11, Information on Licensing Applications for Fracture Toughness Requirements for Ferritic Reactor Coolant Pressure Boundary Components2014-10-140Issue date: 14 October 2014 Title: Information on Licensing Applications for Fracture Toughness Requirements for Ferritic Reactor Coolant Pressure Boundary Components Information Notice 2014-11, Recent Issues Related to the Qualification of Safety-Related Components2014-09-190Issue date: 19 September 2014 Title: Recent Issues Related to the Qualification of Safety-Related Components Information Notice 2014-10, Unfused DC Ammeter Circuits and Potential for Fire Events2014-09-160Issue date: 16 September 2014 Title: Unfused DC Ammeter Circuits and Potential for Fire Events RIS 2014-09, Maintaining the Effectiveness of License Renewal Aging Management2014-08-060Issue date: 6 August 2014 Title: Maintaining the Effectiveness of License Renewal Aging Management ML14192A9252014-07-310Issue date: 31 July 2014 Title: Endorsement Letter of NEI 08-01 Information Notice 2014-09, Spent Fuel Storage or Transportation System Mis-loading2014-06-200Issue date: 20 June 2014 Title: Spent Fuel Storage or Transportation System Mis-loading Information Notice 2014-07, Degradation of Leak-Chase Channel Systems for Floor Welds of Metal Containment Shell and Concrete Containment Metallic Liner2014-05-050Issue date: 5 May 2014 Title: Degradation of Leak-Chase Channel Systems for Floor Welds of Metal Containment Shell and Concrete Containment Metallic Liner RIS 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request2014-05-050Issue date: 5 May 2014 Title: Enhancements to the Vendor Inspection Program - Vendor Information Request RIS 2014-05, Withdrawn NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations2014-04-290Issue date: 29 April 2014 Title: Withdrawn NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations RIS 2014-02, Withdrawal of NRC Generic Letter 95-08, 10 CFR 50.54(p) Process for Changes to Security Plans Without Prior NRC Approval2014-04-160Issue date: 16 April 2014 Title: Withdrawal of NRC Generic Letter 95-08, 10 CFR 50.54(p) Process for Changes to Security Plans Without Prior NRC Approval Information Notice 2014-04, Potential for Teflon Material Degradation in Containment Penetrations, Mechanical Seals and Other Equipment2014-03-260Issue date: 26 March 2014 Title: Potential for Teflon Material Degradation in Containment Penetrations, Mechanical Seals and Other Equipment RIS 2014-03, Withdrawn - NRC Regulatory Issue Summary 2014-03, Notice of 10 CFR Part 37 Implementation Deadline for NRC Licensees2014-03-130Issue date: 13 March 2014 Title: Withdrawn - NRC Regulatory Issue Summary 2014-03, Notice of 10 CFR Part 37 Implementation Deadline for NRC Licensees Information Notice 2014-02, Failure to Properly Pressure Test Reactor Vessel Flange Leak-Off Lines2014-02-250Issue date: 25 February 2014 Title: Failure to Properly Pressure Test Reactor Vessel Flange Leak-Off Lines Information Notice 2014-03, Turbine-Driven Auxiliary Feedwater Pump Overspeed Trip Mechanism Issues2014-02-250Issue date: 25 February 2014 Title: Turbine-Driven Auxiliary Feedwater Pump Overspeed Trip Mechanism Issues Information Notice 2014-01, Fuel Safety Limit Calculations Inputs Were Inconsistent with NRC-Approved Fuel Design2014-02-210Issue date: 21 February 2014 Title: Fuel Safety Limit Calculations Inputs Were Inconsistent with NRC-Approved Fuel Design ML13094A4212014-02-200Issue date: 20 February 2014 Title: NRC Regulatory Issue Summary 2014-XX, Tornado Missile Protection ML14056A4672014-02-120Issue date: 12 February 2014 Title: NEI 08-01 Revision 5 Comments RIS 2013-19, Removal of Safeguards Information Designation from Attachment to Order EA-02-261, Order for Compensatory Measures Related to Access Authorization2013-12-130Issue date: 13 December 2013 Title: Removal of Safeguards Information Designation from Attachment to Order EA-02-261, Order for Compensatory Measures Related to Access Authorization Information Notice 2013-21, Welding Problems During Fabrication of Reactor Plant Components2013-11-210Issue date: 21 November 2013 Title: Welding Problems During Fabrication of Reactor Plant Components Information Notice 2013-21, Welding Problems during Fabrication of Reactor Plant Components2013-11-210Issue date: 21 November 2013 Title: Welding Problems during Fabrication of Reactor Plant Components RIS 2013-17, Resuming Normal Interactions Between the NRC and NRC Stakeholders Following an Agency Shutdown2013-10-170Issue date: 17 October 2013 Title: Resuming Normal Interactions Between the NRC and NRC Stakeholders Following an Agency Shutdown RIS 2013-16, Withdrawn - NRC Regulatory Issue Summary 2013-16, Interactions Between The NRC And NRC Stakeholders During a Lapse Of Agency Appropriations2013-10-010Issue date: 1 October 2013, 9 October 2013 Title: Withdrawn - NRC Regulatory Issue Summary 2013-16, Interactions Between The NRC And NRC Stakeholders During a Lapse Of Agency Appropriations, Withdrawn - NRC Regulatory Issue Summary 2013-16, Supplement 1, Interactions Between the NRC and NRC Stakeholders During a Lapse of Agency Appropriations Information Notice 2013-20, Steam Generator Channel Head and Tubesheet Degradation2013-10-030Issue date: 3 October 2013 Title: Steam Generator Channel Head and Tubesheet Degradation RIS 2013-09, NRC Endorsement of NEI 09-10, Revision 1a-A, Guidelines for Effective Prevention and Management of System Gas Accumulation2013-08-230Issue date: 23 August 2013 Title: NRC Endorsement of NEI 09-10, Revision 1a-A, Guidelines for Effective Prevention and Management of System Gas Accumulation Information Notice 2013-14, Potential Design Deficiency in Motor-Operated Valve Control Circuitry2013-08-230Issue date: 23 August 2013 Title: Potential Design Deficiency in Motor-Operated Valve Control Circuitry Information Notice 2013-14, Potential Design Deficiency In Motor-Operated Valve Control Circuitry2013-08-230Issue date: 23 August 2013 Title: Potential Design Deficiency In Motor-Operated Valve Control Circuitry Information Notice 2013-15, Willful Misconduct / Record Falsification and Nuclear Safety Culture2013-08-230Issue date: 23 August 2013 Title: Willful Misconduct / Record Falsification and Nuclear Safety Culture RIS 2013-09, NRC Endorsement of NEI 09-10, Revision 1a-A, Guidelines For Effective Prevention and Management of System Gas Accumulation2013-08-230Issue date: 23 August 2013 Title: NRC Endorsement of NEI 09-10, Revision 1a-A, Guidelines For Effective Prevention and Management of System Gas Accumulation Information Notice 2013-12, Improperly Sloped Instrument Sensing Lines2013-07-030Issue date: 3 July 2013 Title: Improperly Sloped Instrument Sensing Lines Information Notice 2013-11, Crack-like Indications at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes2013-07-030Issue date: 3 July 2013 Title: Crack-like Indications at Dents/Dings and in the Freespan Region of Thermally Treated Alloy 600 Steam Generator Tubes Information Notice 2013-10, Programs for Monitoring Boiling-Water Reactor Steam Dryer Integrity2013-06-140Issue date: 14 June 2013 Title: Programs for Monitoring Boiling-Water Reactor Steam Dryer Integrity Information Notice 2013-09, Compressed Flammable Gas Cylinders and Hazards2013-06-030Issue date: 3 June 2013 Title: Compressed Flammable Gas Cylinders and Hazards RIS 2013-07, NRC Staff Position on the Use of American Society of Mechanical Engineers Certification Mark2013-05-280Issue date: 28 May 2013 Title: NRC Staff Position on the Use of American Society of Mechanical Engineers Certification Mark RIS 2013-05, NRC Position in the Relationship Between General Design Criteria and Technical Specification Operability2013-05-090Issue date: 9 May 2013 Title: NRC Position in the Relationship Between General Design Criteria and Technical Specification Operability Information Notice 2013-06, Issues with Air and Water Interaction in Fire Protection Sprinkler Systems2013-03-250Issue date: 25 March 2013 Title: Issues with Air and Water Interaction in Fire Protection Sprinkler Systems Information Notice 2013-06, Issues With Air and Water Interaction in Fire Protection Sprinkler Systems2013-03-250Issue date: 25 March 2013 Title: Issues With Air and Water Interaction in Fire Protection Sprinkler Systems Information Notice 2013-02, Issues Potentially Affecting Nuclear Facility Fire Safety2013-03-190Issue date: 19 March 2013 Title: Issues Potentially Affecting Nuclear Facility Fire Safety Information Notice 2013-05, Battery Expected Life and Its Potential Impact on Surveillance Requirements2013-03-190Issue date: 19 March 2013 Title: Battery Expected Life and Its Potential Impact on Surveillance Requirements RIS 2005-01, Rev 1, Changes To Notice Of Enforcement Discretion Process And Staff Guidance2013-03-130Issue date: 13 March 2013 Title: Rev 1, Changes To Notice Of Enforcement Discretion Process And Staff Guidance Information Notice 2013-04, Concrete Subsurface Laminar Cracking Caused by Moisture Intrusion and Freezing2013-03-070Issue date: 7 March 2013 Title: Concrete Subsurface Laminar Cracking Caused by Moisture Intrusion and Freezing Information Notice 2013-04, Concrete Subsurface Laminar Cracking Caused By Moisture Intrusion and Freezing2013-03-070Issue date: 7 March 2013 Title: Concrete Subsurface Laminar Cracking Caused By Moisture Intrusion and Freezing Information Notice 2013-03, Recent Issue with the Definition of Core Quadrant2013-03-050Issue date: 5 March 2013 Title: Recent Issue with the Definition of Core Quadrant Information Notice 2013-03, Recent Issue With the Definition of Core Quadrant2013-03-050Issue date: 5 March 2013 Title: Recent Issue With the Definition of Core Quadrant Information Notice 2012-25, Performance Issues with Seismic Instrumentation and Associated Systems for Operating Reactors2013-02-010Issue date: 1 February 2013 Title: Performance Issues with Seismic Instrumentation and Associated Systems for Operating Reactors Information Notice 2012-22, Counterfeit, Fraudulent, Suspect Item Training Offerings2013-01-250Issue date: 25 January 2013 Title: Counterfeit, Fraudulent, Suspect Item Training Offerings RIS 2012-12, Withdrawn NRC Regulatory Issue Summary 2012-12, Licensing Submittal Information and Design Development Activities for Small Modular Reactor Designs2012-12-280Issue date: 28 December 2012 Title: Withdrawn NRC Regulatory Issue Summary 2012-12, Licensing Submittal Information and Design Development Activities for Small Modular Reactor Designs Information Notice 2012-21, Reactor Vessel Closure Head Studs Remain Detensioned During Plant Startup2012-12-100Issue date: 10 December 2012 Title: Reactor Vessel Closure Head Studs Remain Detensioned During Plant Startup Information Notice 2012-18, Failure to Properly Augment Emergency Response Organizations2012-10-260Issue date: 26 October 2012 Title: Failure to Properly Augment Emergency Response Organizations RIS 2012-11, NRC Staff Position on Applying Boiling Water Reactor Technical Specification Requirements During Operations with a Potential for Draining the Reactor Vessel2012-09-260Issue date: 26 September 2012 Title: NRC Staff Position on Applying Boiling Water Reactor Technical Specification Requirements During Operations with a Potential for Draining the Reactor Vessel RIS 2012-11, NRC Staff Position on Applying Boiling Water Reactor Technical Specification Requirements During Operations With a Potential For Draining the Reactor Vessel2012-09-260Issue date: 26 September 2012 Title: NRC Staff Position on Applying Boiling Water Reactor Technical Specification Requirements During Operations With a Potential For Draining the Reactor Vessel Information Notice 2012-17, Certified Material Test Reports and Age Hardened Concrete Compressive Strength2012-09-060Issue date: 6 September 2012 Title: Certified Material Test Reports and Age Hardened Concrete Compressive Strength Information Notice 2012-16, Preconditioning of Pressure Switches Before Surveillance Testing2012-08-290Issue date: 29 August 2012 Title: Preconditioning of Pressure Switches Before Surveillance Testing RIS 2012-10, NRC Staff Position on Applying Surveillance Requirements (SR) SR 3.0.2 and 3.0.3 to Administrative Controls Program Tests2012-08-230Issue date: 23 August 2012 Title: NRC Staff Position on Applying Surveillance Requirements (SR) SR 3.0.2 and 3.0.3 to Administrative Controls Program Tests Information Notice 2012-13, Boraflex Degradation Surveillance Programs and Corrective Actions in the Spent Fuel Pool2012-08-100Issue date: 10 August 2012 Title: Boraflex Degradation Surveillance Programs and Corrective Actions in the Spent Fuel Pool Information Notice 2012-13, Boraflex Degradation Surveillance Programs And Corrective Actions In The Spent Fuel Pool2012-08-100Issue date: 10 August 2012 Title: Boraflex Degradation Surveillance Programs And Corrective Actions In The Spent Fuel Pool RIS 2012-09, Endorsement of Nuclear Energy Institute Guidance Using an Alternative Method to Manage Cumulative Fatigue at Nuclear Power Reactor Sites2012-08-070Issue date: 7 August 2012 Title: Endorsement of Nuclear Energy Institute Guidance Using an Alternative Method to Manage Cumulative Fatigue at Nuclear Power Reactor Sites RIS 2012-09, Endorsement of Nuclear Energy Institute Guidance Using An Alternative Method to Manage Cumulative Fatigue At Nuclear Power Reactor Sites2012-08-070Issue date: 7 August 2012 Title: Endorsement of Nuclear Energy Institute Guidance Using An Alternative Method to Manage Cumulative Fatigue At Nuclear Power Reactor Sites ML13039A4532012-07-270Issue date: 27 July 2012 Title: Official Exhibit - NYS000468-00-BD01 - NRC Bulletin 2012-01: Design Vulnerability in Electric Power System ML12341A2902012-07-270Issue date: 27 July 2012 Title: New York State (NYS) Pre-Filed Evidentiary Hearing Exhibit NYS000468, NRC Bulletin 2012-01: Design Vulnerability in Electric Power System Information Notice 2012-14, Motor-Operated Valve Inoperable Due to Stem-Disc Separation2012-07-240Issue date: 24 July 2012 Title: Motor-Operated Valve Inoperable Due to Stem-Disc Separation Information Notice 2012-14, Motor-Operated Valve Inoperable Due To Stem-Disc Separation2012-07-240Issue date: 24 July 2012 Title: Motor-Operated Valve Inoperable Due To Stem-Disc Separation Information Notice 2012-12, HVAC Design Control Issues Challenge Safety System Function2012-07-240Issue date: 24 July 2012 Title: HVAC Design Control Issues Challenge Safety System Function ML12137A3462012-07-240Issue date: 24 July 2012 Title: NRC Regulatory Issue Summary 2012 NRC Staff Position on Applicability of GDC Requirement for External Events in Operability Determinations Information Notice 2012-11, Age Related Capacitor Degradation2012-07-230Issue date: 23 July 2012 Title: Age Related Capacitor Degradation Information Notice 2012-09, Irradiation Effects on Fuel Assembly Spacer Grid Crush Strength2012-06-280Issue date: 28 June 2012 Title: Irradiation Effects on Fuel Assembly Spacer Grid Crush Strength RIS 2012-07, Withdrawn NRC Regulatory Issue Summary 2012-07 Preparation and Scheduling of Operator Licensing Examinations2012-06-080Issue date: 8 June 2012 Title: Withdrawn NRC Regulatory Issue Summary 2012-07 Preparation and Scheduling of Operator Licensing Examinations Information Notice 2012-06, Ineffective Use of Vendor Technical Recommendations2012-04-240Issue date: 24 April 2012 Title: Ineffective Use of Vendor Technical Recommendations ML1130505372012-04-200Issue date: 20 April 2012 Title: Use of 10 CFR 72.212 Evaluations to Accept Conditions Outside of the FSAR Analysis ML1131803802012-03-310Issue date: 31 March 2012 Title: Draft Regulatory Analysis for DG-1268, Proposed Revision 1 of RG-1.68.3, Preoperational Testing of Instrument and Control Air Systems Information Notice 2012-03, Design Vulnerability in Electric Power System2012-03-010Issue date: 1 March 2012 Title: Design Vulnerability in Electric Power System Information Notice 2012-03, Design Vulnerability In Electric Power System2012-03-010Issue date: 1 March 2012 Title: Design Vulnerability In Electric Power System IR 05000244/20110052012-01-260Issue date: 26 January 2012 Title: IR 05000244-11-005, on 10/01/2011 - 12/31/2011, R.E. Ginna Nuclear Power Plant Maintenance Risk Assessments and Emergent Work Control, and Operability Determinations and Functionality Assessments Information Notice 2012-01, Seismic Considerations--Principally Issues Involving Tanks2012-01-260Issue date: 26 January 2012 Title: Seismic Considerations--Principally Issues Involving Tanks RIS 2012-01, Availability of Safety Culture Policy Statement2012-01-170Issue date: 17 January 2012 Title: Availability of Safety Culture Policy Statement RIS 2011-13, Follow Up to Generic Letter 96-05 for Evaluation of Class D Valves Under Joint Owners Group Motor-Operated Valve Periodic Verification Program2012-01-060Issue date: 6 January 2012 Title: Follow Up to Generic Letter 96-05 for Evaluation of Class D Valves Under Joint Owners Group Motor-Operated Valve Periodic Verification Program ML1130505832011-12-290Issue date: 29 December 2011 Title: Adequacy of Station Electric Distribution System Voltages RIS 2011-14, Metal Fatigue Analysis Performed by Computer Software2011-12-290Issue date: 29 December 2011 Title: Metal Fatigue Analysis Performed by Computer Software RIS 2011-14, Metal Fatigue Analysis Performed By Computer Software2011-12-290Issue date: 29 December 2011 Title: Metal Fatigue Analysis Performed By Computer Software ML12339A6842011-12-290Issue date: 29 December 2011 Title: Official Exhibit - NRC000112-00-BD01 - NRC Regulatory Issue 2011-14 Metal Fatigue Analysis Performed by Computer Software ML12091A0582011-12-290Issue date: 29 December 2011 Title: NRC Pre-Filed Evidentiary Hearing Exhibit NRC000112 - NRC Regulatory Issue 2011-14 Metal Fatigue Analysis Performed by Computer Software Information Notice 2011-21, Realistic Emergency Core Cooling System Evaluation Model Effects Resulting from Nuclear Fuel Thermal Conductivity Degradation2011-12-130Issue date: 13 December 2011 Title: Realistic Emergency Core Cooling System Evaluation Model Effects Resulting from Nuclear Fuel Thermal Conductivity Degradation Information Notice 2011-21, Realistic Emergency Core Cooling System Evaluation Model Effects Resulting From Nuclear Fuel Thermal Conductivity Degradation2011-12-130Issue date: 13 December 2011 Title: Realistic Emergency Core Cooling System Evaluation Model Effects Resulting From Nuclear Fuel Thermal Conductivity Degradation Information Notice 2011-20, Concrete Degradation by Alkali-Silica Reaction2011-11-180Issue date: 18 November 2011 Title: Concrete Degradation by Alkali-Silica Reaction ML1127104052011-10-040Issue date: 4 October 2011 Title: Industry Proposal to Expand the NRCs Current Acceptance of Third Party Accreditation of Domestic Calibration Laboratories for Purposes of Commercial Grade Dedication Information Notice 2011-19, Licensee Event Reports Containing Information Pertaining to Defects to Basic Components2011-09-260Issue date: 26 September 2011 Title: Licensee Event Reports Containing Information Pertaining to Defects to Basic Components Information Notice 2011-17, Calculation Methodologies for Operability Determinations of Gas Voids in Nuclear Power Plant Piping2011-07-260Issue date: 26 July 2011 Title: Calculation Methodologies for Operability Determinations of Gas Voids in Nuclear Power Plant Piping Information Notice 2011-14, Component Cooling Water System Gas Accumulation and Other Performance Issues2011-07-180Issue date: 18 July 2011 Title: Component Cooling Water System Gas Accumulation and Other Performance Issues ML1101104802011-05-310Issue date: 31 May 2011 Title: Draft Regulatory Guide DG-1253, (Proposed Revision 2 of Regulatory Guide 1.79, Dated September 1975), Preoperational Testing of Emergency Core Cooling Systems for Pressurized-Water Reactors RIS 2011-04, Withdrawn NRC Regulatory Issue Summary 2011-004 Preparation and Scheduling of Operator Licensing Examinations2011-05-250Issue date: 25 May 2011 Title: Withdrawn NRC Regulatory Issue Summary 2011-004 Preparation and Scheduling of Operator Licensing Examinations ML1108003782011-03-220Issue date: 22 March 2011 Title: Appreciation Letter to Nuclear Energy Institute for Participating NRC 23rd Annual Regulatory Information Conference 03/8-10, 2011 Information Notice 2011-05, Tohoku-Taiheiyou-Oki Earthquake Effects on Japanese Nuclear Power Plants2011-03-180Issue date: 18 March 2011 Title: Tohoku-Taiheiyou-Oki Earthquake Effects on Japanese Nuclear Power Plants Information Notice 2011-04, IN: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors2011-02-230Issue date: 23 February 2011 Title: IN: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors Information Notice 2011-04, In: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors2011-02-230Issue date: 23 February 2011 Title: In: Contaminants and Stagnant Conditions Affecting Stress Corrosion Cracking in Stainless Steel Piping in Pressurized Water Reactors ML12335A5172011-02-230Issue date: 23 February 2011 Title: Official Exhibit - RIV000038-00-BD01 - NRC in 2011-04 ML11356A3982011-02-230Issue date: 23 February 2011 Title: Riverkeeper (Riv) Pre-Filed Evidentiary Hearing Exhibit RIV000038, NRC in 2011-04 Information Notice 2011-01, Commercial Grade Dedication Issues Identified During NRC Inspections2011-02-150Issue date: 15 February 2011 Title: Commercial Grade Dedication Issues Identified During NRC Inspections Information Notice 2010-27, Ventilation System Preventive Maintenance and Design Issues2010-12-160Issue date: 16 December 2010 Title: Ventilation System Preventive Maintenance and Design Issues RIS 2008-05, Updated NRC Regulatory Issue Summary 2008-05, Revision 1: Lessons Learned to Improve Inspections, Tests, Analyses, and Acceptance Criteria Submittal2010-09-230Issue date: 23 September 2010 Title: Updated NRC Regulatory Issue Summary 2008-05, Revision 1: Lessons Learned to Improve Inspections, Tests, Analyses, and Acceptance Criteria Submittal ML1014501922010-07-200Issue date: 20 July 2010 Title: Draft Regulatory Issue Summary 2008-05, Revision 1: Lessons Learned to Improve Inspections, Tests, Analyses, and Acceptance Criteria Submittal Information Notice 2010-12, Containment Liner Corrosion2010-06-180Issue date: 18 June 2010 Title: Containment Liner Corrosion Information Notice 2010-11, Potential for Steam Voiding Causing Residual Heat Removal System Inoperability2010-06-160Issue date: 16 June 2010 Title: Potential for Steam Voiding Causing Residual Heat Removal System Inoperability Information Notice 2010-10, Implementation of a Digital Control System Under 10 CFR 50.592010-05-280Issue date: 28 May 2010 Title: Implementation of a Digital Control System Under 10 CFR 50.59 ML1007404852010-04-210Issue date: 21 April 2010 Title: NRC Staff Review of NEI 08-02 Rev 3 Information Notice 2010-09, Importance of Understanding Circuit Breaker Control Power Indications2010-04-140Issue date: 14 April 2010 Title: Importance of Understanding Circuit Breaker Control Power Indications Information Notice 2010-08, Welding and Nondestructive Examination Issues2010-04-090Issue date: 9 April 2010 Title: Welding and Nondestructive Examination Issues Information Notice 2010-01, Pipe Support Anchors Installed Improperly2010-03-010Issue date: 1 March 2010 Title: Pipe Support Anchors Installed Improperly Information Notice 2010-04, Diesel Generator Voltage Regulation System Component Due to Latent Manufacturing Defect2010-02-260Issue date: 26 February 2010 Title: Diesel Generator Voltage Regulation System Component Due to Latent Manufacturing Defect Information Notice 2010-04, Diesel Generator Voltage Regulation System Component Due To Latent Manufacturing Defect2010-02-260Issue date: 26 February 2010 Title: Diesel Generator Voltage Regulation System Component Due To Latent Manufacturing Defect RIS 2010-01, Withdrawn NRC Regulatory Issue Summary 2010-01 - Process for Scheduling Acceptance Reviews of New Reactor Licensing Applications for Fy 20122010-02-030Issue date: 3 February 2010 Title: Withdrawn NRC Regulatory Issue Summary 2010-01 - Process for Scheduling Acceptance Reviews of New Reactor Licensing Applications for Fy 2012 Information Notice 2009-19, Hostile Action-Based Emergency Preparedness Drills2009-11-240Issue date: 24 November 2009 Title: Hostile Action-Based Emergency Preparedness Drills Information Notice 2009-29, Potential Failure of Fire Water Supply Pumps to Automatically Start Due to a Fire2009-11-240Issue date: 24 November 2009 Title: Potential Failure of Fire Water Supply Pumps to Automatically Start Due to a Fire Information Notice 2009-27, Revised International Nuclear and Radiological Event Scale Users Manual2009-11-130Issue date: 13 November 2009 Title: Revised International Nuclear and Radiological Event Scale Users Manual Information Notice 2009-27, Revised International Nuclear And Radiological Event Scale User's Manual2009-11-130Issue date: 13 November 2009 Title: Revised International Nuclear And Radiological Event Scale User's Manual Information Notice 2009-27, Revised International Nuclear And Radiological Event Scale User'S Manual2009-11-130Issue date: 13 November 2009 Title: Revised International Nuclear And Radiological Event Scale User'S Manual Information Notice 2009-25, Firing Range Safety Issues2009-11-100Issue date: 10 November 2009 Title: Firing Range Safety Issues Information Notice 2009-23, Nuclear Fuel Thermal Conductivity Degradation2009-10-080Issue date: 8 October 2009 Title: Nuclear Fuel Thermal Conductivity Degradation RIS 2009-13, Emergency Response Data System Upgrade from Modem to Virtual Private Network Appliance2009-09-280Issue date: 28 September 2009 Title: Emergency Response Data System Upgrade from Modem to Virtual Private Network Appliance Information Notice 2009-16, Spurious Relay Actuations Result in Loss of Power to Safeguards Busses2009-09-150Issue date: 15 September 2009 Title: Spurious Relay Actuations Result in Loss of Power to Safeguards Busses RIS 2009-11, Withdrawn NRC Regulatory Issue Summary 2009-11: Preparation and Scheduling of Operator Licensing Examinations2009-07-160Issue date: 16 July 2009 Title: Withdrawn NRC Regulatory Issue Summary 2009-11: Preparation and Scheduling of Operator Licensing Examinations Information Notice 2008-04, Counterfeit Parts Supplied to Nuclear Power Plants2008-04-070Issue date: 7 April 2008 Title: Counterfeit Parts Supplied to Nuclear Power Plants Information Notice 2008-04, Recent Counterfeit Valves and Circuit Breakers Supplied to Nuclear Power Plants2008-04-070Issue date: 7 April 2008 Title: Recent Counterfeit Valves and Circuit Breakers Supplied to Nuclear Power Plants Information Notice 2007-40, Inadequate Implementation of 10 CFR Part 21 Requirements by Vendors Who Supply Basic Components to Nuclear Power Plant Licensees2007-12-210Issue date: 21 December 2007 Title: Inadequate Implementation of 10 CFR Part 21 Requirements by Vendors Who Supply Basic Components to Nuclear Power Plant Licensees ML0714901842007-05-220Issue date: 22 May 2007 Title: Prep Material for May 31, 2007 Public Meeting ML0712200502007-05-020Issue date: 2 May 2007 Title: Construction Inspection Program Comments from the Nuclear Energy Institute on Inspection Manual Chapters 2503 and 2504 (Project Number 689) ML0708602142007-04-110Issue date: 11 April 2007 Title: Letter of Appreciation to M. C. Kray, R. Bell, & D. Lochbaum for Presentation and the Outstanding Support Provided to the Construction Inspection Program (CIP) Breakout Session During the 2007 U.S. NRC Regulatory Information Conference Information Notice 2007-04, Construction Experience Related to the Assurance of Quality in the Construction of Nuclear Power Plants2007-02-050Issue date: 5 February 2007 Title: Construction Experience Related to the Assurance of Quality in the Construction of Nuclear Power Plants 2019-03-19 |
| [to] | MONTHYEARML19015A2912019-01-280Issue date: 28 January 2019 Title: Construction Reactor Oversight Process Performance Metric Report for Calendar Year 2018 ML18302A2982018-11-010Issue date: 1 November 2018 Title: 2018 Annual Assessment of the Vendor Inspection Program Plan (Vipp) ML18302A2992018-11-010Issue date: 1 November 2018 Title: Full Metrics for FY2018 ML18260A0792018-10-300Issue date: 30 October 2018 Title: Trip Report - NRC Observation of NUPIC Audit at Framatome in Richland, Wa ML18289A4482018-10-120Issue date: 12 October 2018 Title: NRC Office of Investigations Report 3-2017-003 and Notice of Violation (E-mail) ML18262A1802018-09-200Issue date: 20 September 2018 Title: Trip Report by the Nuclear Regulatory Commission Staff of the EPRI Joint Utility Task Group August 2018 ML18184A5102018-07-130Issue date: 13 July 2018 Title: ITAAC Prioritization Memo Attachment a ML18184A5082018-07-130Issue date: 13 July 2018 Title: ITAAC Prioritization Memo Attachment B ML18184A5112018-07-130Issue date: 13 July 2018 Title: ITAAC Prioritization Memo LAR 1-123 and LAR 1-122 ML18178A5682018-06-290Issue date: 29 June 2018 Title: Office of New Reactors Phase Discipline Memorandum ML18150A3712018-06-140Issue date: 14 June 2018 Title: Control of Items Under 10CFR50, Appendix B with, and Without, Commercial Grade Item Dedication (Marc Tannenbaum and John Simmons) ML18078B0602018-04-050Issue date: 5 April 2018 Title: Trip Report by the Nuclear Regulatory Commission Staff of the NUPIC Joint Utility Team Audit at Joseph Oat Corporation ML18059A2732018-03-120Issue date: 12 March 2018 Title: Charter for Instituting the Vogtle Readiness Group to Oversee the Vogtle Units 3 and 4 Transition to Operations ML17354B2882018-01-100Issue date: 10 January 2018 Title: Summary of Category 1 Public Meeting with Southern Nuclear Operating Company for the U.S. Nuclear Regulatory Commission Inspections, Tests, Analyses, and Acceptance Criteria ITAAC Tabletop ML17347B6852017-12-200Issue date: 20 December 2017 Title: Vendor Inspection Program Annual Self-Assessment Report for Fiscal Year 2017 ML17251A2852017-09-250Issue date: 25 September 2017 Title: Inspections, Test, Analyses and Acceptance Criteria Demonstration Project Update RIS 2017-01, Human Reliability and Human Performance Database2017-02-020Issue date: 2 February 2017 Title: Human Reliability and Human Performance Database ML19031C8512016-08-190Issue date: 19 August 2016 Title: MFN-16-059 - Peak Cladding Temperature of GE Hitachi Nuclear Energy Advanced Boiling Water Reactor Design Certification Rule Renewal Application ML14232A5372014-08-210Issue date: 21 August 2014 Title: 8-21-14 CIP Mtg Slides - FFD and ITAAC NLS2014061, Response to NRC Regulatory Issue Summary 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request2014-06-190Issue date: 19 June 2014 Title: Response to NRC Regulatory Issue Summary 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request ML14189A4982014-06-190Issue date: 19 June 2014 Title: Stars Response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2014-07, Enhancements to the Vendor Inspection Program - Vendor Information Request AEP-NRC-2014-50, Response to Regulatory Issue Summary 2014-07 Enhancements to the Vendor Inspection Program - Vendor Information Request2014-06-170Issue date: 17 June 2014 Title: Response to Regulatory Issue Summary 2014-07 Enhancements to the Vendor Inspection Program - Vendor Information Request ML14128A2672014-05-220Issue date: 22 May 2014 Title: Charter for the Review of the Vendor Oversight Program in Response to the Part 52 and San Onofre Steam Generator Tube Degradation Event Lesson Learned ML14057A4202014-02-270Issue date: 27 February 2014 Title: Public Meeting 2/27/2014 VCS Construction Update ML12223A3422011-01-130Issue date: 13 January 2011 Title: Email to: Robert Prato, (Nro/Dcip), Cc: Charles Tinkler, (Res/Dsa), Casey Wagner, (Kcw@Dycoda.Com), Kyle Wayne Ross, (Kwross@.Sandia.Gov), Richard Chang, (Res/Dsa), from: Jason Schaperow, (Res/Dsa), Subject: I Am in ACRS Tomorrow Morning, ML1016806592010-06-160Issue date: 16 June 2010 Title: 6/16/10 Construction Reactor Oversight Process Category 2 Public Meeting Handout: Baseline Risk Values for Wolf Creek ML11255A2882008-05-270Issue date: 27 May 2008 Title: Email from R. Guzman, NRR/DORL/LPL1-1 to R. Prato, Nro/Dcip/Cqva, Subject: PM Sequoyah ML0731901622008-02-270Issue date: 27 February 2008 Title: Lessons Learned to Improve Inspections, Tests, Analyses, and Acceptance Criteria Submittal ML0727706622006-12-080Issue date: 8 December 2006 Title: September 2007 Evidentiary Hearing - Applicant Exhibit 3, Letter from Michael P. Gallagher to the NRC Enclosing Amergens Submittal of Information to the ACRS License Renewal Subcommittee on the Drywell Corrosion Issue History 2019-01-28 |