DCL-03-129, September 2003 Monthly Operating Report for Diablo Canyon Units 1 & 2

From kanterella
(Redirected from DCL-03-129)
Jump to navigation Jump to search
September 2003 Monthly Operating Report for Diablo Canyon Units 1 & 2
ML032940613
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/15/2003
From: Becker J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-03-129, GL-97-002
Download: ML032940613 (6)


Text

N Pacific Gas and Electric Company James R.Becker Diablo Canyon Power Plant Vice President -Diablo Canyon P.O.Box 56 Operations and Station Director Avila Beach, CA 93424 October 15, 2003 805.545.3462 Fax: 805.545.4234 PG&E Letter DCL-03-129 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Monthly Operating Report for September 2003

Dear Commissioners and Staff:

Attached is the Monthly Operating Report for Diablo Canyon Power Plant, Units 1 and 2, for September 2003. This report is submitted in accordance with Technical Specification 5.6.4 and NRC Generic Letter 97-02.

Sincerely, James . Becker smg/1 713/R0250567 Enclosures cc/enc: Paul R. Fox, American Nuclear Insurers Robert D. Glynn, Jr.

Bruce S. Mallett, NRC Regional Administrator, Region IV David L. Proulx, NRC Senior Resident Inspector Gregory M. Rueger Girija S. Shukla, NRC Project Manager INPO Record Center A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Catlaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek I3 e7zL

- a Enclosure 1 PG&E Letter DCL-03-129 SEPTEMBER 2003, OPERATION SUMMARIES DIABLO CANYON POWER PLANT UNITS I AND 2 Summary of Unit 1 Operation Unit 1 remained in Mode 1 (Power Operation), at approximately 100 percent power during September 2003. There were no significant operational activities.

Summary of Unit 2 Operation On September 27, 2003, operators reduced power to approximately 83 percent for main turbine valve testing. At the conclusion of the testing, operators completed the ramp to approximately 100 percent power by late that night. With the exception of this planned power reduction, Unit 2 remained in Mode 1, at approximately 100 percent power during September 2003.

Actuations of Pressurizer Safety or Power Operated Relief Valves There were no challenges to the pressurizer power operated relief valves, pressurizer safety valves, or steam generator safety valves.

I Enclosure 2 PG&E Letter DCL-03-129 OPERATING DATA REPORT DOCKET NO.: 50-275 UNIT NAME: Diablo Canyon Unit 1 DATE: 10/01/2003 COMPLETED BY: S. Guess TELEPHONE: (805) 545-4692 REPORT MONTH: September 2003 I 1. I Design Electrical Rating (Mwe - Net): l 1,103 l l 2. Maximum Dependable Capacity (Mwe - Net): l 1,087 l This Month YTD Cumulative

3. Number of Hours Reactor Critical: 720.0 6,551.0 140,777.8
4. Number of Hours Generator On-Line: 720.0 6,551.0 139,260.6
5. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
6. Net Electrical Energy Generated (MWH): 794,860 7,187,540 144,393,839 1

Enclosure 2 PG&E Letter DCL-03-129 UNIT SHUTDOWNS DOCKET I IO.: 50-275 UNIT NAME: Diablo Canyon Unit 1 DATE: 10/01/2003 COMPLETED BY: S. Guess TELEPHONE: (805) 545-4692 REPORT MONTH: September 2003 NO. DATE TYPE DURATION REASON' METHOD CAUSE & CORRECTIVE (YYMMDD) F (Forcd) (HOURS) OFACONS S(Scedued) SHUTTING DW2

  • COMMENTS N/A There were no shutdowns this month.
1. Reason 2. Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training/License Examination 5-Other F- Administrative G-Operational Error (Explain)

H-Other (Explain) 2

Enclosure 2 PG&E Letter DCL-03-129 OPERATING DATA REPORT DOCKET NO.: 50-323 UNIT NAME: Diablo Canyon Unit 2 DATE: 10/01/2003 COMPLETED BY: S. Guess TELEPHONE: (805) 545-4692 REPORT MONTH: September 2003 I 1. I Design Electrical Rating (MWe - Net): I 1119 l 2. Maximum Dependable Capacity (MWe - Net): l 1087 This Month YTD Cumulative

3. Number of Hours Reactor Critical: 720.0 5,082.4 136,440.9
4. Number of Hours Generator On-Line: j 720.0 5,017.2 134,905.1
5. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
6. Net Electrical Energy Generated MWH): 790,678 5,334,417 142,026,407 3

Enclosure 2 PG&E Letter DCL-03-129 UNIT SHUTDOWNS DOCKET NO.: 50-323 UNIT NAME: Diablo Canyon Unit 2 DATE: 10/01/2003 COMPLETED BY: S. Guess TELEPHONE: (805) 545-4692 REPORT MONTH: September 2003 NO. DATE TYPE F(Forced)

DURATION (OR)O REASON' METHOD CAUSE &CINCORRECTIVE (YYMMDD)(HUS.OACIN S (Scheduled) SHUTTING 2 (MDeDOWN COMMENTS N/A There were no shutdowns this month.

1. Reason 2. Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training/License Examination 5-Other F- Administrative G-Operational Error (Explain)