|
---|
Category:Letter type:DCL
MONTHYEARDCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System DCL-23-092, Material Status Report for the Period Ending August 31, 20232023-09-28028 September 2023 Material Status Report for the Period Ending August 31, 2023 DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-27027 September 2023 License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors DCL-23-083, Upcoming Meeting with Nuclear Security and Incident Response Staff2023-09-13013 September 2023 Upcoming Meeting with Nuclear Security and Incident Response Staff DCL-23-078, Nuclear Material Transaction Report for New Fuel2023-09-0606 September 2023 Nuclear Material Transaction Report for New Fuel DCL-23-070, Withdrawal of Request Regarding Senior Reactor Operator License Application2023-08-16016 August 2023 Withdrawal of Request Regarding Senior Reactor Operator License Application DCL-23-068, Nuclear Material Transaction Report for New Fuel2023-08-0909 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-066, Nuclear Material Transaction Report for New Fuel2023-08-0303 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-065, Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure2023-07-27027 July 2023 Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure DCL-23-064, Nuclear Material Transaction Report for New Fuel2023-07-26026 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-054, License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-07-13013 July 2023 License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-055, Nuclear Material Transaction Report for New Fuel2023-07-0606 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-042, Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 02023-05-24024 May 2023 Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 0 DCL-23-032, Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program2023-05-22022 May 2023 Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program DCL-23-041, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20222023-05-22022 May 2023 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2022 DCL-23-038, Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule2023-05-15015 May 2023 Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule DCL-23-034, 2022 Annual Nonradiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Nonradiological Environmental Operating Report DCL-23-036, 2022 Annual Radiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Radiological Environmental Operating Report DCL-23-025, 2022 Annual Radioactive Effluent Release Report2023-05-0101 May 2023 2022 Annual Radioactive Effluent Release Report DCL-2023-512, Submittal of Receiving Water Monitoring Program 2022 Annual Report2023-04-27027 April 2023 Submittal of Receiving Water Monitoring Program 2022 Annual Report DCL-23-035, Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application2023-04-24024 April 2023 Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application DCL-23-028, Technical Specification Bases, Revision 142023-04-24024 April 2023 Technical Specification Bases, Revision 14 DCL-2023-511, Report on Discharge Monitoring for the First Quarter of 20232023-04-20020 April 2023 Report on Discharge Monitoring for the First Quarter of 2023 DCL-23-031, Submittal of Annual Report of Occupational Radiation Exposure for 20222023-04-19019 April 2023 Submittal of Annual Report of Occupational Radiation Exposure for 2022 DCL-23-024, Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System2023-04-0404 April 2023 Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System DCL-23-022, 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant2023-03-29029 March 2023 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant DCL-23-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22023-03-28028 March 2023 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-23-021, Independent Spent Fuel Storage Installation, Emergency Plan Update2023-03-23023 March 2023 Independent Spent Fuel Storage Installation, Emergency Plan Update DCL-23-020, Responses to NRC Questions Regarding License Renewal Efforts2023-03-17017 March 2023 Responses to NRC Questions Regarding License Renewal Efforts DCL-23-009, Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage2023-02-22022 February 2023 Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage DCL-23-008, Request Regarding Senior Reactor Operator License Application2023-02-22022 February 2023 Request Regarding Senior Reactor Operator License Application DCL-2023-503, Annual Sea Turtle Report2023-01-26026 January 2023 Annual Sea Turtle Report DCL-2023-502, (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring2023-01-18018 January 2023 (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring DCL-22-091, Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage2022-12-20020 December 2022 Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage DCL-22-089, Core Operating Limits Report for Unit 2 Cycle 242022-12-20020 December 2022 Core Operating Limits Report for Unit 2 Cycle 24 DCL-22-085, Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application2022-10-31031 October 2022 Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application DCL-22-041, Site-Specific Decommissioning Cost Estimate, Revision 12022-10-12012 October 2022 Site-Specific Decommissioning Cost Estimate, Revision 1 DCL-22-042, Post-Shutdown Decommissioning Activities Report, Revision 12022-10-12012 October 2022 Post-Shutdown Decommissioning Activities Report, Revision 1 2024-01-29
[Table view] Category:License-Monthly Operating Report
MONTHYEARDCL-05-040, March 2005 Monthly Operating Report for Diablo Canyon Units 1 and 22005-04-14014 April 2005 March 2005 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-05-021, February 2005 Monthly Operating Report for Diablo Canyon Units 1 and 22005-03-11011 March 2005 February 2005 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-05-010, January 2005 Monthly Operating Report for Diablo Canyon, Units 1 and 22005-02-11011 February 2005 January 2005 Monthly Operating Report for Diablo Canyon, Units 1 and 2 ML0502501392005-01-14014 January 2005 December 2004 Monthly Operating Report for Diablo Canyon, Units 1 and 2 DCL-04-171, November 2004 Monthly Operating Report for Diablo Canyon Units 1 and 22004-12-14014 December 2004 November 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-04-155, October 2004 Monthly Operating Report for Diablo Canyon Units 1 and 22004-11-12012 November 2004 October 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-04-132, September 2004 Monthly Operating Report for Diablo Canyon Units 1 and 22004-10-15015 October 2004 September 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-04-115, August 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 and Corrected June and July Data Sheets2004-09-15015 September 2004 August 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 and Corrected June and July Data Sheets DCL-04-103, July 2004 Monthly Operating Report for Diablo Canyon Units 1 and 22004-08-16016 August 2004 July 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-04-087, June 2004 Monthly Operating Report for Diablo Canyon Units 1 and 22004-07-15015 July 2004 June 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-04-060, April 2004 Monthly Operating Report for Diablo Canyon Units 1 and 22004-05-14014 May 2004 April 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-04-044, March 2004 Monthly Operating Report for Diablo Canyon Units 1 and 22004-04-15015 April 2004 March 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-04-027, February 2004 Monthly Operating Report for Diablo Canyon, Units 1 and 22004-03-12012 March 2004 February 2004 Monthly Operating Report for Diablo Canyon, Units 1 and 2 DCL-04-015, January 2004 Monthy Operating Report for Diablo Canyon, Units 1 and 22004-02-13013 February 2004 January 2004 Monthy Operating Report for Diablo Canyon, Units 1 and 2 DCL-04-003, December 2003 Monthly Operating Report for Diablo Canyon2004-01-15015 January 2004 December 2003 Monthly Operating Report for Diablo Canyon DCL-03-170, November 2003 Monthly Operating Report for Diablo Canyon Units 1 and 22003-12-12012 December 2003 November 2003 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-03-148, October 2003 Monthly Operating Report for Diablo Canyon, Units 1 & 22003-11-12012 November 2003 October 2003 Monthly Operating Report for Diablo Canyon, Units 1 & 2 DCL-03-129, September 2003 Monthly Operating Report for Diablo Canyon Units 1 & 22003-10-15015 October 2003 September 2003 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-03-099, July 2003 Monthly Operating Report for Diablo Canyon, Units 1 & 22003-08-15015 August 2003 July 2003 Monthly Operating Report for Diablo Canyon, Units 1 & 2 DCL-03-083, June 2003 Monthly Operating Report for Diablo Canyon Power Plant, Units 1 and 22003-07-15015 July 2003 June 2003 Monthly Operating Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-03-068, May 2003 Monthly Operating Report for Diablo Canyon Units 1 & 22003-06-13013 June 2003 May 2003 Monthly Operating Report for Diablo Canyon Units 1 & 2 ML0314303512003-05-15015 May 2003 April 2003 Monthly Operating Report for Diablo Canyon Power Plant Units 1 & 2 DCL-03-038, March 2003 Monthly Operating Report for Diablo Canyon Units 1 & 22003-04-15015 April 2003 March 2003 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-03-032, February 2003 Monthly Operating Report for Diablo Canyon, Units 1 & 22003-03-14014 March 2003 February 2003 Monthly Operating Report for Diablo Canyon, Units 1 & 2 DCL-03-015, January 2003 Monthly Operating Report for Diablo Canyon Units 1 & 22003-02-14014 February 2003 January 2003 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-03-001, December 2002 Monthly Operating Report for Diablo Canyon Units 1 & 22003-01-15015 January 2003 December 2002 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-02-143, November 2002 Monthly Operating Report for Diablo Canyon Power Plant, Units 1 & 22002-12-13013 December 2002 November 2002 Monthly Operating Report for Diablo Canyon Power Plant, Units 1 & 2 DCL-02-131, October 2002 Monthly Operating Report for Diablo Canyon Units 1 & 22002-11-15015 November 2002 October 2002 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-02-121, September 2002 Monthly Operating Report for Diablo Canyon Units 1 & 22002-10-14014 October 2002 September 2002 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-02-111, August 2002 Monthly Operating Report for Diablo Canyon Units 1 & 22002-09-13013 September 2002 August 2002 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-02-094, July 2002 Monthly Operating Report for Diablo Canyon. Corrected June 2002 Monthly Operating Report for Unit 1, Enclosed2002-08-15015 August 2002 July 2002 Monthly Operating Report for Diablo Canyon. Corrected June 2002 Monthly Operating Report for Unit 1, Enclosed DCL-02-076, June 2002 Monthly Operating Report for Diablo Canyon Power Plant Units 1 and 22002-07-12012 July 2002 June 2002 Monthly Operating Report for Diablo Canyon Power Plant Units 1 and 2 DCL-02-058, April 2002 Monthly Operating Report for Diablo Canyon Units 1 & 22002-05-10010 May 2002 April 2002 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-02-040, March 2002 Monthly Operating Report for Diablo Canyon Units 1 & 22002-04-15015 April 2002 March 2002 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-02-026, February 2002 Monthly Operating Report for Diablo Canyon, Units 1 and 22002-03-15015 March 2002 February 2002 Monthly Operating Report for Diablo Canyon, Units 1 and 2 DCL-02-016, January 2002 Monthly Operating Report for Diablo Canyon Power Plant, Units 1 & 22002-02-15015 February 2002 January 2002 Monthly Operating Report for Diablo Canyon Power Plant, Units 1 & 2 DCL-02-003, December 2001 Monthly Operating Report for Diablo Canyon Units 1 & 22002-01-15015 January 2002 December 2001 Monthly Operating Report for Diablo Canyon Units 1 & 2 2005-04-14
[Table view] |
Text
Pacific Gasand ElectricCompany James R.Becker Diablo Canyon Power Plant Vice President-Diablo Canyon PO. Box 56 Operations and Station Director Avila Beach, CA 93424 February 13, 2004 805.545.3462 Fax: 805.545.4234 PG&E Letter DCL-04-015 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Monthlv Operatinq Report for Januarv 2004
Dear Commissioners and Staff:
Enclosed is the Monthly Operating Report for Diablo Canyon Power Plant, Units 1 and 2, for January 2004. This report is submitted in accordance with Technical Specification 5.6.4 and NRC Generic Letter 97-02.
Sincer Iy, James R.
smg/1 713/R0254858 Enclosures cc/enc: Paul R. Fox, American Nuclear Insurers Robert D. Glynn, Jr.
Bruce S. Mallett, NRC Regional Administrator, Region IV David L. Proulx, NRC Senior Resident Inspector Gregory M. Rueger Girija S. Shukla, NRC Project Manager INPO Record Center A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
Enclosure 1 PG&E Letter DCL-04-015 JANUARY 2004, OPERATION SUMMARIES DIABLO CANYON POWER PLANT UNITS I AND 2 Summary of Unit I Operation Unit 1 began the month in Mode I (Power Operation) at approximately 100 percent power. On January 15, 2004, operators commenced a planned ramp to approximately 50 percent power to inspect the condenser for saltwater in-leakage. After the condenser tube inspections were completed, operators commenced ramping to full power and reached approximately 100 percent power on January 18, 2004. Unit 1 remained at approximately 100 percent for the remainder of the month.
Summary of Unit 2 Operation Unit 2 remained in Mode 1, at approximately 100 percent power, during January 2004.
There were no significant operational activities.
Actuations of Pressurizer Safety or Power-Operated Relief Valves There were no challenges to the pressurizer power-operated relief valves, pressurizer safety valves, or steam generator safety valves.
Enclosure 2 PG&E Letter DCL-04-015 OPERATING DATA REPORT DOCKET NO.: 50-275 UNIT NAME: Diablo Canyon Unit 1 DATE: 2/03/2004 COMPLETED BY: S. Guess TELEPHONE: (805) 545-4692 REPORT MONTH: January 2004 I 1. I Design Electrical Rating (Mwe - Net): I 1,103
- 2. Maximum Dependable Capacity (Mwe - Net): 1,087 This Month YTD Cumulative
- 3. Number of Hours Reactor Critical: 744.0 744.0 143,730.8
- 4. Number of Hours Generator On-Line: 744.0 744.0 142,213.6
- 5. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
- 6. Net Electrical Energy Generated (MWH): 791,429 791,429 147,583,159 1
Enclosure 2 PG&E Letter DCL-04-015 UNIT SHUTDOWNS DOCKET NO.: 50-275 UNIT NAME: Diablo Canyon Unit 1 DATE: 2/03/2004 COMPLETED BY: S. Guess TELEPHONE: (805) 545-4692 REPORT MONTH: January 2004 NO. DATE TYPE DURATION REASON' METHOD CAUSE & CORRECTIVE (YM)F (Forced) (HOURS) OF ACTIONS L S (Scheduled) SHUTTING COMMENTS DOWN 2 CMET lN/AThere were no shutdowns this month.
- 1. Reason 2. Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training/License Examination 5-Other F-Administrative G-Operational Error (Explain)
H-Other (Explain) 2
Enclosure 2 PG&E Letter DCL-04-015 OPERATING DATA REPORT DOCKET NO.: 50-323 UNIT NAME: Diablo Canyon Unit 2 DATE: 2/03/2004 COMPLETED BY: S. Guess TELEPHONE: (805) 545-4692 REPORT MONTH: January 2004 I 1. I Design Electrical Rating (MWe - Net): I 1119 I
- 2. Maximum Dependable Capacity (MWe - Net): 1087 This Month I YTD Cumulative
- 3. Number of Hours Reactor Critical: 744.0 744.0 139,393.9
- 4. Number of Hours Generator On-Line: 744.0 744.0 137,858.1
- 5. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
- 6. Net Electrical Energy Generated (MWH): 812,031 812,031 145,229,248 3
Enclosure 2 PG&E Letter DCL-04-015 UNIT SHUTDOWNS DOCKET NO.: 50-323 UNIT NAME: Diablo Canyon Unit 2 DATE: 2/03/2004 COMPLETED BY: S. Guess TELEPHONE: (805) 545-4692 REPORT MONTH: January 2004 NO. DATE TYPE DURATION REASON' METHOD CAUSE & CORRECTIVE (YM )F (Forced) (HOURS) OF ACTIONS S(Scheduled)
S(YYMMDD) = SHUTTING COMMENTS N/AThere were no shutdowns this month.
- 1. Reason 2. Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training/License Examination 5-Other F-Administrative G-Operational Error (Explain)
H-Other (Explain) 4
TRACKING MEMO (Remove prior to NRC submittal)
Document: PG&E Letter DCL 04-015 Version: 2/03/2004
Subject:
Monthly Operating Report for January 2004 File Location: S:\RS\RA\MOR\DCLO401 5.doc FSAR Update Review zing the guidance in X13.1D2, does the FSAR Update need to be revised? Yes El No Z
- If "Yes", submit an FSAR Update Change Request in accordance with X13.1D2 (or if this is an LAR, process in accordance with WG-9)
Commitment #1 None A0479867 identifies incorrect outage data in previous submittals due to the definition used by "GENSTATS" not matching NRC's definition of Net Generation. Although the correction for prior years has not been submitted to the NRC, starting in 1999, "negative net generation" (power used during outages) is excluded; so the data submitted matches NRC's definition. However, unless GENSTATS is corrected, submitted data will diverge from GENSTATS.
The method is described in Draft Work Guideline 8. Additional errors were introduced during I R10 and 2R1 0; reference A0521936, and A0535381.
- InNovember 2001, a new database was created to replace GENSTATS. The new database corrected previous years' data. The new database islocated in httn://wwwnoq/businfo/Qenstats/aen detail monthlv.xls, and the daily shutdown hours are at htto://wwwnoa/businfo/aenstats/aen detail dailv 2003.xis The differences between the reported data and the databases since 1999 are:
Unit Month/Year Correction Correction in Correction in in Month Year (MWH) Lifetime (MWH)
(MWH) 1 Total 1999 N/A 17,246 17,246 1 Total 2000 N/A 29,420 46,666 1 Total 2001* N/A 964 -2,660* = 44,970 1 Total 2002 N/A 28,008 72,978 2 Total 1999 N/A 10,544 10,544 2 Total 2000 N/A 6,746 17,290 2 Total 2001* NIA + 1,720 = 9,997 +1,944* = 27,511 2 Total 2002 N/A 1,052 28,563 2 Feb 2003 2,210 2,210 30,773 2 Mar2003 14,675 16,885 45,448 2 Apr2003 8,734 25,619 54,182 NRC Performance Indicators described in this report:
Unit Hours Rx Scrams Unplanned Critical Unplanned W/O Heat Power Sink Changes 1 yes none None none 2 1yes none None none