MONTHYEARDCL-05-040, March 2005 Monthly Operating Report for Diablo Canyon Units 1 and 22005-04-14014 April 2005 March 2005 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-05-021, February 2005 Monthly Operating Report for Diablo Canyon Units 1 and 22005-03-11011 March 2005 February 2005 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-05-010, January 2005 Monthly Operating Report for Diablo Canyon, Units 1 and 22005-02-11011 February 2005 January 2005 Monthly Operating Report for Diablo Canyon, Units 1 and 2 ML0502501392005-01-14014 January 2005 December 2004 Monthly Operating Report for Diablo Canyon, Units 1 and 2 DCL-04-171, November 2004 Monthly Operating Report for Diablo Canyon Units 1 and 22004-12-14014 December 2004 November 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-04-155, October 2004 Monthly Operating Report for Diablo Canyon Units 1 and 22004-11-12012 November 2004 October 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-04-132, September 2004 Monthly Operating Report for Diablo Canyon Units 1 and 22004-10-15015 October 2004 September 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-04-115, August 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 and Corrected June and July Data Sheets2004-09-15015 September 2004 August 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 and Corrected June and July Data Sheets DCL-04-103, July 2004 Monthly Operating Report for Diablo Canyon Units 1 and 22004-08-16016 August 2004 July 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-04-087, June 2004 Monthly Operating Report for Diablo Canyon Units 1 and 22004-07-15015 July 2004 June 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-04-060, April 2004 Monthly Operating Report for Diablo Canyon Units 1 and 22004-05-14014 May 2004 April 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-04-044, March 2004 Monthly Operating Report for Diablo Canyon Units 1 and 22004-04-15015 April 2004 March 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-04-027, February 2004 Monthly Operating Report for Diablo Canyon, Units 1 and 22004-03-12012 March 2004 February 2004 Monthly Operating Report for Diablo Canyon, Units 1 and 2 DCL-04-015, January 2004 Monthy Operating Report for Diablo Canyon, Units 1 and 22004-02-13013 February 2004 January 2004 Monthy Operating Report for Diablo Canyon, Units 1 and 2 DCL-04-003, December 2003 Monthly Operating Report for Diablo Canyon2004-01-15015 January 2004 December 2003 Monthly Operating Report for Diablo Canyon DCL-03-170, November 2003 Monthly Operating Report for Diablo Canyon Units 1 and 22003-12-12012 December 2003 November 2003 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-03-148, October 2003 Monthly Operating Report for Diablo Canyon, Units 1 & 22003-11-12012 November 2003 October 2003 Monthly Operating Report for Diablo Canyon, Units 1 & 2 DCL-03-129, September 2003 Monthly Operating Report for Diablo Canyon Units 1 & 22003-10-15015 October 2003 September 2003 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-03-099, July 2003 Monthly Operating Report for Diablo Canyon, Units 1 & 22003-08-15015 August 2003 July 2003 Monthly Operating Report for Diablo Canyon, Units 1 & 2 DCL-03-083, June 2003 Monthly Operating Report for Diablo Canyon Power Plant, Units 1 and 22003-07-15015 July 2003 June 2003 Monthly Operating Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-03-068, May 2003 Monthly Operating Report for Diablo Canyon Units 1 & 22003-06-13013 June 2003 May 2003 Monthly Operating Report for Diablo Canyon Units 1 & 2 ML0314303512003-05-15015 May 2003 April 2003 Monthly Operating Report for Diablo Canyon Power Plant Units 1 & 2 DCL-03-038, March 2003 Monthly Operating Report for Diablo Canyon Units 1 & 22003-04-15015 April 2003 March 2003 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-03-032, February 2003 Monthly Operating Report for Diablo Canyon, Units 1 & 22003-03-14014 March 2003 February 2003 Monthly Operating Report for Diablo Canyon, Units 1 & 2 DCL-03-015, January 2003 Monthly Operating Report for Diablo Canyon Units 1 & 22003-02-14014 February 2003 January 2003 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-03-001, December 2002 Monthly Operating Report for Diablo Canyon Units 1 & 22003-01-15015 January 2003 December 2002 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-02-143, November 2002 Monthly Operating Report for Diablo Canyon Power Plant, Units 1 & 22002-12-13013 December 2002 November 2002 Monthly Operating Report for Diablo Canyon Power Plant, Units 1 & 2 DCL-02-131, October 2002 Monthly Operating Report for Diablo Canyon Units 1 & 22002-11-15015 November 2002 October 2002 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-02-121, September 2002 Monthly Operating Report for Diablo Canyon Units 1 & 22002-10-14014 October 2002 September 2002 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-02-111, August 2002 Monthly Operating Report for Diablo Canyon Units 1 & 22002-09-13013 September 2002 August 2002 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-02-094, July 2002 Monthly Operating Report for Diablo Canyon. Corrected June 2002 Monthly Operating Report for Unit 1, Enclosed2002-08-15015 August 2002 July 2002 Monthly Operating Report for Diablo Canyon. Corrected June 2002 Monthly Operating Report for Unit 1, Enclosed DCL-02-076, June 2002 Monthly Operating Report for Diablo Canyon Power Plant Units 1 and 22002-07-12012 July 2002 June 2002 Monthly Operating Report for Diablo Canyon Power Plant Units 1 and 2 DCL-02-058, April 2002 Monthly Operating Report for Diablo Canyon Units 1 & 22002-05-10010 May 2002 April 2002 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-02-040, March 2002 Monthly Operating Report for Diablo Canyon Units 1 & 22002-04-15015 April 2002 March 2002 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-02-026, February 2002 Monthly Operating Report for Diablo Canyon, Units 1 and 22002-03-15015 March 2002 February 2002 Monthly Operating Report for Diablo Canyon, Units 1 and 2 DCL-02-016, January 2002 Monthly Operating Report for Diablo Canyon Power Plant, Units 1 & 22002-02-15015 February 2002 January 2002 Monthly Operating Report for Diablo Canyon Power Plant, Units 1 & 2 DCL-02-003, December 2001 Monthly Operating Report for Diablo Canyon Units 1 & 22002-01-15015 January 2002 December 2001 Monthly Operating Report for Diablo Canyon Units 1 & 2 2005-04-14
[Table view] |
Text
PacificGas and Electric Company James R. Becker Diablo Canyon Power Plant Station Director Mail Code t04/5/504 PO. Box 56 Avila Beach, CA 93424 March 15, 2002 B05.545.3462 Fax: 805.545.4234 PG&E Letter DCL-02-026 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, DPR-80 Docket No. 50-323, DPR-82 Diablo Canyon Units I and 2 Monthly OE:ratino Report for February 2002
Dear Commissioners and Staff:
Attached is the Monthly Operating Report for Diablo Canyon Power Plant, Units I and 2, for February 2002. This report is submitted in accordance with Technical Specification 5.6.4 and NRC Generic Letter 97-02.
James R. Becker rid'1713/R0228797 Enclosures cclenc: Robert D. Glynn, Jr.
Kurt Larson Barbara Lewis Ellis W. Merschoff David L. Proulx Girija S. Shukia Gregory M. Rueger INPO Record Center A member of the STARS (Strategic Teaming and Resource Sharing) Alifance Catlaway . Comanche Peak & Diabto Canyon - Palo Verde
- South Texas Project & Wotf Creek
Enclosure 1 PG&E Letter DCL-02-026 FEBRUARY 2002, OPERATION SUMMARIES DIABLO CANYON POWER PLANT UNITS I AND 2 Summary of Unit 1 Operation Unit 1 began February in Mode 1 (Power Operation), at approximately 100 percent power. Both units were curtailed on February 14, 2002, when power was reduced to approximately 58 percent because of entry into T.S. 3.0.3 due to previously identified instrument uncertainties associated with narrow range steam generator (SG) level low low trip setpoint. On February 16, 2002, following resetting of the SG level low-low trip setpoints, operators returned the unit to approximately 100 percent power.
Summary of Unit 2 Operation Unit 2 began January in Mode 1 at approximately 100 percent power. On Feburary 9, 2002, operators manually tripped Unit 2 due to loss of feedwater to a SG.
On February 12, 2002, following replacing of a failed solenoid valve and fuse, operators returned the unit to approximately 100 percent power.
Both units were curtailed on February 14, 2002, to approximately 58 percent because of entry into T.S. 3.0.3 due to previously identified instrument uncertainties associated with narrow range SG level low-low trip setpoint. After reaching approximately 58 percent power, Unit 2 was further curtailed to below 50 percent until the quadrant power tilt ratio had stabilized below 1.02. On February 16, 2002, following resetting of the SG level low-low trip setpoints, operators returned the unit to approximately 100 percent power.
Actuations of Safety or Pressurizer Power Operated Relief Valves There were no challenges to the pressurizer power operated relief valves, pressurizer safety valves, or steam generator safety valves.
Enclosure 2 PG&E Letter DCL-02-026 OPERATING DATA REPORT DOCKET NO.: 50-275 UNIT NAME: Diablo Canyon Unit 1 DATE: 03/01/2002 COMPLETED BY: R.L.Russell TELEPHONE: (805) 545-4327 REPORT MONTH: February 2002
- 1. Design Electrical Rating (MWe - Net): 1103
- 2. Maximum Dependable Capacity (MWe - Net): 1087 This Month YTD Cumulative
- 3. Number of Hours Reactor Critical: 672.0 1416.0 128836.0
- 4. Number of Hours Generator On-Line: 672.0 1416.0 127458.3
- 5. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
- 6. Net Electrical Energy Generated (MWH): 732629 1566213 131714302 1
Enclosure 2 PG&E Letter DCL-02-026 UNIT SHUTDOWNS DOCKET NO.: 50-275 UNIT NAME: Diablo Canyon Unit 1 DATE: 03/01/2002 COMPLETED BY: R.L.Russell TELEPHONE: (805) 545-4327 REPORT MONTH: February 2002 NO. DATE TYPE DURATION REASON1 METHOD CAUSE & CORRECTIVE F(Forced) (HOURS) OF ACTIONS S (Scheduled) SHUTTING DOWN2 COMMENTS N/A There were no shutdowns this month.
- 1. Reason 2. Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training/License Examination 5-Other F- Administrative G-Operational Error (Explain)
H-Other (Explain) 2
Enclosure 2 PG&E Letter DCL-02-026 OPERATING DATA REPORT DOCKET NO.: 50-323 UNIT NAME: Diablo Canyon Unit 2 DATE: 03/01/2002 COMPLETED BY: R.L.Russell TELEPHONE: (805) 545-4327 REPORT MONTH: February 2002
- 1. Design Electrical Rating (MWe - Net): 1119
- 2. Maximum Dependable Capacity (MWe - Net): 1087 This Month YTD Cumulative
- 3. Number of Hours Reactor Critical: 640.1 1384.1 124065.9
- 4. Number of Hours Generator On-Line: 635.0 1379.0 122603.0
- 5. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
- 6. Net Electrical Energy Generated (MWH): 667677 1415906 128821838 3
Enclosure 2 PG&E Letter DCL-02-026 UNIT SHUTDOWNS DOCKET NO.: 50-323 UNIT NAME: Diablo Canyon Unit 2 DATE: 03/01/2002 COMPLETED BY: R.L.Russell TELEPHONE: (805) 545-4327 REPORT MONTH: February 2002 NO. DATE FTYPE (Forced) DURATION (HOURS) REASON' METHOD OF SHUTTING CAUSEACTIONS
& CORRECTIVE S (Scheduled) DOWN2 02/09/02 F 37 A 2 The reactor was manually tripped due to the loss of feedwater to one steam generator. A failed solenoid valve and fuse, which controlled the main feedwater regulating valve to steam generator 2-4, were replaced.
LER-2-2002-002 will be submitted by 04/10/02.
- 1. Reason 2. Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training/License Examination 5-Other F- Administrative G-Operational Error (Explain)
H-Other (Explain) 4