MONTHYEARIR 05000275/20230042024-02-0909 February 2024 Integrated Inspection Report 05000275/2023004 and 05000323/2023004 ML24002B1802024-01-29029 January 2024 LRA Audit Plan DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel ML24018A0152024-01-29029 January 2024 License Renewal Application Review Schedule Letter ML24017A2492024-01-24024 January 2024 Letter to Neil Peyron, Chairman, Tule River Tribe, Re. Diablo Canyon ML24024A1752024-01-24024 January 2024 Letter to Tribal Council San Luis Obispo County Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24003A8902024-01-24024 January 2024 Letter to P. Gerfen - Diablo Canyon Notice of Intent to Conduct Scoping and Prepare an Environmental Impact Statement ML24012A1582024-01-24024 January 2024 Letter to Hon. Violet Sage Walker, Chairwoman Northern Chumash Tribal Council on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0062024-01-24024 January 2024 Achp Scoping Letter for Diablo Canyon License Renewal ML24012A0552024-01-24024 January 2024 Letter to J. Polanco, Shpo, on Request to Initiate Section 106 Consultation and Scooping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1562024-01-24024 January 2024 Letter to Hon. Gabe Frausto, Coastal Band of Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1652024-01-24024 January 2024 Letter to Hon. Mona Olivas Tucker, Yak Tityu Tityu Yak Tilhini Northern Chumas Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1612024-01-24024 January 2024 Letter Hon. Gary Pierce, Salian Tribe of Monterey and San Luis Obispo Counties on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0362024-01-24024 January 2024 Request to Initiate Section 106 Consultation and Scoping Process for the Environmental Review License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000275/20230112024-01-12012 January 2024 NRC License Renewal Phase 1 Inspection Report 05000275/2023011 DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel ML23326A0122023-12-21021 December 2023 12-21-23 Letter to the Honorable Byron Donalds from Chair Hanson Responds to Letter Regarding 2.206 Petition to Close Diablo Canyon Nuclear Power Plant, Unit 1 ML23341A0042023-12-19019 December 2023 LRA Acceptance Letter ML23352A2342023-12-18018 December 2023 Notification of Age-Related Degradation Inspection (05000275/2024014 and 05000323/2024014) and Request for Information DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update ML23355A0952023-12-0808 December 2023 License Renewal Application Online Reference Portal DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 ML23291A2702023-11-28028 November 2023 Letter to Nakia Zavalla, Shpo, the Santa Ynez Band of Chumash Indians; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23320A2442023-11-28028 November 2023 Letter to Kerri Vera, Director of Department of Environmental Protection, Tule River Tribe; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23325A1382023-11-27027 November 2023 ISFSI Tribal Letter to San Luis Obispo County Chumash Indians ML23325A1322023-11-27027 November 2023 ISFSI Tribal Letter to Salian Tribe of Montgomery, San Luis Obispo ML23325A1332023-11-27027 November 2023 ISFSI Tribal Letter to Yak Tityu Tityu Northern Chumash Indians ML23307A0062023-11-27027 November 2023 ISFSI Tribal Letter to Northern Chumash Tribal Council ML24003A7242023-11-27027 November 2023 Independent Safety Committee; Diab Lo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety ML23325A1292023-11-27027 November 2023 ISFSI Tribal Letter to Coastal Band of Chumash ML23320A1502023-11-17017 November 2023 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, & Opportunity for Hearing (Exigent Circumstances) (EPID L-2023-LLA-0155) - LTR DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System ML23296A0982023-11-15015 November 2023 Notification and Request for Consultation Regarding Pacific Gas and Electric Diablo Canyon Independent Spent Fuel Storage Installation Material License Renewal Request (Docket Number: 72-26) DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML23293A1052023-11-14014 November 2023 Receipt and Availability of License Renewal Application IR 05000275/20230032023-11-13013 November 2023 Integrated Inspection Report 05000275/2023003 and 05000323/2023003 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application ML23318A2102023-10-31031 October 2023 Independent Safety Committee; Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) 2024-02-09
[Table view] Category:License-Monthly Operating Report
MONTHYEARDCL-05-040, March 2005 Monthly Operating Report for Diablo Canyon Units 1 and 22005-04-14014 April 2005 March 2005 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-05-021, February 2005 Monthly Operating Report for Diablo Canyon Units 1 and 22005-03-11011 March 2005 February 2005 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-05-010, January 2005 Monthly Operating Report for Diablo Canyon, Units 1 and 22005-02-11011 February 2005 January 2005 Monthly Operating Report for Diablo Canyon, Units 1 and 2 ML0502501392005-01-14014 January 2005 December 2004 Monthly Operating Report for Diablo Canyon, Units 1 and 2 DCL-04-171, November 2004 Monthly Operating Report for Diablo Canyon Units 1 and 22004-12-14014 December 2004 November 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-04-155, October 2004 Monthly Operating Report for Diablo Canyon Units 1 and 22004-11-12012 November 2004 October 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-04-132, September 2004 Monthly Operating Report for Diablo Canyon Units 1 and 22004-10-15015 October 2004 September 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-04-115, August 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 and Corrected June and July Data Sheets2004-09-15015 September 2004 August 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 and Corrected June and July Data Sheets DCL-04-103, July 2004 Monthly Operating Report for Diablo Canyon Units 1 and 22004-08-16016 August 2004 July 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-04-087, June 2004 Monthly Operating Report for Diablo Canyon Units 1 and 22004-07-15015 July 2004 June 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-04-060, April 2004 Monthly Operating Report for Diablo Canyon Units 1 and 22004-05-14014 May 2004 April 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-04-044, March 2004 Monthly Operating Report for Diablo Canyon Units 1 and 22004-04-15015 April 2004 March 2004 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-04-027, February 2004 Monthly Operating Report for Diablo Canyon, Units 1 and 22004-03-12012 March 2004 February 2004 Monthly Operating Report for Diablo Canyon, Units 1 and 2 DCL-04-015, January 2004 Monthy Operating Report for Diablo Canyon, Units 1 and 22004-02-13013 February 2004 January 2004 Monthy Operating Report for Diablo Canyon, Units 1 and 2 DCL-04-003, December 2003 Monthly Operating Report for Diablo Canyon2004-01-15015 January 2004 December 2003 Monthly Operating Report for Diablo Canyon DCL-03-170, November 2003 Monthly Operating Report for Diablo Canyon Units 1 and 22003-12-12012 December 2003 November 2003 Monthly Operating Report for Diablo Canyon Units 1 and 2 DCL-03-148, October 2003 Monthly Operating Report for Diablo Canyon, Units 1 & 22003-11-12012 November 2003 October 2003 Monthly Operating Report for Diablo Canyon, Units 1 & 2 DCL-03-129, September 2003 Monthly Operating Report for Diablo Canyon Units 1 & 22003-10-15015 October 2003 September 2003 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-03-099, July 2003 Monthly Operating Report for Diablo Canyon, Units 1 & 22003-08-15015 August 2003 July 2003 Monthly Operating Report for Diablo Canyon, Units 1 & 2 DCL-03-083, June 2003 Monthly Operating Report for Diablo Canyon Power Plant, Units 1 and 22003-07-15015 July 2003 June 2003 Monthly Operating Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-03-068, May 2003 Monthly Operating Report for Diablo Canyon Units 1 & 22003-06-13013 June 2003 May 2003 Monthly Operating Report for Diablo Canyon Units 1 & 2 ML0314303512003-05-15015 May 2003 April 2003 Monthly Operating Report for Diablo Canyon Power Plant Units 1 & 2 DCL-03-038, March 2003 Monthly Operating Report for Diablo Canyon Units 1 & 22003-04-15015 April 2003 March 2003 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-03-032, February 2003 Monthly Operating Report for Diablo Canyon, Units 1 & 22003-03-14014 March 2003 February 2003 Monthly Operating Report for Diablo Canyon, Units 1 & 2 DCL-03-015, January 2003 Monthly Operating Report for Diablo Canyon Units 1 & 22003-02-14014 February 2003 January 2003 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-03-001, December 2002 Monthly Operating Report for Diablo Canyon Units 1 & 22003-01-15015 January 2003 December 2002 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-02-143, November 2002 Monthly Operating Report for Diablo Canyon Power Plant, Units 1 & 22002-12-13013 December 2002 November 2002 Monthly Operating Report for Diablo Canyon Power Plant, Units 1 & 2 DCL-02-131, October 2002 Monthly Operating Report for Diablo Canyon Units 1 & 22002-11-15015 November 2002 October 2002 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-02-121, September 2002 Monthly Operating Report for Diablo Canyon Units 1 & 22002-10-14014 October 2002 September 2002 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-02-111, August 2002 Monthly Operating Report for Diablo Canyon Units 1 & 22002-09-13013 September 2002 August 2002 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-02-094, July 2002 Monthly Operating Report for Diablo Canyon. Corrected June 2002 Monthly Operating Report for Unit 1, Enclosed2002-08-15015 August 2002 July 2002 Monthly Operating Report for Diablo Canyon. Corrected June 2002 Monthly Operating Report for Unit 1, Enclosed DCL-02-076, June 2002 Monthly Operating Report for Diablo Canyon Power Plant Units 1 and 22002-07-12012 July 2002 June 2002 Monthly Operating Report for Diablo Canyon Power Plant Units 1 and 2 DCL-02-058, April 2002 Monthly Operating Report for Diablo Canyon Units 1 & 22002-05-10010 May 2002 April 2002 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-02-040, March 2002 Monthly Operating Report for Diablo Canyon Units 1 & 22002-04-15015 April 2002 March 2002 Monthly Operating Report for Diablo Canyon Units 1 & 2 DCL-02-026, February 2002 Monthly Operating Report for Diablo Canyon, Units 1 and 22002-03-15015 March 2002 February 2002 Monthly Operating Report for Diablo Canyon, Units 1 and 2 DCL-02-016, January 2002 Monthly Operating Report for Diablo Canyon Power Plant, Units 1 & 22002-02-15015 February 2002 January 2002 Monthly Operating Report for Diablo Canyon Power Plant, Units 1 & 2 DCL-02-003, December 2001 Monthly Operating Report for Diablo Canyon Units 1 & 22002-01-15015 January 2002 December 2001 Monthly Operating Report for Diablo Canyon Units 1 & 2 2005-04-14
[Table view] |
Text
Flen Pacific Gas and Electric Company James R.Becker Vice President-Diablo Canyon Diablo Canyon Power Plant PO. Box 56 Operations and Station Director Avila Beach, CA 93424 May 15, 2003 805.545.3462 Fax: 805.545.4234 PG&E Letter DCL-03053 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Monthly Operating Report for April 2003
Dear Commissioners and Staff:
Attached is the Monthly Operating Report for Diablo Canyon Power Plant, Units 1 and 2, for April 2003. This report is submitted in accordance vith Technical Specification 5.6.4 and NRC Generic Letter 97-02.
Sincer ly, James R. Becker LMP/1 713/R0245720 Enclosures cclenc: Paul R. Fox, American Nuclear Insurers Robert D. Glynn, Jr.
Ellis W. Merschoff, NRC Regional Administrator, Region IV David L. Prouix, NRC Senior Resident Inspector Gregory M. Rueger Girija S. Shukla, NRC Project Manager INPO Record Center 0
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callawav
- Palo Verde South Texas Proiect
Enclosure 1 PG&E Letter DCL-03-053 APRIL 2003, OPERATION SUMMARIES DIABLO CANYON POWER PLANT UNITS I AND 2 Summary of Unit 1 Operation Unit 1 began April in Mode I (Power Operation) at approximately 100 percent power.
There were no significant operational activities.
SummarV of Unit 2 Operation Unit 2 began April in Mode I at approximately 50 percent power. On April 4, 2003, with Unit 2 at approximately 54 percent power, an auxiliary feedwater (AFW) check valve was discovered with its internals installed incorrectly, prompting a Technical Specification required manual shutdown to Mode 5 (Cold Shutdown) to replace the check valve (reference NRC event number 39735).D On April 8, 2003, with Unit 2 in Mode 5, the AFW system actuated on an unplanned signal from the solid state protection system which was placed in service while a steam generator level was below the AFW actuation set point (reference NRC event number 39743). On April 15, 2003, operators entered Mode 1.
On April 16, 2003, operators paralleled Unit 2 to the grid. Unit 2 ended the month at approximately 100 percent power.
Actuations of Pressurizer Safety or Power Operated Relief Valves On April 19, 2003, with Unit 2 at approximately 92 percent power, PCV-456, Pressurizer PORV opened inadvertently during surveillance testing. The interlock automatically closed the PORV, and operators closed the block valve. The pressurizer pressure during the transient dipped to approximately 2165 PSIG. The cause was determined to be use of a superceded procedure.
There were no other challenges to the pressurizer power operated relief valves, pressurizer safety valves, or steam generator safety valves.
Enclosure 2 PG&E Letter DCL-03-053 OPERATING DATA REPORT DOCKET NO.: 50-275 UNIT NAME: Diablo Canyon Unit 1 DATE: 05/01/2003 COMPLETED BY: L. M. Parker TELEPHONE: (805) 545-3386 REPORT MONTH: April 2003
- 1. I Design Electrical Rating (MWe - Net): l 1,103
- 2. Maximum Dependable Capacity (Mwe - Net): l 1,087 1 This Month YTD Cumulative
- 3. Number of Hours Reactor Critical: - 719.0 2,879.01 137,105.8 4.
5.
6.
Number of Hours Generator On-Line:
Unit Reserve Shutdown Hours:
Net Electrical Energy Generated (MWH):
j0.0 719.0l 796,269 2,879.0 00 135,588.6 0.0 3,183,170l 140,389,469 1
Enclosure 2 PG&E Letter DCL-03-053 UNIT SHUTDOWNS DOCKET NO.: 50-275 UNIT NAME: Diablo Canyon Unit 1 DATE: 05/01/2003 COMPLETED BY: L. M. Parker TELEPHONE: (805) 545-3386 REPORT MONTH: April 2003 NO. DATE TYPE DURATION REASON' METHOD CAUSE & CORRECTIVE (YMMDD) F (Forced) (HOURS) OF ACTIONS S (Scheduled) SHUTTING COMMENTS 2
DOWN N/A There were no shutdowns this month.
- 1. Reason 2. Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training/License Examination 5-Other F- Administrative G-Operational Error (Explain)
H-Other (Explain) 2
Enclosure 2 PG&E Letter DCL-03-053 OPERATING DATA REPORT DOCKET NO.: 50-323 UNIT NAME: Diablo Canyon Unit 2 DATE: 05/01/2003 COMPLETED BY: L. M. Parker TELEPHONE: (805) 545-3386 REPORT MONTH: April 2003 I 1. Design Electrical Rating (MWe - Net): l 1119 l
- 2. Maximum Dependable Capacity (MWe - Net): l 1087 1 This Month YTD Cumulative
- 3. Number of Hours Reactor Critical: 468.0 1,410.4 132,768.9
- 4. Number of Hours Generator On-Line: 445.2 1,345.2 131,233.1
- 5. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
- 6. Net Electrical Energy Generated (MWH): 399,723 1,295,826 137,987,816 3
Enclosure 2 PG&E Letter DCL-03-053 UNIT SHUTDOWNS DOCKET NO.: 50-323 UNIT. NAME: Diablo Canyon Unit 2 DATE: 05/01/2003 COMPLETED BY: L. M. Parker TELEPHONE: (805) 545-3386 REPORT MONTH: April 2003 NO. DATE TYPE DURATION REASON 1 METHOD CAUSE & CORRECTIVE MMDD) F(Forced) (HOURS) OF SHUTTING ACTIONS COMMENTS (YYMMDD)S(Scheduled)
DOWN 3 030404 F 273.8 D 1 Technical Specification required manual shutdown in response to the discovery of an AFW check valve with internals installed incorrectly.
'Reference NRC Event Number 39735, LER 2-2003-005. The valve was replaced with a different model.
- 1. Reason 2. Method A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training/License Examination 5-Other F- Administrative G-Operational Error (Explain)
H-Other (Explain) 4