Category:Letter type:CNL
MONTHYEARCNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-022, Decommissioning Funding Status Report2023-03-29029 March 2023 Decommissioning Funding Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu CNL-23-021, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-03-0808 March 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-015, Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08)2023-02-27027 February 2023 Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08) CNL-23-003, Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A2023-01-30030 January 2023 Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A CNL-23-009, Response to Request for Additional Information Request to Revise Technical Specification 3.4.122023-01-0404 January 2023 Response to Request for Additional Information Request to Revise Technical Specification 3.4.12 CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-12-22022 December 2022 Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-109, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2022-12-22022 December 2022 Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements CNL-22-101, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-012022-11-28028 November 2022 American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat2022-11-28028 November 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio CNL-22-099, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2022-10-31031 October 2022 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-22-098, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 552022-10-17017 October 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 55 CNL-22-085, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Al2022-09-0202 September 2022 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alte CNL-22-077, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-08-11011 August 2022 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-071, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-07-13013 July 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-22-070, Status Regarding the Improved Flood Mitigation System Project2022-06-30030 June 2022 Status Regarding the Improved Flood Mitigation System Project CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-06-0909 June 2022 Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change CNL-22-068, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-06-0808 June 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-047, Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2022-05-23023 May 2022 Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-22-043, Response to Request for Additional Information and Confirmation of Information Regarding Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board.2022-05-0202 May 2022 Response to Request for Additional Information and Confirmation of Information Regarding Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board. CNL-22-046, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan.2022-04-28028 April 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan. 2024-01-09
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARCNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu CNL-23-015, Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08)2023-02-27027 February 2023 Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08) CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-071, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-07-13013 July 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-22-001, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-04-0404 April 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-22-003, Application to Modify the Allowable Value for Watts Bar Nuclear Plant, Unit 1 Technical Specification Table 3.3.2-1, Function 6.e(1) (WBN-TS-21-010)2022-02-17017 February 2022 Application to Modify the Allowable Value for Watts Bar Nuclear Plant, Unit 1 Technical Specification Table 3.3.2-1, Function 6.e(1) (WBN-TS-21-010) CNL-21-018, Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance .2021-12-0909 December 2021 Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance . CNL-21-062, Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board Cleaning (WBN-TS-19-019)2021-09-29029 September 2021 Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board Cleaning (WBN-TS-19-019) ML21202A2242021-07-0202 July 2021 Tennessee Valley Authority (TVA)- Watts Bar Nuclear Plant (WBN)- NPDES Permit No. TN0020168-Application Request for Permit Renewal CNL-21-038, Application to Revise the Measurement Units for the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for the Containment Vent Isolation Instrumentation and Control Room Emergency Ventilation System Radiation Monitors (W2021-06-0101 June 2021 Application to Revise the Measurement Units for the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for the Containment Vent Isolation Instrumentation and Control Room Emergency Ventilation System Radiation Monitors (WBN CNL-21-045, Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN82021-04-29029 April 2021 Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89- CNL-21-013, Application to Modify Technical Specifications Steam Generator Inspection/Repair Program Provisions and Unit 2 Facility Operating License Condition 2.C.(4) (WBN-TS-20-06)2021-03-11011 March 2021 Application to Modify Technical Specifications Steam Generator Inspection/Repair Program Provisions and Unit 2 Facility Operating License Condition 2.C.(4) (WBN-TS-20-06) CNL-21-015, Expedited Application to Modify Watts Bar Nuclear Plant, Unit 1 Technical Specification 3.7.12, Auxiliary Building Gas Treatment System, for One-Time Exception to Permit Opening of the Auxiliary Building Secondary Containment Enclosure as2021-03-0303 March 2021 Expedited Application to Modify Watts Bar Nuclear Plant, Unit 1 Technical Specification 3.7.12, Auxiliary Building Gas Treatment System, for One-Time Exception to Permit Opening of the Auxiliary Building Secondary Containment Enclosure as N CNL-21-016, License Amendment Request to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level to Accommodate the Replacement Steam Generators (WBN-TS-20-05)2021-03-0202 March 2021 License Amendment Request to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level to Accommodate the Replacement Steam Generators (WBN-TS-20-05) CNL-21-010, Correction of Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology (WBN-TS-19-04) (EPID2021-01-26026 January 2021 Correction of Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology (WBN-TS-19-04) (EPID L CNL-20-104, Expedited Application for Approval to Use an Alternate Method of Determining Probability of Detection for (WBN TS-391-20-024)2020-12-23023 December 2020 Expedited Application for Approval to Use an Alternate Method of Determining Probability of Detection for (WBN TS-391-20-024) CNL-20-093, Supplement to Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications 5.7.2.19 'Containment Leakage Rate Testing Program' (WBN-TS-19-01)2020-12-15015 December 2020 Supplement to Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications 5.7.2.19 'Containment Leakage Rate Testing Program' (WBN-TS-19-01) CNL-20-087, Non-Voluntary Application to Modify Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications Surveillance Requirement 3.6.15.4, Shield Building, (WBN-TS-20-017)2020-12-15015 December 2020 Non-Voluntary Application to Modify Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications Surveillance Requirement 3.6.15.4, Shield Building, (WBN-TS-20-017) CNL-20-078, Supplement to Application to Revise Watts Bar Nuclear Plant (Wbn), Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency and to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sa2020-10-13013 October 2020 Supplement to Application to Revise Watts Bar Nuclear Plant (Wbn), Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency and to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Samp CNL-20-006, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications 5.7.2.19 Containment Leakage Rate Testing Program (WBN-TS-19-01)2020-10-0202 October 2020 Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications 5.7.2.19 Containment Leakage Rate Testing Program (WBN-TS-19-01) CNL-20-058, Tennessee Valley Authority, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Function 6.e of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation (WBN-TS-19-27)2020-08-27027 August 2020 Tennessee Valley Authority, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Function 6.e of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation (WBN-TS-19-27) CNL-20-041, License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016)2020-08-14014 August 2020 License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016) CNL-20-047, Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance2020-07-31031 July 2020 Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance Re CNL-20-063, Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)2020-07-27027 July 2020 Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) CNL-20-053, Application to Revise Watts Bar Nuclear Plant, Unit 1, Technical Specifications for Steam Generator Tube Inspection Frequency & to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection, (WBN-392020-07-17017 July 2020 Application to Revise Watts Bar Nuclear Plant, Unit 1, Technical Specifications for Steam Generator Tube Inspection Frequency & to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection, (WBN-390- CNL-20-040, License Amendment Request to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec (WBN-TS-20-07)2020-07-17017 July 2020 License Amendment Request to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec (WBN-TS-20-07) CNL-20-016, Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23)2020-06-22022 June 2020 Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23) CNL-20-012, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-18-16)2020-05-19019 May 2020 Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-18-16) CNL-20-005, License Amendment Request to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position, (WBN-TS-20-02)2020-04-0303 April 2020 License Amendment Request to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position, (WBN-TS-20-02) CNL-19-115, Non-Voluntary License Amendment Request to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specific2020-03-0202 March 2020 Non-Voluntary License Amendment Request to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specificat CNL-19-084, Second Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program...2020-01-17017 January 2020 Second Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program... CNL-19-051, Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology2020-01-17017 January 2020 Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology CNL-20-004, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01)2020-01-17017 January 2020 Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01) CNL-19-110, Application to Revise Technical Specifications 3.8.1, AC Sources - Operating (WBN-TS-18-10)2019-12-17017 December 2019 Application to Revise Technical Specifications 3.8.1, AC Sources - Operating (WBN-TS-18-10) CNL-19-077, Application to Modify Watts Bar Nuclear Plant (WBN) Unit 1 and Unit 2 Technical Specifications 3.6.15, Shield Building, (WBN-TS-19-10)2019-12-0606 December 2019 Application to Modify Watts Bar Nuclear Plant (WBN) Unit 1 and Unit 2 Technical Specifications 3.6.15, Shield Building, (WBN-TS-19-10) CNL-19-067, Application to Revise Watts Bar Nuclear Plant (WBN) Unit 2 - Technical Specifications for Steam Generator Tube Repair Sleeve (WBN-TS-391-19-13)2019-09-30030 September 2019 Application to Revise Watts Bar Nuclear Plant (WBN) Unit 2 - Technical Specifications for Steam Generator Tube Repair Sleeve (WBN-TS-391-19-13) CNL-19-060, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (WBN-TS-18-14)2019-08-29029 August 2019 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (WBN-TS-18-14) CNL-19-038, License Amendment Request to Make Miscellaneous Administrative Changes (WBN-TS-19-02)2019-06-0707 June 2019 License Amendment Request to Make Miscellaneous Administrative Changes (WBN-TS-19-02) CNL-19-014, Application to Modify Watts Bar Nuclear Plant Unit 2 Technical Specifications 3.7.8 to Extend the Completion Time for an Inoperable Essential Raw Cooling Water Train on a One-Time Basis (WBN-TS-18-07)2019-02-0707 February 2019 Application to Modify Watts Bar Nuclear Plant Unit 2 Technical Specifications 3.7.8 to Extend the Completion Time for an Inoperable Essential Raw Cooling Water Train on a One-Time Basis (WBN-TS-18-07) CNL-18-118, Application to Revise Technical Specifications Regarding DC Electrical Systems TStf-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 (WBN-TS-18-09)2018-11-29029 November 2018 Application to Revise Technical Specifications Regarding DC Electrical Systems TStf-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 (WBN-TS-18-09) CNL-18-068, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (WBN-TS-17-24)2018-11-29029 November 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (WBN-TS-17-24) CNL-18-119, Application to Revise Watt Bar Nuclear Plant, Units 1 & 2, Technical Specifications 3.8.1, 3.8.7, 3.8.8, and 3.8.9, Regarding Electrical Power Systems (WBN-TS-1808)2018-11-26026 November 2018 Application to Revise Watt Bar Nuclear Plant, Units 1 & 2, Technical Specifications 3.8.1, 3.8.7, 3.8.8, and 3.8.9, Regarding Electrical Power Systems (WBN-TS-1808) CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays 2023-09-20
[Table view] Category:Technical Specification
MONTHYEARCNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) WBL-23-052, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual2023-11-0808 November 2023 Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) WBL-22-026, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual2022-05-11011 May 2022 Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual ML20273A0432020-09-29029 September 2020 Plants Unit 1 and 2 - Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual CNL-20-008, Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28)2020-07-27027 July 2020 Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28) CNL-20-016, Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23)2020-06-22022 June 2020 Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23) CNL-20-004, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01)2020-01-17017 January 2020 Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01) CNL-19-051, Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology2020-01-17017 January 2020 Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology CNL-19-097, Non-Voluntary License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values (TS-19-22)2019-10-23023 October 2019 Non-Voluntary License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values (TS-19-22) CNL-19-105, Supplemental Response to Second-Round NRC Request for Additional Information Regarding Application to Revise Technical Specifications Regarding DC Electrical Systems TSTF-500, Revision 2 (WBN-TS-18-09)2019-10-10010 October 2019 Supplemental Response to Second-Round NRC Request for Additional Information Regarding Application to Revise Technical Specifications Regarding DC Electrical Systems TSTF-500, Revision 2 (WBN-TS-18-09) L-19-023, Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual2019-03-19019 March 2019 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays CNL-18-006, Technical Specification Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01)2018-01-10010 January 2018 Technical Specification Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01) CNL-17-149, Revised Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025)2017-12-27027 December 2017 Revised Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025) ML17321A0332017-11-16016 November 2017 Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025) ML17306A8022017-11-0202 November 2017 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual NL-17-128, Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23)2017-10-11011 October 2017 Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23) CNL-17-128, Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23)2017-10-11011 October 2017 Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23) CNL-17-123, Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025)2017-09-29029 September 2017 Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025) CNL-17-044, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (Abgts), for Watts Bar Nuclear Plant, Units 1 and 22017-05-0505 May 2017 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (Abgts), for Watts Bar Nuclear Plant, Units 1 and 2 CNL-17-022, Application to Modify Technical Specification 5.7.2.19 Regarding One-Time Extension of 10 CFR 50, Appendix J Type C Local Leakage Rate Tests (391-WBN-TS-17-05)2017-02-16016 February 2017 Application to Modify Technical Specification 5.7.2.19 Regarding One-Time Extension of 10 CFR 50, Appendix J Type C Local Leakage Rate Tests (391-WBN-TS-17-05) ML16113A0772016-04-22022 April 2016 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual CNL-15-060, Technical Specifications Change No. WBN2-TS-15-16 - Revise Technical Specifications for Use of Steam Generator Alternate Repair Criterion F2015-12-15015 December 2015 Technical Specifications Change No. WBN2-TS-15-16 - Revise Technical Specifications for Use of Steam Generator Alternate Repair Criterion F ML15267A1832015-09-23023 September 2015 Watts Bar, Unit 2 - Submittal of Final Revision 0 of the Technical Specifications & Technical Specification Bases, and Final Revision 0 of the Technical Requirements Manual & Technical Requirements Manual Bases NL-15-181, Watts Bar Unit 1, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mod2015-09-0303 September 2015 Watts Bar Unit 1, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode CNL-15-181, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 42015-09-0303 September 2015 Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 4 CNL-15-133, Response to Request for Additional Information Related to Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08)2015-07-15015 July 2015 Response to Request for Additional Information Related to Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08) CNL-15-088, Application to Revise Technical Specifications for Component Cooling Water Snd Essential Raw Cooling Water to Support Dual Unit Operation (TS-WBN-15-13)2015-06-17017 June 2015 Application to Revise Technical Specifications for Component Cooling Water Snd Essential Raw Cooling Water to Support Dual Unit Operation (TS-WBN-15-13) CNL-14-218, Application to Modify Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08)2015-04-0606 April 2015 Application to Modify Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08) CNL-15-001, Application to Revise Technical Specification 4.2.1, Fuel Assemblies, (WBN-TS-15-03)2015-03-31031 March 2015 Application to Revise Technical Specification 4.2.1, Fuel Assemblies, (WBN-TS-15-03) CNL-14-217, Responses to Requests for Additional Information - Developmental Revision I Technical Specification Sections 3.8 and 5.72015-03-0505 March 2015 Responses to Requests for Additional Information - Developmental Revision I Technical Specification Sections 3.8 and 5.7 CNL-14-180, Technical Specification Sections 3.0 and 3.10.12015-01-22022 January 2015 Technical Specification Sections 3.0 and 3.10.1 ML14307A9812014-11-0303 November 2014 Periodic Submission for Changes Made to Technical Specification Bases and Technical Requirement Manual ML14170A0442014-06-16016 June 2014 Attachment 5 - WBN Unit 2 TS and Tsb Through Developmental Revision I, and Trm and Trmb Through Developmental Revision D ML14170A0452014-06-16016 June 2014 Attachment 1 - TS Developmental Revision I Changes (Mark-Up) for WBN Unit 2 ML14170A0462014-06-16016 June 2014 Attachment 2 - TS Bases Developmental Revision I Changes (Mark-Up) for WBN Unit 2 ML13357A0512013-12-12012 December 2013 Synopsis of Revisions Included in Watts Bar Unit 2 Developmental Revision H of Technical Specifications and Technical Specification Bases. Part 2 of 2 ML13357A0542013-12-12012 December 2013 Technical Specifications Bases ML13353A4782013-12-12012 December 2013 Fuel Handling Accident Dose Analysis Final Safety Analysis Report and Technical Specification Revision ML12333A2422012-11-20020 November 2012 Application to Modify Technical Specification 4.3.1, Criticality, (WBN-TS-12-03) ML12333A2402012-11-19019 November 2012 Unit I, Application to Modify Technical Specification 3.7.10, Control Room Emergency Ventilation System (WBN-TS-12-01) ML12240A2242012-08-23023 August 2012 Update to Technical Requirements Manual (TRM) Bases Section 3.7.2, Developmental Revision B ML12065A0352012-02-28028 February 2012 Watts Bar, Unit 2 - Technical Specifications Table of Contents Through Page B 3.9-32 ML12065A0362012-02-28028 February 2012 Submittal of Developmental Revision G of the Unit 2 Technical Specification (TS) and Technical Specification Bases 2023-09-20
[Table view] Category:Bases Change
MONTHYEARWBL-23-052, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual2023-11-0808 November 2023 Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu WBL-22-026, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual2022-05-11011 May 2022 Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual ML20273A0432020-09-29029 September 2020 Plants Unit 1 and 2 - Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual CNL-19-051, Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology2020-01-17017 January 2020 Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology L-19-023, Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual2019-03-19019 March 2019 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays CNL-18-006, Technical Specification Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01)2018-01-10010 January 2018 Technical Specification Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01) ML17306A8022017-11-0202 November 2017 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual CNL-17-022, Application to Modify Technical Specification 5.7.2.19 Regarding One-Time Extension of 10 CFR 50, Appendix J Type C Local Leakage Rate Tests (391-WBN-TS-17-05)2017-02-16016 February 2017 Application to Modify Technical Specification 5.7.2.19 Regarding One-Time Extension of 10 CFR 50, Appendix J Type C Local Leakage Rate Tests (391-WBN-TS-17-05) ML16113A0772016-04-22022 April 2016 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual CNL-15-060, Technical Specifications Change No. WBN2-TS-15-16 - Revise Technical Specifications for Use of Steam Generator Alternate Repair Criterion F2015-12-15015 December 2015 Technical Specifications Change No. WBN2-TS-15-16 - Revise Technical Specifications for Use of Steam Generator Alternate Repair Criterion F ML15267A1832015-09-23023 September 2015 Watts Bar, Unit 2 - Submittal of Final Revision 0 of the Technical Specifications & Technical Specification Bases, and Final Revision 0 of the Technical Requirements Manual & Technical Requirements Manual Bases CNL-15-181, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 42015-09-0303 September 2015 Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 4 NL-15-181, Watts Bar Unit 1, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mod2015-09-0303 September 2015 Watts Bar Unit 1, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode CNL-14-217, Responses to Requests for Additional Information - Developmental Revision I Technical Specification Sections 3.8 and 5.72015-03-0505 March 2015 Responses to Requests for Additional Information - Developmental Revision I Technical Specification Sections 3.8 and 5.7 CNL-14-180, Technical Specification Sections 3.0 and 3.10.12015-01-22022 January 2015 Technical Specification Sections 3.0 and 3.10.1 ML14307A9812014-11-0303 November 2014 Periodic Submission for Changes Made to Technical Specification Bases and Technical Requirement Manual ML13357A0542013-12-12012 December 2013 Technical Specifications Bases ML13353A4782013-12-12012 December 2013 Fuel Handling Accident Dose Analysis Final Safety Analysis Report and Technical Specification Revision ML13357A0512013-12-12012 December 2013 Synopsis of Revisions Included in Watts Bar Unit 2 Developmental Revision H of Technical Specifications and Technical Specification Bases. Part 2 of 2 ML12333A2422012-11-20020 November 2012 Application to Modify Technical Specification 4.3.1, Criticality, (WBN-TS-12-03) ML12333A2402012-11-19019 November 2012 Unit I, Application to Modify Technical Specification 3.7.10, Control Room Emergency Ventilation System (WBN-TS-12-01) ML12240A2242012-08-23023 August 2012 Update to Technical Requirements Manual (TRM) Bases Section 3.7.2, Developmental Revision B ML12065A0352012-02-28028 February 2012 Watts Bar, Unit 2 - Technical Specifications Table of Contents Through Page B 3.9-32 ML12065A0362012-02-28028 February 2012 Submittal of Developmental Revision G of the Unit 2 Technical Specification (TS) and Technical Specification Bases ML11321A3082011-11-14014 November 2011 Changes Made to the Technical Specification Bases ML11228A0482011-08-10010 August 2011 Technical Specifications Bases (Developmental Revision F), Enclosure 2 ML11227A2562011-08-10010 August 2011 Application to Modify Watts Bar Nuclear Plant, Unit 1, Technical Specifications in Support of Watts Bar Nuclear Plant, Unit 2, Testing and Operation (TS-WBN-11-02) ML1104905702011-02-16016 February 2011 Supplemental Information for Review of Developmental Revision a of the Unit 2 Technical Specifications (TS) and Technical Specifications Bases (TS Bases) ML1015400652010-05-28028 May 2010 Technical Specifications Change WBN-TS-10-05 - Control Rod Assemblies ML1011701482010-04-20020 April 2010 Changes Made to the Technical Specification Bases ML1005506002010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.9 - Refueling Operations ML1005504822010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 2.0 - Safety Limits ML1005505972010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.8 - Electrical Power Systems ML1005505942010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.7 - Plant Systems ML1005505902010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.6 - Containment Systems ML1005505052010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.4 - Reactor Coolant System ML1005504972010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.2 - Power Distribution Limits ML1005504882010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.0 - Limiting Condition for Operation (LCO) Applicability ML1005504782010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases, Table of Contents ML1005505012010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.3 - Instrumentation ML1005505372010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.5 - Emergency Core Cooling Systems ML1005504942010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.1 - Reactivity Control Systems ML0919401912009-07-0909 July 2009 Watts, Unit 1 - Technical Specifications Change - Core Power Distribution Monitoring System. ML0916100682009-06-0505 June 2009 Change to TS 3.6.3, Containment Isolation Valves, Regarding Position Verification Requirements (TSTF-269-A, TSTF-45-A, and TSTF-440-A) ML0826610312008-09-22022 September 2008 Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual ML0826703612008-09-18018 September 2008 Unit 1 - License Amendment (TS-08-09) to Revise the Technical Specifications (Ts), Bases and Updated Final Safety Analysis Report (UFSAR) for the Unit 2 Vital Inverters ML0826705432008-09-18018 September 2008 Technical Specification (TS) Change No. 08-07, Auxiliary Feedwater Auto-Start Upon Trip of the Turbine Driven Main Feedwater Pumps ML0821800932008-08-0101 August 2008 Watt'S Bar, Unit 1, Technical Specifications Change - Revision of Boron Requirements for Cold Leg Accumulators and Refueling Water Storage Tank. 2023-03-20
[Table view] |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-18-006 January 10, 2018 10 CFR 50.90 10 CFR 50.91 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 Facility Operating License No. NPF-96 NRC Docket No. 50-391
Subject:
Watts Bar Nuclear Plant Unit 2 - Technical Specification Change -
Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01)
References:
- 1. NRC Letter to TVA, Watts Bar Unit 1 - Issuance of Exigent Technical Specification Amendment Concerning Inoperable Reactor Coolant System Temperature Indicator (TAC No. MC4979), dated November 19, 2004 (ML043140476)
- 2. NRC Letter to TVA, Watts Bar Unit 1 - Issuance of Exigent Amendment Regarding Application to Allow Temperature Indication for Reactor Coolant System Loop 3 to be Inoperable for the Remainder of Operating Cycle 13 (TAC No. MF6286), dated June 12, 2015 (ML15160A407)
In accordance with the provisions of Title 10 of the Code of Federal Regulations (10 CFR) 50.90, "Application for amendment of license, construction permit, or early site permit," and 10 CFR 50.91(a)(6), Notice for public comment; State consultation, Tennessee Valley Authority (TVA) is submitting an exigent request for an amendment to Facility Operating License No. NPF-96 for Watts Bar Nuclear Plant (WBN) Unit 2 for Nuclear Regulatory Commission (NRC) approval.
WBN Unit 2 TS Table 3.3.4-1, Function 4a, requires at least one RCS hot leg temperature indication function per loop to be operable. With one or more required Functions inoperable, WBN Unit 2 TS 3.3.4, Remote Shutdown System, Condition A, requires the inoperable Function to be restored to operable status within 30 days. Furthermore, WBN Unit 2 Surveillance Requirement (SR) 3.3.1 requires a monthly channel check be performed for the instrumentation in TS Table 3.3.4-1. SR 3.3.1 is performed in accordance with surveillance instruction (SI) 2-SI-0-4, Monthly Surveillances.
U.S. Nuclear Regulatory Commission CNL-18-006 Page 2 January 10, 2018 On December 30, 2017, while performing SI 2-SI-0-4, TVA identified that temperature indicator (TI) 2-TI-68-43C, Reactor Coolant Loop 3 Hot Leg Temperature Indicator, in the auxiliary control room (ACR) was inoperable. The problem has been isolated to either the temperature modifier circuit or the thermocouple, both of which are located inside the reactor building polar crane wall, which is not accessible during plant operation.
The 30-day completion time for Condition A of TS 3.3.4 expires on January 29, 2018, at 0343 eastern standard time (EST). After that expiration, TS 3.3.4, Condition B requires the plant to be in Mode 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Therefore, the proposed exigent license amendment request (LAR) requests NRC approval of a one-time change to WBN Unit 2 Technical Specification (TS) Table 3.3.4-1, Function 4a, "RCS Hot Leg Temperature Indication, to permit the temperature indication for reactor coolant system (RCS) Loop 3 to be inoperable for the remainder of the WBN Unit 2 Operating Cycle 2.
WBN Unit 2 is scheduled to start the Cycle 2 refueling outage in Spring 2019.
The new Note A to TS Table 3.3.4-1, Function 4a also states that if WBN Unit 2 enters Mode 3 or 4 prior to the Unit 2 Cycle 2 refueling outage, the temperature modifier will be replaced. If the problem is not with the temperature modifier, entry into Mode 5 would be required to replace the thermocouple. If the thermocouple requires replacement, this repair will be performed if Unit 2 enters a forced outage that requires entry into Mode 5 for other reasons. These repairs would occur prior to startup following a shutdown.
TVA requests approval of the TS change by January 28, 2018, and that the implementation of the revised TS be effective immediately to avoid an unnecessary operational transient to initiate a plant shutdown.
TI 2-TI-68-43C is one of four instruments that provide indication in the ACR of the hot leg temperature for each RCS loop. There is one indicator per loop. The hot leg indication for the other RCS hot legs remains operable. TVA has evaluated the opportunity to repair TI 2-TI-68-43C and concluded that the safety significance of operating with the Loop 3 hot leg temperature indication inoperable for the remainder of the cycle does not outweigh the potential consequences to personnel safety and the radiological doses required to effect the repair. Furthermore, the remaining RCS loop hot leg temperature indications available in the ACR are adequate to safely shutdown the unit should an emergency arise and maintain the unit in a safe shutdown condition. Based on the unanticipated failure of the instrumentation as discussed in further detail in Section 3.0 of the enclosure, TVA could not have reasonably avoided this exigency.
In addition, while this exigent LAR is being submitted as a deterministic LAR, TVA concluded that the risk of continued plant operation with the Loop 3 hot leg temperature indication function inoperable is qualitatively assessed to be very low compared to the incremental risks associated with an unnecessary operational transient to initiate a plant shutdown.
U.S. Nuclear Regulatory Commission CNL-18-006 Page 3 January 10, 2018 The enclosure to this letter provides a description of the proposed changes, technical evaluation of the proposed changes, regulatory evaluation, and a discussion of environmental considerations. Attachment 1 to the enclosure provides the existing WBN Unit 2 TS pages marked-up to show the proposed changes. Attachment 2 to the enclosure provides the proposed WBN Unit 2 TS pages retyped to show the changes incorporated. Attachment 3 to the enclosure provides a new WBN Unit 2 license condition regarding implementation of the compensatory measures described in Section 3.4 of the enclosure. Attachment 4 to the enclosure provides the WBN Unit 2 Operating License page retyped to show the changes incorporated.
The WBN Plant Operations Review Committee and TVA Nuclear Safety Review Board have reviewed this amendment request and concluded that operation of WBN Unit 2 in accordance with the proposed change will not endanger the health and safety of the public.
TVA has determined that there are no significant hazards considerations associated with the proposed change and that the TS change qualifies for a categorical exclusion from environmental review pursuant to the provisions of 10 CFR 51.22(c)(9). Additionally, in accordance with 10 CFR 50.91(b)(1), TVA is sending a copy of this letter and enclosure to the Tennessee State Department of Environment and Conservation.
This exigent TS change is similar to ones previously approved by the NRC for WBN Unit 1 in References 1 and 2. The inoperability of 2-TI-68-43C has been entered into the TVA Corrective Action Program (CAP). As part of the CAP, TVA will evaluate the cause of the failure to determine if there is any generic applicability to similar TVA TIs.
There are no new regulatory commitments associated with this submittal. Please address any questions regarding this request to Ed Schrull at 423-751-3850.
I declare under penalty of perjury that the foregoing is true and correct. Executed on this 10th day of January 2018.
Respectfully, Digitally signed by J. W. Shea J. W. Shea DN: cn=J. W. Shea, o=Tennessee Valley Authority, ou=Nuclear Licensing, email=jwshea@tva.gov, c=US Date: 2018.01.10 16:32:25 -05'00' J. W. Shea Vice President, Nuclear Regulatory Affairs and Support Services
Enclosure:
Evaluation of the Proposed Change cc: See Page 4
U.S. Nuclear Regulatory Commission CNL-18-006 Page 4 January 10, 2018 cc (Enclosure):
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Watts Bar Nuclear Plant NRC Project Manager - Watts Bar Nuclear Plant Director, Division of Radiological Health - Tennessee State Department of Environment and Conservation
Enclosure TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT, UNIT 2 EVALUATION OF PROPOSED CHANGE
Subject:
Watts Bar Nuclear Plant Unit 2 - Technical Specification Change -
Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01)
Contents 1.0 Summary Description ................................................................................................2 2.0 DETAILED DESCRIPTION........................................................................................3 2.1 Proposed Technical Specification Change and License Condition .......................... 3 2.2 Condition Intended to Resolve ................................................................................3 2.3 Justification for the Change.....................................................................................4
3.0 TECHNICAL EVALUATION
.......................................................................................5 3.1 System Description .................................................................................................6 3.1.1 Remote Shutdown System...............................................................................6 3.1.2. Repair Considerations .....................................................................................7 3.1.3 Personnel Safety - Working Conditions ............................................................ 7 3.1.4 Expected Radiological Dose for Performing the Repair .................................... 7 3.1.5 Risk Considerations .........................................................................................8 3.2 Technical Specification Change Evaluation ............................................................ 9 3.3 Additional Considerations ..................................................................................... 10 3.4 Additional Compensatory Measures ..................................................................... 10
4.0 REGULATORY EVALUATION
................................................................................ 11 4.1 Applicable Regulatory Requirements/Criteria ........................................................ 11 4.1.1 General Design Criteria ................................................................................. 11 4.2 Precedent .............................................................................................................12 4.3 Significant Hazards Consideration ........................................................................ 13 4.4 Conclusions ..........................................................................................................15
5.0 ENVIRONMENTAL CONSIDERATION
................................................................... 15
6.0 REFERENCES
........................................................................................................15 ATTACHMENTS
- 1. Proposed TS Changes (Mark-Ups) for WBN Unit 2
- 2. Proposed TS Changes (Final Typed) for WBN Unit 2
- 3. Proposed License Condition (Mark-Ups) for WBN Unit 2
- 4. Proposed License Condition (Final Typed) for WBN Unit 2 CNL-18-006 E1 of 15
Enclosure 1.0
SUMMARY
DESCRIPTION Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.90, "Application for amendment of license, construction permit, or early site permit," and 10 CFR 50.91(a)(6), Notice for public comment; State consultation, Tennessee Valley Authority (TVA) is requesting an exigent license amendment to amend the Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specifications (TS). The proposed exigent license amendment request (LAR) submits a one-time change to WBN Unit 2 TS Table 3.3.4-1, Function 4a, "RCS Hot Leg Temperature Indication, for Nuclear Regulatory Commission (NRC) approval. The proposed exigent LAR permits the temperature indication for reactor coolant system (RCS) Loop 3 to be inoperable for the remainder of the WBN Unit 2 Operating Cycle 2. WBN Unit 2 is scheduled to start the Cycle 2 refueling outage in Spring 2019.
WBN Unit 2 TS Table 3.3.4-1, Function 4a, requires at least one RCS hot leg temperature indication function per loop to be operable. With one or more required Functions inoperable, WBN Unit 2 TS 3.3.4, Remote Shutdown System, Condition A, requires the inoperable Function to be restored to operable status within 30 days. Furthermore, WBN Unit 2 Surveillance Requirement (SR) 3.3.1 requires a monthly channel check be performed for the instrumentation in TS Table 3.3.4-1.
SR 3.3.1 is performed in accordance with surveillance instruction (SI) 2-SI-0-4, Monthly Surveillances.
On December 30, 2017, while performing SI 2-SI-0-4, TVA identified that temperature indicator (TI) 2-TI-68-43C, Reactor Coolant Loop 3 Hot Leg Temperature Indicator, in the auxiliary control room (ACR) was inoperable. The 30-day completion time for Condition A of TS 3.3.4 expires on January 29, 2018, at 0343 eastern standard time (EST). After that expiration, TS 3.3.4, Condition B requires the plant to be in Mode 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
Accordingly, TVA requests approval of the TS change by January 28, 2018, and that the implementation of the revised TS be effective immediately to avoid an unnecessary operational transient to initiate a plant shutdown. TI 2-TI-68-43C is one of four instruments that provide indication in the ACR of the hot leg temperature for each RCS loop. There is one indicator per loop. The hot leg indication for the other RCS hot legs remains operable.
The problem has been isolated to either the temperature modifier circuit or the thermocouple, both of which are located inside the reactor building polar crane wall, which is not accessible during plant operation.
Accordingly, TVA is requesting this proposed TS change under exigent circumstances, and requests that the NRC expedite the review of the requested change to support approval by January 28, 2018.
The inoperability of 2-TI-68-43C has been entered into the TVA Corrective Action Program (CAP). As part of the CAP, TVA will evaluate the cause of the failure to determine if there is any generic applicability for similar TVA TIs.
CNL-18-006 E2 of 15
Enclosure 2.0 DETAILED DESCRIPTION 2.1 PROPOSED TECHNICAL SPECIFICATION CHANGE AND LICENSE CONDITION The proposed change adds (Refer to Note A on page 2 of 2) to the Required Number of Functions for WBN Unit 2 TS Table 3.3.4-1, "Remote Shutdown System Instrumentation and Controls," item 4.a, RCS Hot Leg Temperature Indication. The new Note A on new page 2 of WBN Unit 2 TS Table 3.3.4-1 states:
"For Function 4a, the temperature indicator for RCS hot leg 3 is not required to be operable for the remainder of Cycle 2. If WBN Unit 2 enters Mode 3 or 4 prior to the Unit 2 Cycle 2 refueling outage, the temperature modifier will be replaced. If the problem is not with the temperature modifier, entry into Mode 5 would be required to replace the thermocouple. If the thermocouple requires replacement, this repair will be performed if Unit 2 enters Mode 5.
These repairs would occur prior to startup following a shutdown.
Due to pagination as a result of adding the new Note A, WBN Unit 2 TS Table 3.3.4-1 now contains two pages.
TVA also proposes the addition of the following new license condition 2.C(11) to the operating license of WBN Unit 2:
TVA will implement the compensatory measures described in Section 3.4, Additional Compensatory Measures, of TVA letter CNL18-006, dated January 10, 2018, during the timeframe the temperature indicator for RCS hot leg 3 is not required to be operable for the remainder of Cycle 2. If the RCS hot leg 3 temperature indicator is returned to operable status prior to the end of Cycle 2, then these compensatory measures are no longer required.
Attachment 1 to this enclosure provides the existing WBN Unit 2 TS pages markedup to show the proposed changes. Attachment 2 to this enclosure provides the proposed WBN Unit 2 TS pages retyped to show the changes incorporated.
Attachment 3 to this enclosure the WBN Unit 2 Operating License page marked-up to show the proposed changes. Attachment 4 to this enclosure provides the WBN Unit 2 Operating License page retyped to show the changes incorporated.
There are no TS Bases changes associated with this proposed change.
2.2 CONDITION INTENDED TO RESOLVE The 30-day completion time for Condition A of TS 3.3.4 expires on January 29, 2018, at 0343 EST, which requires the plant to be in Mode 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and Mode 4 in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in accordance with TS 3.3.4, Condition B. The inoperable device (2-TI-68-43C) is one of four instruments that provides indication in the ACR for the hot leg temperature for each RCS loop. Both the modifier circuit and the thermocouple are located inside the reactor building polar crane wall and are not accessible during plant operation.
CNL-18-006 E3 of 15
Enclosure 2.3 JUSTIFICATION FOR THE CHANGE On December 30, 2017, while performing 2-SI-0-4, TVA identified that 2-TI-68-43C was inoperable. After performing troubleshooting, TVA determined that the problem has been isolated to either the temperature modifier circuit or the associated thermocouple, both of which are located inside the reactor building polar crane wall.
The modifier circuit is a module that converts the millivolt direct current (mVDC) output from the RCS T(hot) thermocouple to a milliampere direct current (mADC) signal to an indicator and recorder located in the ACR. The mVDC signal input ranges from -0.675 to 17.418; the module conditions the signal output range from 4 to 20 mADC.
The inoperable RCS T(hot) indicator is only displayed in the ACR. The indicator is not part of the reactor protection system (RPS) and does not provide input to any safety-related shutdown system. The only component adversely affected by the inoperable RCS T(hot) indicator is the corresponding recorder.
TVA has evaluated the plant conditions needed to perform the necessary repairs.
While the plant is operating, as discussed in more detail in Section 3.0 of this enclosure, the radiological conditions and environmental conditions inside this area would impose a significant challenge on plant staff attempting to repair the components. TVA has determined that the potential consequences to personnel safety and the radiological doses required to perform the repair outweigh the safety significance of operating with the Loop 3 hot leg temperature indication inoperable for the remainder of the operating cycle. In addition, the exigent LAR is being submitted as a deterministic LAR with risk insights using the WBN Probabilistic Risk Assessment (PRA). TVA concluded that the risk of continued plant operation with the Loop 3 hot leg temperature indication function inoperable is qualitatively assessed to be very low compared to the incremental risks associated with an unnecessary operational transient to initiate a plant shutdown.
As noted in Section 2.1 of this enclosure and contained in the Note to TS Table 3.3.4-1, if WBN Unit 2 enters Mode 3 or 4 prior to the Unit 2 Cycle 2 refueling outage, the temperature modifier will be replaced. If the problem is not with the temperature modifier, entry into Mode 5 would be required to replace the thermocouple. If the thermocouple requires replacement, this repair will be performed if Unit 2 enters a forced outage that requires entry into Mode 5 for other reasons. Both the modifier circuit and the thermocouple associated with this hot leg temperature indication are located inside the reactor building polar crane wall.
Therefore, the radiological environment is unacceptable for personnel entry with the unit at power. Accordingly, if the modifier circuit is the source of the loss of temperature indication, a unit shutdown to Mode 3 or 4 would be necessary to allow for replacement. If the thermocouple requires replacement, this maintenance will require a unit shutdown to Mode 5, because elevated RCS piping temperatures in Mode 3 or 4 would make such a replacement unsafe for personnel to perform without a Mode 5 entry. These repairs would occur prior to startup following a shutdown.
Additional information supporting this exigent LAR is provided in Section 3.0 of this Enclosure.
CNL-18-006 E4 of 15
Enclosure
3.0 TECHNICAL EVALUATION
TVA could not have reasonably anticipated the failure of TI 2-TI-68-43C. There was no adverse maintenance history concerning this component. A timeline is provided below.
x In March 2014, 2-TI-68-43C was replaced as part of refurbishment activities associated with the WBN Unit 2 initial startup.
x Between November 2015 and November 2017, 2-TI-68-43C successfully completed its monthly channel checks in accordance with 2-SI-0-4.
x On April 8, 2015, April 4, 2016, and November 13, 2017, 2-TI-68-43C successfully completed its 18-month channel calibration in accordance with 2-SI-68-62, 18 Month Calibration of Remote Shutdown Monitor RCS Loop 3 Hot Leg Temperature Loop 2-LPT-68-43C.
x On November 28, 2015, April 22, 2016, and December 3, 2017, 2-TI-68-43C also successfully completed its 18-month channel calibration in accordance with 2-SI-68-301, Cross Calibration of RCS Temperature Sensors Using RTD Cross Calculation-DAQ.
x On December 30, 2017, while performing 2-SI-0-4, 2-TI-68-43C in the ACR was observed to be offscale low.
x At 0343 on December 30, 2017, 2-TI-68-43C was declared inoperable and Condition A of TS 3.3.4 was entered with a 30-day completion time.
x After troubleshooting, TVA determined on January 4, 2018, that the cause of the failed TI was either the temperature modifier circuit or the associated thermocouple, which would necessitate a unit shutdown to either repair or replace the component.
The configuration of the affected instrumentation precludes repair at power because the affected equipment is located inside the reactor building polar crane wall, which is a high dose area during power operations.
Based on the information in Section 3.1 of this enclosure, a forced outage to repair or replace the temperature modifier circuit or the thermocouple associated with 2-TI-68-43C would result in an unnecessary transient to the unit.
The shutdown of the plant to implement the repairs is not necessary because the remaining RCS loop hot leg temperature indications available in the ACR are adequate to safely shutdown the unit should an emergency arise and maintain the unit in a safe shutdown condition.
WBN Unit 1 experienced a similar failure of the RCS Loop 4 hot leg instrument 1-TI-68-65C in 2015 (Reference 1). A failure analysis was not performed on the temperature modifier that was replaced. However, the WBN Unit 2 temperature modifier associated with 2-TI-68-43C is a different make and model than its corresponding Unit 1 temperature modifier.
CNL-18-006 E5 of 15
Enclosure 3.1 SYSTEM DESCRIPTION 3.1.1 Remote Shutdown System The remote shutdown system (RSS), also referred to as the auxiliary control system (ACS), provides the control room operator with sufficient instrumentation and controls to place and maintain the unit in a safe shutdown condition from a location other than the main control room (MCR). The ACS is required in the event that the MCR must be evacuated due to some unspecified reason, as well as during a control building fire that causes loss of safe shutdown control from the MCR. The RSS is not required to function for mitigation of any design basis event, other than the fire or evacuation of the MCR or a design basis flood. Portions of the ACS that terminate in the ACR are used during the design basis flood. The ACS meets two separate failure criteria.
- 1. During normal operation, equipment and controls are provided to ensure that a random single failure in the ACS does not affect the corresponding MCR equipment and controls. During MCR evacuation, no single failure of ACS equipment must be assumed per the WBN design.
- 2. ACS equipment and controls are assumed to be damaged if the equipment is not fire protected in the zone of influence of a fire. No equipment failures other than those directly attributed to a fire must be considered.
The most limiting condition for the events during which the ACS is required is a fire.
For a fire, procedures require that the reactor coolant pumps be tripped such that decay heat removal is via natural circulation. Section 7.4, "Safe Shutdown Systems," of NUREG-0800, "Standard Review Plan," establishes the review guidelines for the remote control stations and the equipment used to maintain safe shutdown. Consistent with these guidelines, TVA has developed a safe shutdown logic diagram for an Appendix R fire. This logic defines a sufficient set of equipment and indications to safely shutdown the reactor from the ACR. For each safety function, the equipment required to accomplish the safety function has been divided into groups of functionally related equipment necessary to accomplish the safety function. The RCS hot leg temperature indicators are required for assessment of decay heat removal. If Loop 3 temperature indication (T(hot)) is removed, success for this function can still be achieved via the remaining available ACS T(hot) indicators.
Redundancy for decay heat removal exists in these paths to account for equipment in one of the redundant paths being damaged by any fire in a single area. For the case addressed by this TS change, the fire must exist in the control building, which is considered a single area, to cause an evacuation of the MCR. Because the conduit, cables, and equipment that provide T(hot) indication in the ACR are routed outside the control building, removal of the Loop 3 T(hot) indication is acceptable due to the redundant paths not being affected by the control building fire. Because a redundant path for decay heat removal is required to remain functional by the TS for the remainder of Cycle 2, the ACS can adequately perform its function to place and maintain the unit in a safe shutdown condition in a location other than the MCR.
Therefore, the fire safe shutdown logic is met and adequate indication is present without Loop 3 T(hot) indication.
CNL-18-006 E6 of 15
Enclosure Design guidance for the ACS is provided in ANSI/ANS-58.6-1983, "Criteria for Remote Shutdown for Light Water Reactors." This guidance does not specifically state that RCS hot leg temperature indication is required for all four loops. Item 4(5) states that equipment, instrumentation and controls, which are required to monitor, achieve and maintain a hot shutdown condition (following power operation) shall be located in the Auxiliary Shutdown Station wherever practical. Item 4(5)(b) refers to decay heat removal as a minimum requirement for maintaining hot or cold shutdown and references the following to achieve the decay heat removal.
- i. Monitor SG parameters for residual heat removal.
ii. Control auxiliary feedwater (AFW) flow and monitor AFW supply inventory.
iii. Control steam relieving system.
WBN uses the RCS hot leg temperature indication for compliance with Item 4(5)(b).
3.1.2. Repair Considerations The problem has been isolated to either the temperature modifier circuit or the thermocouple, both of which are located inside the reactor building polar crane wall.
While the plant is operating, the radiological and environmental conditions inside this area as discussed in Sections 3.1.3 and 3.1.4 would impose a significant challenge on plant staff attempting to repair the components.
3.1.3 Personnel Safety - Working Conditions Based on operating experience and discussions with craft personnel, if TVA were to attempt to repair the components that are located inside the reactor building polar crane wall under current conditions, the time needed to complete the repairs would be approximately three hours. The environmental considerations include containment temperature, humidity, and required personnel protective equipment (PPE). Section 3.1.4 discusses the radiological effects associated with performing such a repair.
3.1.4 Expected Radiological Dose for Performing the Repair Tables 1 and 2 provide the dose estimates for the repair effort at various power levels. Neutron dose contributes approximately 10% of the estimated total dose when at 100% reactor power.
CNL-18-006 E7 of 15
Enclosure Table 1 Expected Radiological Dose per Person for Performing the Repair Reactor Power Level Task 100% 90% 75% 50% 25%
Inside Polar Crane Wall Entry Transit 165 132 88 66 33 (Entry/Egress 5 min / 5 min)
At Job Location*
Removal of Modifier (45 Min) 742 594 396 297 198 Installation of New Modifier (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />) 990 792 528 396 200 Calibration of Modifier (1.5 hour5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />) 1485 1188 792 594 300 Total (mrem) 3382 2706 1804 1353 731 Note: the dose values are in millirem
- This takes into account two inches of shielding from steel walls of the pressurizer relief tank.
Table 2 Total Dose for Individuals to Complete the Repairs at Various Power Levels Reactor Power Level Individuals 100% 90% 75% 50% 25%
Maintenance Technician #1 3382 2706 1804 1353 731 Maintenance Technician #2 3382 2706 1804 1353 731 RP Technician 3382 2706 1804 1353 731 RP Support Outside* 51 45 38 25 13 Locked High Radiation Area Door Watch* 51 45 38 25 13 Total (mrem) 10274 8208 5488 4109 2219 Note: the dose values are in millirem
- This takes into account five minutes for outside support to access the polar crane door and five minutes to secure the door.
3.1.5 Risk Considerations When redundant and diverse indications are available to provide necessary information to plant operators, the WBN PRA model does not generally model the loss of a single indication. In addition, the WBN model does not currently credit shutdown from outside of the MCR. Therefore, from a quantitative perspective as measured by the WBN PRA model, unavailability of one RCS loop hot leg temperature indication in the auxiliary control room does not increase risk.
Examining this issue qualitatively, the RCS loop hot leg temperature indication is used for assessment of decay heat removal via the associated SG. TI 2-TI-68-43C is one of several parameters used to assess decay heat removal via the SGs. The remaining indicators are sufficient that operators can ensure adequate decay heat removal. Therefore, the risk associated with this issue is negligible.
The WBN PRA model does not explicitly address risk associated with a downpower and return to full power. However, any significant plant maneuver increases the likelihood of complications, which could induce or require a plant trip. As a sensitivity CNL-18-006 E8 of 15
Enclosure calculation, the risk associated with a downpower was assumed to be equal to 10 percent (%) of the risk associated with a plant trip (%2 turbine trip initiating event TTIE)). Increasing PRA initiator %2 TTIE from 0.241/yr to 0.2651 results in a delta-core damage frequency (CDF) of about 8E-9. For an assumed (bounding) 18-month cycle, the incremental conditional core damage probability (ICCDP) would be approximately 1.2E-8. This results in a delta-large early release frequency (LERF) of about 1.1E-10. For an assumed (bounding) 18 month cycle, the incremental conditional large early release probability (ICLERP) would be approximately 1.7E-10.
TVA has determined that the safety effect of continued plant operation without the Loop 3 T(hot) indication is qualitatively assessed to be very low compared to the incremental risks associated with an unnecessary operational transient to initiate a plant shutdown. Large power maneuvers increase the likelihood of a transient that could initiate or require a plant trip or shutdown. Plant trips and shutdowns have the potential to challenge important safety systems such as the RPS, AFW, and the RHR systems. Each of those systems has a small probability of failure. Therefore, performing a significant plant downpower or shutdown to effect repairs results in a very small safety impact, versus essentially no safety impact associated with continued operation with the Loop 3 T(hot) indication unavailable. Therefore, continuing to operate with the Loop 3 T(hot) indication unavailable until the upcoming refueling outage is not adverse to plant safety.
3.2 TECHNICAL SPECIFICATION CHANGE EVALUATION The basis for continued operation with the RCS Loop 3 hot leg temperature indicator inoperable is acceptable because this parameter is only one of five parameters used to assess decay heat removal via the SGs. The other four parameters are RCS cold temperature indication, SG pressure, SG level, and AFW flow. The other parameters will be available in the ACR during the remainder of Cycle 2. Relaxing the requirement for one loop of T(hot) indication while maintaining the requirements for the remaining three loops of T(hot) indication, AFW Controls, SG pressure indication and control, SG level indication, AFW flow indication and SG T(sat) indication, will not adversely affect the unit's ability to monitor decay heat. If the operable three loops are consistent relative to T(hot), SG T(sat) and SG level, and the other parameters for the inoperable loop are not contradictory to plant conditions indicated by the operable loops (i.e., SG level and SG T(sat) for Loop 3), then it is reasonable to consider that Loop 3 is performing its function to remove decay heat via its SG.
T(hot) is also used to set the reactor cooldown rate during safe shutdown from a location other than the MCR. The absence of one out of the four T(hot) indications does not adversely affect this function because the other three operable indications may be used.
Abnormal Operating Instruction (AOI) 27, "Main Control Room Inaccessibility," and AOI-30.2.C.69, "Fire Safe Shutdown Room Control Building," are the procedures used for MCR abandonment for non-Appendix R and Appendix R fire conditions, respectively. AOI-27 and AOI-30.2 both require the unit to be tripped before the MCR is abandoned. The indication for the RCS Loop 3 hot leg is used in these procedures to monitor the plant cooldown rate in the ACR. The probability of having to abandon the MCR is low and remains the same, whether the plant continues to CNL-18-006 E9 of 15
Enclosure operate or is shut down. Therefore, the change proposed in this LAR is considered to be risk neutral with regard to initiating events.
The inoperable RCS Loop 3 hot leg temperature indication is only displayed in the ACR. It is not part of the RPS and does not provide input to any safety related shutdown system. The only component adversely affected by the inoperable RCS Loop 3 hot leg temperature indicator is the corresponding recorder. In addition, during a shutdown where the residual heat removal (RHR) system is activated to remove decay heat from the reactor, the plant operator can choose one of the remaining three loops (i.e., Loops 1, 2 or 4) to assess decay heat removal Therefore, the out of service temperature indicator has no effect on the safe operation and shutdown of the reactor.
3.3 ADDITIONAL CONSIDERATIONS If the temperature indicator for another RCS hot leg loop fails while the Loop 3 indicator is inoperable, TVA would evaluate the impact of the inoperable components in accordance with the TVA CAP. The evaluation would provide site management with the necessary information to decide if the unit must be shutdown to implement the needed repairs or whether adequate remote shutdown information is available to the operating staff for safe operation of the unit. TVA would conform to the applicable required actions of TS 3.3.4.
TVA conducts weekly walkdowns of safety-related areas within the control building to preclude introduction of new transient combustibles. The Fire Operations staff reviews the transient combustibles log to confirm that if new transient combustibles have been introduced into safety-related areas within the control building, they have been appropriately evaluated.
As noted in Section 3.2, in the event that any other ACR indication becomes unavailable, in addition to the RCS Loop 3 hot leg temperature indication (T(hot)),
control room operators could rely on the remaining Loop 1, 2 or 4 T(hot) indications to confirm natural circulation flow as well as cool down rates. If one of the other parameters becomes unavailable, plant operators could continue to monitor RCS cooldown rate by confirming the indicated values through channel check verifications.
3.4 ADDITIONAL COMPENSATORY MEASURES To ensure operating personnel are fully cognizant of the out-of-service instrument, WBN will take the following actions during the time the subject instrument is out of service.
- 1. Operating procedures affected by the inoperable instrument will be revised in accordance with established practice.
- 2. The inoperable instrument will be appropriately tagged.
- 3. The inoperable instrument will be incorporated in the re-qualification training and the required reading (i.e., Night Orders) for licensed operators.
CNL-18-006 E10 of 15
Enclosure The following will be implemented in addition to existing fire protection and operational program requirements.
- 1. Plant operations personnel will perform shiftly walkdowns of the control building to ensure new transient combustibles have been evaluated.
- 2. Operational and maintenance activities conducted within the safety-related areas of the control building that require hot work permits will be reviewed by a licensed operator to ensure unnecessary hot work is precluded, prior to commencement of the activity.
- 3. The power supplies for the other RCS hot leg temperature indicators are being protected to preclude loss of additional indication.
As noted in Section 2.1 of this enclosure, TVA has proposed a new license condition regarding implementation of the above compensatory measures.
4.0 REGULATORY EVALUATION
4.1 APPLICABLE REGULATORY REQUIREMENTS/CRITERIA The Bases for TS 3.3.4 states that the operability of the remote shutdown control and instrumentation functions ensures that there is sufficient information available on selected unit parameters to place and maintain the unit in Mode 3 should the MCR become inaccessible. Should it be necessary to go to Mode 4 or Mode 5, decay heat removal via the RHR system is available to support the transition.
4.1.1 General Design Criteria WBN was designed to meet the intent of the Proposed General Design Criteria for Nuclear Power Plant Construction Permits published in July 1967. The WBN construction permit was issued in January 1973. The WBN dual-unit updated final safety analysis report (UFSAR) address the NRC General Design Criteria (GDC) published as Appendix A to 10 CFR 50 in July 1971. Conformance with the GDC is described in Section 3.1.2 of the WBN dual-unit UFSAR.
The relevant GDC are described below Criterion 19 - Control Room A control room shall be provided from which actions can be taken to operate the nuclear power unit safely under normal conditions and to maintain it in a safe condition under accident conditions including loss of coolant accidents (LOCAs).
Adequate radiation protection shall be provided to permit access and occupancy of the control room under accident conditions without personnel receiving radiation exposures in excess of five rem whole body, or its equivalent to any part of the body, for the duration of the accident.
Equipment at appropriate locations outside the control room shall be provided (1) with a design capability for prompt hot shutdown of the reactor, including necessary instrumentation and controls to maintain the unit in a safe condition during hot shutdown, and (2) with a potential capability for subsequent cold shutdown of the reactor through the use of suitable procedures.
CNL-18-006 E11 of 15
Enclosure The ACS is required to provide equipment at appropriate locations outside the MCR with the capability to promptly shut down and maintain the unit in a safe condition in Mode 3. The criteria governing the design and specific system requirements of the ACS are located in GDC 19. WBN's compliance with GDC 19 is discussed in the dual-unit UFSAR Section 3.1.2.2, "Protection By Multiple Fission Product Barriers."
The instrumentation functions required for the ACR are discussed in Section 7.4, "Systems Required for Safe Shutdown," of the UFSAR.
4.2 PRECEDENT This exigent LAR is similar to the other exigent LARs approved by the NRC for WBN Unit 1 and the Catawba Nuclear Station as described further below.
x Watts Bar Unit 1 - Issuance of Exigent Amendment Regarding Application to Allow Temperature Indication for Reactor Coolant System Loop 3 to be Inoperable for the Remainder of Operating Cycle 13 (TAC No. MF6286), dated June 12, 2015 (Reference 1). This license amendment provided a one-time change to Function 4.a, Reactor Coolant System (RCS) Hot Leg Temperature Indication, of TS Table 3.3.4-1 to allow a WBN Unit 1 temperature indicator in the ACR for RCS Loop 4 to remain inoperable for the remainder of Operating Cycle 13 (approximately a three-month duration). The issues associated with the 2015 failure (failing low scale) were isolated to the modifier circuit that is a different make and model than the WBN Unit 2 modifier circuit.
x Watts Bar Unit 1 - Issuance of Exigent Technical Specification Amendment Concerning Inoperable Reactor Coolant System Temperature Indicator (TAC No. MC4979), dated November 19, 2004 (Reference 2). This license amendment provided a one-time change to Function 4.a of TS Table 3.3.4-1 to allow a WBN Unit 1 temperature indicator in the ACR for RCS Loop 4 to remain inoperable for the remainder of Operating Cycle 6 (approximately a four-month duration). The issues in the 2004 failure resulted in a full scale reading.
x Catawba Nuclear Station, Units 1 and 2 - Issuance of Amendments Regarding Exigent License Amendment Request to Revise Technical Specification 3.3.4, Remote Shutdown System (TAC Nos. MF3473 and MF3474), dated February 27, 2014 (Reference 3). This license amendment provided a one-time change to Function 3.b, Decay Heat Removal via Steam Generators (SGs) -
Reactor Coolant System (RCS) Cold Leg Temperature - Loop A and B, of TS Table 3.3.4-1 to allow a Unit 2 resistance temperature detector (RTD) for RCS Loop B to remain inoperable for the remainder of Operating Cycle 20 (approximately a 13-month duration).
CNL-18-006 E12 of 15
Enclosure 4.3 SIGNIFICANT HAZARDS CONSIDERATION Tennessee Valley Authority (TVA) proposes to revise the Watts Bar Nuclear Plant (WBN) Technical Specifications (TS) 3.3.4, Table 3.3.4-1, Function 4a, "RCS Hot Leg Temperature Indication," as follows:
The proposed change adds (Refer to Note A on page 2 of 2) to the Required Number of Functions for WBN Unit 2 TS Table 3.3.4-1, "Remote Shutdown System Instrumentation and Controls," item 4.a, RCS Hot Leg Temperature Indication. The new Note A on new page 2 of WBN Unit 2 TS Table 3.3.4-1 states:
"For Function 4a, the temperature indicator for RCS hot leg 3 is not required to be operable for the remainder of Cycle 2. If WBN Unit 2 enters Mode 3 or 4 prior to the Unit 2 Cycle 2 refueling outage, the temperature modifier will be replaced. If the problem is not with the temperature modifier, entry into Mode 5 would be required to replace the thermocouple. If the thermocouple requires replacement, this repair will be performed if Unit 2 enters Mode 5.
These repairs would occur prior to startup following a shutdown.
TVA has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below.
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The proposed TS change to allow operation with only three of four loop remote shutdown indications for RCS hot leg temperature until the Cycle 2 refueling outage is only applicable to the following conditions:
x fire or smoke in the main control room (MCR) x an evacuation of the MCR due to some other (non-fire) unspecified reason x the design basis flood The inoperability of the one T(hot) indicator does not change the probability of occurrence for these events because the indicator is not an accident initiator.
The T(hot) indicators on the four loops are used for indication only and have no automatic control functions. During safe shutdown for an MCR evacuation event, design basis flood or fire related event, no fuel damage is postulated to occur, nor is the integrity of the reactor coolant pressure boundary or containment barriers postulated to be lost. Sufficient redundancy exists with the operational instrumentation to ensure that decay heat removal functions are not adversely affected by this change. Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
CNL-18-006 E13 of 15
Enclosure
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed TS change does not alter the function of the remote shutdown system (RSS), which is to achieve and maintain safe reactor shutdown from outside the MCR. The TS instrumentation and controls required are such that sufficient capability is retained for decay heat removal via the steam generators (SGs) to provide the indication required for safe shutdown capabilities. The change does not result in the installation of any new equipment or system. The T(hot) instrument is used for indication only and has no automatic control functions. No new operations procedures are created by this change.
Appropriate operational procedures will be updated to clarify that the Loop 3 T(hot) indication in the auxiliary control room (ACR) is not available during the remainder of Cycle 2. No new operating conditions or modes are created by this proposed change. Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No.
The radiological dose consequences are not affected, because this change is only applicable to the following conditions.
x fire or smoke in the MCR x an evacuation of the MCR due to some other (non-fire) unspecified reason x the design basis flood During safe shutdown for an MCR evacuation event, design basis flood or fire related event, no fuel damage is postulated to occur, nor is the integrity of the reactor coolant pressure boundary or containment barriers postulated to be lost.
Sufficient redundancy exists with the operational instrumentation to ensure that decay heat removal functions are not adversely affected by this change.
Because the conduit, cables, and equipment that provide T(hot) indication in the ACR are routed outside the control building, removal of the Loop 3 T(hot) indication is acceptable due to the redundant paths not being affected by the control building fire. Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, TVA concludes that the proposed amendment does not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92(c),
and accordingly, a finding of "no significant hazards consideration" is justified.
CNL-18-006 E14 of 15
Enclosure
4.4 CONCLUSION
S In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
5.0 ENVIRONMENTAL CONSIDERATION
A review has determined that the proposed amendment would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20. However, the proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.
Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b),
no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
6.0 REFERENCES
- 1. NRC Letter to TVA, Watts Bar Unit 1 - Issuance of Exigent Amendment Regarding Application to Allow Temperature Indication for Reactor Coolant System Loop 3 to be Inoperable for the Remainder of Operating Cycle 13 (TAC No. MF6286), dated June 12, 2015 (ML15160A407)
- 2. NRC Letter to TVA, Watts Bar Unit 1 - Issuance of Exigent Technical Specification Amendment Concerning Inoperable Reactor Coolant System Temperature Indicator (TAC No. MC4979), dated November 19, 2004 (ML043140476)
- 3. NRC letter to Duke Energy Carolinas, LLC, Catawba Nuclear Station, Units 1 and 2 - Issuance of Amendments Regarding Exigent License Amendment Request to Revise Technical Specification 3.3.4, Remote Shutdown System (TAC Nos. MF3473 and MF3474), dated February 27, 2014 (ML14056A217)
CNL-18-006 E15 of 15
Enclosure 1 ATTACHMENT 1 Proposed TS Changes (Mark-Ups) for WBN Unit 2 CNL-18-006
Remote Shutdown System 3.3.4 Table 3.3.4-1 (page 1 of 12)
Remote Shutdown System Instrumentation and Controls FUNCTION/INSTRUMENT REQUIRED OR CONTROL PARAMETER NUMBER OF FUNCTIONS
- 1. Reactivity Control
- a. Source Range Neutron Flux 1
- b. Reactor Trip Breaker Position Indication 1 per trip breaker
- 2. Reactor Coolant System (RCS) Pressure Control
- a. Pressurizer Pressure Indication 1 or RCS Wide Range Pressure Indication
- b. Pressurizer Power Operated Relief Valve (PORV) Control and 1 each per relief path Pressurizer Block Valve Control
- c. Pressurizer Heater Control 1
- 3. RCS Inventory Control
- a. Pressurizer Level Indication 1
- b. Charging and Letdown Flow Control and Indication 1
- 4. Decay Heat Removal via Steam Generators (SGs)
- a. RCS Hot Leg Temperature Indication 1 per loop (Refer to Note A on page 2 of 2)
- b. AFW Controls 1
- c. SG Pressure Indication and Control 1 per SG
- d. SG Level Indication 1 per SG and AFW Flow Indication
- e. SG Tsat Indication 1 per SG
- 5. Decay Heat Removal via RHR System
- a. RHR Flow Control 1
- b. RHR Temperature Indication 1 Watts Bar - Unit 2 3.3-50 Amendment XX
Remote Shutdown System 3.3.4 Table 3.3.4-1 (page 2 of 2)
Remote Shutdown System Instrumentation and Controls Note:
A. For Function 4a, the temperature indicator for RCS hot leg 3 is not required to be operable for the remainder of Cycle 2. If WBN Unit 2 enters Mode 3 or 4 prior to the Unit 2 Cycle 2 refueling outage, the temperature modifier will be replaced. If the problem is not with the temperature modifier, entry into Mode 5 would be required to replace the thermocouple. If the thermocouple requires replacement, this repair will be performed if Unit 2 enters Mode 5. These repairs would occur prior to startup following a shutdown.
Watts Bar - Unit 2 3.3-50a Amendment XX
Enclosure 1 ATTACHMENT 2 Proposed TS Changes (Final Typed) for WBN Unit 2 CNL-18-006
Remote Shutdown System 3.3.4 Table 3.3.4-1 (page 1 of 2)
Remote Shutdown System Instrumentation and Controls FUNCTION/INSTRUMENT REQUIRED OR CONTROL PARAMETER NUMBER OF FUNCTIONS
- 1. Reactivity Control
- a. Source Range Neutron Flux 1
- b. Reactor Trip Breaker Position Indication 1 per trip breaker
- 2. Reactor Coolant System (RCS) Pressure Control
- a. Pressurizer Pressure Indication 1 or RCS Wide Range Pressure Indication
- b. Pressurizer Power Operated Relief Valve (PORV) Control and 1 each per relief path Pressurizer Block Valve Control
- c. Pressurizer Heater Control 1
- 3. RCS Inventory Control
- a. Pressurizer Level Indication 1
- b. Charging and Letdown Flow Control and Indication 1
- 4. Decay Heat Removal via Steam Generators (SGs)
- a. RCS Hot Leg Temperature Indication 1 per loop (Refer to Note A on page 2 of 2)
- b. AFW Controls 1
- c. SG Pressure Indication and Control 1 per SG
- d. SG Level Indication 1 per SG and AFW Flow Indication
- e. SG Tsat Indication 1 per SG
- 5. Decay Heat Removal via RHR System
- a. RHR Flow Control 1
- b. RHR Temperature Indication 1 Watts Bar - Unit 2 3.3-50 Amendment XX
Remote Shutdown System 3.3.4 Table 3.3.4-1 (page 2 of 2)
Remote Shutdown System Instrumentation and Controls Note:
A. For Function 4a, the temperature indicator for RCS hot leg 3 is not required to be operable for the remainder of Cycle 2. If WBN Unit 2 enters Mode 3 or 4 prior to the Unit 2 Cycle 2 refueling outage, the temperature modifier will be replaced. If the problem is not with the temperature modifier, entry into Mode 5 would be required to replace the thermocouple. If the thermocouple requires replacement, this repair will be performed if Unit 2 enters Mode 5. These repairs would occur prior to startup following a shutdown.
Watts Bar - Unit 2 3.3-50a Amendment XX
Enclosure 1 ATTACHMENT 3 Proposed License Condition (Mark-Ups) for WBN Unit 2 CNL-18-006
TVA may make changes to the approved fire protection program without prior approval of the Commission, only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
(9) By May 31, 2018, TVA shall report that a listing organization acceptable to the NRG (as the Authority Having Jurisdiction) has determined that the fire detection monitoring panel in the main control room either meets the appropriate designated standards or has been tested and found suitable for the specified purpose.
(10) TVA will verify for each core reload that the actions taken if FQW(Z) is not within limits will assure that the limits on core power peaking FQ(Z) remain below the initial total peaking factor assumed in the accident analyses.
(11) TVA will implement the compensatory measures described in Section 3.4, Additional Compensatory Measures, of TVA letter CNL18-006, dated January 10, 2018, during the timeframe the temperature indicator for RCS hot leg 3 is not required to be operable for the remainder of Cycle 2.
If the RCS hot leg 3 temperature indicator is returned to operable status prior to the end of Cycle 2, then these compensatory measures are no longer required.
D. The licensee shall have and maintain financial protection of such types and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
F. This license is effective as of the date of issuance and shall expire at midnight on October 21, 2055.
FOR THE NUCLEAR REGULATORY COMMISSION William M. Dean, Director Office of Nuclear Reactor Regulation Appendices: 1. Appendix A -
Technical Specifications
- 2. Appendix B -
Environmental Protection Plan Date of Issuance: October 22, 2015
Enclosure 1 ATTACHMENT 4 Proposed License Condition (Final Typed) for WBN Unit 2 CNL-18-006
TVA may make changes to the approved fire protection program without prior approval of the Commission, only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
(9) By May 31, 2018, TVA shall report that a listing organization acceptable to the NRG (as the Authority Having Jurisdiction) has determined that the fire detection monitoring panel in the main control room either meets the appropriate designated standards or has been tested and found suitable for the specified purpose.
(10) TVA will verify for each core reload that the actions taken if FQW(Z) is not within limits will assure that the limits on core power peaking FQ(Z) remain below the initial total peaking factor assumed in the accident analyses.
(11) TVA will implement the compensatory measures described in Section 3.4, Additional Compensatory Measures, of TVA letter CNL18-006, dated January 10, 2018, during the timeframe the temperature indicator for RCS hot leg 3 is not required to be operable for the remainder of Cycle 2. If the RCS hot leg 3 temperature indicator is returned to operable status prior to the end of Cycle 2, then these compensatory measures are no longer required.
D. The licensee shall have and maintain financial protection of such types and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
F. This license is effective as of the date of issuance and shall expire at midnight on October 21, 2055.
FOR THE NUCLEAR REGULATORY COMMISSION William M. Dean, Director Office of Nuclear Reactor Regulation Appendices: 1. Appendix A -
Technical Specifications
- 2. Appendix B -
Environmental Protection Plan Date of Issuance: October 22, 2015