 Issue dateTitleTopic
CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)18 December 2023Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)Safe Shutdown
Anticipated operational occurrence
WBL-23-052, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual8 November 2023Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements ManualSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Offsite Dose Calculation Manual
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Missed surveillance
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Process Control Program
Earthquake
Power Operated Valves
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Grace period
Unidentified leakage
Power Uprate
Measurement Uncertainty Recapture
CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-20 September 2023Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03Coatings
Surveillance Frequency Control Program
Fuel cladding
CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2 August 2023Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)Coatings
Surveillance Frequency Control Program
Fuel cladding
CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)28 June 2023Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)Safe Shutdown
Hydrostatic
Surveillance Frequency Control Program
Offsite Circuit
ML23122A2327 June 2023Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs)Cyber Security
Surveillance Frequency Control Program
Fire Protection Program
CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche20 March 2023Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu
CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)13 June 2022and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)Time of Discovery
Incorporated by reference
Missed surveillance
WBL-22-026, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual11 May 2022Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements ManualSafe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Anticipated operational occurrence
Post Accident Monitoring
Nondestructive Examination
Qualified Offsite Circuit
FLEX
Missed surveillance
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Process Control Program
Offsite Circuit
Grace period
Power change
ML20273A04329 September 2020Plants Unit 1 and 2 - Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual
CNL-20-008, Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28)27 July 2020Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28)Unanalyzed Condition
Anticipated operational occurrence
Hydrostatic
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
CNL-20-016, Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23)22 June 2020Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23)Reactor Vessel Water Level
Anticipated operational occurrence
Post Accident Monitoring
CNL-20-004, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01)17 January 2020Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01)Open Phase Condition
CNL-19-051, Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology17 January 2020Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis MethodologyReactor Vessel Water Level
Loop seal
Coatings
Cyber Security
Finite Element Analysis
Fuel cladding
Fire Protection Program
CNL-19-097, Non-Voluntary License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values (TS-19-22)23 October 2019Non-Voluntary License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values (TS-19-22)
CNL-19-105, Supplemental Response to Second-Round NRC Request for Additional Information Regarding Application to Revise Technical Specifications Regarding DC Electrical Systems TSTF-500, Revision 2 (WBN-TS-18-09)10 October 2019Supplemental Response to Second-Round NRC Request for Additional Information Regarding Application to Revise Technical Specifications Regarding DC Electrical Systems TSTF-500, Revision 2 (WBN-TS-18-09)
L-19-023, Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual19 March 2019Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements ManualSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Offsite Dose Calculation Manual
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Missed surveillance
Pressure and Temperature Limits Report
Process Control Program
Fuel cladding
Offsite Circuit
Grace period
Coast down
CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays19 November 2018Revised Application to Modify the Technical Specifications for Unbalanced Voltage RelaysSafe Shutdown
Anticipated operational occurrence
Surveillance Frequency Control Program
Offsite Circuit
CNL-18-006, Technical Specification Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01)10 January 2018Technical Specification Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01)Safe Shutdown
Probabilistic Risk Assessment
Locked High Radiation Area
Fire Protection Program
Power change
CNL-17-149, Revised Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025)27 December 2017Revised Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025)Shutdown Margin
ML17321A03316 November 2017Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025)Shutdown Margin
ML17306A8022 November 2017Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements ManualSafe Shutdown
Boric Acid
Time of Discovery
Shutdown Margin
Ultimate heat sink
Offsite Dose Calculation Manual
Anticipated operational occurrence
Post Accident Monitoring
Qualified Offsite Circuit
FLEX
Missed surveillance
Pressure and Temperature Limits Report
Process Control Program
Offsite Circuit
Grace period
NL-17-128, Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23)11 October 2017Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23)
CNL-17-128, Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23)11 October 2017Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23)Anticipated operational occurrence
Fuel cladding
CNL-17-123, Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025)29 September 2017Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025)Boric Acid
Shutdown Margin
Anticipated operational occurrence
Fuel cladding
CNL-17-044, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (Abgts), for Watts Bar Nuclear Plant, Units 1 and 25 May 2017Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (Abgts), for Watts Bar Nuclear Plant, Units 1 and 2Safe Shutdown
Unanalyzed Condition
CNL-17-022, Application to Modify Technical Specification 5.7.2.19 Regarding One-Time Extension of 10 CFR 50, Appendix J Type C Local Leakage Rate Tests (391-WBN-TS-17-05)16 February 2017Application to Modify Technical Specification 5.7.2.19 Regarding One-Time Extension of 10 CFR 50, Appendix J Type C Local Leakage Rate Tests (391-WBN-TS-17-05)Stroke time
Exemption Request
ML16113A07722 April 2016Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements ManualSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Offsite Dose Calculation Manual
Anticipated operational occurrence
Post Accident Monitoring
Qualified Offsite Circuit
Missed surveillance
Pressure and Temperature Limits Report
Process Control Program
Offsite Circuit
Grace period
CNL-15-060, Technical Specifications Change No. WBN2-TS-15-16 - Revise Technical Specifications for Use of Steam Generator Alternate Repair Criterion F15 December 2015Technical Specifications Change No. WBN2-TS-15-16 - Revise Technical Specifications for Use of Steam Generator Alternate Repair Criterion FAnticipated operational occurrence
Post Accident Monitoring
Nondestructive Examination
Finite Element Analysis
ML15267A18323 September 2015Watts Bar, Unit 2 - Submittal of Final Revision 0 of the Technical Specifications & Technical Specification Bases, and Final Revision 0 of the Technical Requirements Manual & Technical Requirements Manual Bases
NL-15-181, Watts Bar Unit 1, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mod3 September 2015Watts Bar Unit 1, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - ModeBoric Acid
Ultimate heat sink
CNL-15-181, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 43 September 2015Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 4Boric Acid
Ultimate heat sink
CNL-15-133, Response to Request for Additional Information Related to Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08)15 July 2015Response to Request for Additional Information Related to Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08)Boric Acid
Stroke time
CNL-15-088, Application to Revise Technical Specifications for Component Cooling Water Snd Essential Raw Cooling Water to Support Dual Unit Operation (TS-WBN-15-13)17 June 2015Application to Revise Technical Specifications for Component Cooling Water Snd Essential Raw Cooling Water to Support Dual Unit Operation (TS-WBN-15-13)Safe Shutdown
Ultimate heat sink
Offsite Circuit
CNL-14-218, Application to Modify Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08)6 April 2015Application to Modify Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08)Safe Shutdown
Boric Acid
Stroke time
Anticipated operational occurrence
Offsite Circuit
CNL-15-001, Application to Revise Technical Specification 4.2.1, Fuel Assemblies, (WBN-TS-15-03)31 March 2015Application to Revise Technical Specification 4.2.1, Fuel Assemblies, (WBN-TS-15-03)Boric Acid
Shutdown Margin
Offsite Dose Calculation Manual
Anticipated operational occurrence
Tritium
CNL-14-217, Responses to Requests for Additional Information - Developmental Revision I Technical Specification Sections 3.8 and 5.75 March 2015Responses to Requests for Additional Information - Developmental Revision I Technical Specification Sections 3.8 and 5.7Safe Shutdown
Battery sizing
Offsite Circuit
Backfit
CNL-14-180, Technical Specification Sections 3.0 and 3.10.122 January 2015Technical Specification Sections 3.0 and 3.10.1Safe Shutdown
ML14307A9813 November 2014Periodic Submission for Changes Made to Technical Specification Bases and Technical Requirement ManualBoric Acid
Shutdown Margin
Ultimate heat sink
Offsite Dose Calculation Manual
Missed surveillance
Pressure and Temperature Limits Report
Process Control Program
Grace period
ML14170A04416 June 2014Attachment 5 - WBN Unit 2 TS and Tsb Through Developmental Revision I, and Trm and Trmb Through Developmental Revision D
ML14170A04516 June 2014Attachment 1 - TS Developmental Revision I Changes (Mark-Up) for WBN Unit 2Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Offsite Dose Calculation Manual
Post Accident Monitoring
Hydrostatic
Nondestructive Examination
Pressure and Temperature Limits Report
Annual Radiological Environmental Operating Report
Process Control Program
Pressure Boundary Leakage
Offsite Circuit
Fire Protection Program
Power change
Unidentified leakage
ML14170A04616 June 2014Attachment 2 - TS Bases Developmental Revision I Changes (Mark-Up) for WBN Unit 2
ML13357A05112 December 2013Synopsis of Revisions Included in Watts Bar Unit 2 Developmental Revision H of Technical Specifications and Technical Specification Bases. Part 2 of 2Safe Shutdown
Anticipated operational occurrence
Battery sizing
Fuel cladding
ML13357A05412 December 2013Technical Specifications Bases
ML13353A47812 December 2013Fuel Handling Accident Dose Analysis Final Safety Analysis Report and Technical Specification RevisionSafe Shutdown Earthquake
ML12333A24220 November 2012Application to Modify Technical Specification 4.3.1, Criticality, (WBN-TS-12-03)
ML12333A24019 November 2012Unit I, Application to Modify Technical Specification 3.7.10, Control Room Emergency Ventilation System (WBN-TS-12-01)Safe Shutdown
ML12240A22423 August 2012Update to Technical Requirements Manual (TRM) Bases Section 3.7.2, Developmental Revision BPressure and Temperature Limits Report
ML12065A03528 February 2012Watts Bar, Unit 2 - Technical Specifications Table of Contents Through Page B 3.9-32
ML12065A03628 February 2012Submittal of Developmental Revision G of the Unit 2 Technical Specification (TS) and Technical Specification BasesSafe Shutdown
Post Accident Monitoring
Nondestructive Examination
Emergency Lighting
Pressure Boundary Leakage