ML14170A044
From kanterella
Jump to navigation
Jump to search
ML14170A044 | |
Person / Time | |
---|---|
Site: | Watts Bar |
Issue date: | 06/16/2014 |
From: | Tennessee Valley Authority |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML14170A054 | List: |
References | |
Download: ML14170A044 (1447) | |
Similar Documents at Watts Bar | |
---|---|
Category:Manual
MONTHYEARWBL-22-026, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual2022-05-11011 May 2022
[Table view]Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual ML20273A0432020-09-29029 September 2020 Plants Unit 1 and 2 - Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual L-19-023, Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual2019-03-19019 March 2019 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual ML17306A8022017-11-0202 November 2017 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual CNL-15-177, Submittal of Replacement Pages for Developmental and Final Revision J of the Technical Specification & Technical Specification Bases, and Developmental and Final Revision E of Technical Requirements Manual & Technical Manual.2015-09-0404 September 2015 Submittal of Replacement Pages for Developmental and Final Revision J of the Technical Specification & Technical Specification Bases, and Developmental and Final Revision E of Technical Requirements Manual & Technical Manual. NL-15-177, Watts Bar, Unit 2, Submittal of Replacement Pages for Developmental and Final Revision J of the Technical Specification & Technical Specification Bases, and Developmental and Final Revision E of Technical Requirements Manual & Technical Ma2015-09-0404 September 2015 Watts Bar, Unit 2, Submittal of Replacement Pages for Developmental and Final Revision J of the Technical Specification & Technical Specification Bases, and Developmental and Final Revision E of Technical Requirements Manual & Technical Man CNL-14-197, Two-Unit Offsite Dose Calculation Manual, Revision 02014-11-21021 November 2014 Two-Unit Offsite Dose Calculation Manual, Revision 0 ML14325A8052014-11-21021 November 2014 Two-Unit Offsite Dose Calculation Manual, Revision 0 ML14307A9812014-11-0303 November 2014 Periodic Submission for Changes Made to Technical Specification Bases and Technical Requirement Manual ML14170A0422014-06-16016 June 2014 Attachment 3 - TRM Developmental Revision D Changes (Mark-Up) for WBN Unit 2 ML14170A0442014-06-16016 June 2014 Attachment 5 - WBN Unit 2 TS and Tsb Through Developmental Revision I, and Trm and Trmb Through Developmental Revision D ML14170A0432014-06-16016 June 2014 Attachment 4 - TRM Bases Developmental Revision D Changes (Mark-Up) for WBN Unit 2 ML13091A0372013-03-26026 March 2013 Submittal of Pre-op Test Instructions for Condenser Vacuum and Flood Mode Boration ML12311A1512012-10-31031 October 2012 Draft Two-Unit Offsite Dose Calculation Manual (ODCM) ML11325A3222011-11-16016 November 2011 Changes Made to the Technical Requirements Manual ML11257A0512011-07-31031 July 2011 Attachment 11, WCAP-17458-NP, Revision 0, Wincise Signal Processing System Cabinet Operation & Maintenance Manual, and Attachment 12, Application for Withholding Proprietary Information from Public Disclosure ML1011210872010-04-20020 April 2010 Changes Made to the Technical Requirements Manual ML1005506372010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual Bases B 3.1 - Reactivity Control Systems ML1005506502010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual Bases B 3.9 - Refueling Operations ML1005506492010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual Bases B 3.8 - Electrical Power Systems ML1005506442010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual Bases B 3.7 - Plant Systems ML1005506412010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual Bases B 3.6 - Containment Systems ML1005506402010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual Bases B 3.4 - Reactor Coolant System ML1005506392010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual Bases B 3.3- Instrumentation ML1005506362010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual Bases B 3.0 - Technical Requirement (TR) and Technical Surveillance Requirement (Tsr) Applicability ML1005506342010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual 5.0 - Administrative Controls ML1005506302010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual TR 3.9 - Refueling Operations ML1005506292010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual TR 3.8 - Electrical Power Systems ML1005506262010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual TR 3.7 - Plant Systems ML1005506242010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual TR 3.6 - Containment Systems ML1005506232010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual TR 3.4 - Reactor Coolant System (RCS) ML1005506212010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual TR 3.3 - Instrumentation ML1005506202010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual TR 3.1 - Reactivity Control Systems ML1005506162010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual 3.0 - Technical Requirement (TR) Applicability ML1005506122010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual 1.0 - Use and Application ML1005506082010-02-0202 February 2010 Developmental Revision B - Technical Requirements Manual - Table of Contents ML11126A1812010-01-26026 January 2010 Offsite Dose Calculation Manual, Effluent and Waste Disposal Annual Report - 2010, Attachment 3 ML12124A2172010-01-26026 January 2010 Attachment 3, Offsite Dose Calculation Manual Revision 23 (No Revisions in 2011) ML0712300842006-08-18018 August 2006 2006 Effluent and Waste Disposal Annual Report, Attachment 3.0 Offsite Dose Calculation Manual, Rev 18 ML0526402732005-09-16016 September 2005 Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual ML0612202592005-08-19019 August 2005 2005 Watts Bar Nuclear Plant Effluent and Waste Disposal Annual Report, Attachment 3 to Enclosure 1 Offsite Dose Calculation Manual ML0512506262004-10-19019 October 2004 Attachment 3.0, Watts Bar, Offsite Dose Calculation Manual, Revision 13 2022-05-11 Category:Technical Specification MONTHYEARCNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024
[Table view]Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) WBL-23-052, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual2023-11-0808 November 2023 Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu CNL-22-008, And Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 And Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) WBL-22-026, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual2022-05-11011 May 2022 Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual ML20273A0432020-09-29029 September 2020 Plants Unit 1 and 2 - Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual CNL-20-008, Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28)2020-07-27027 July 2020 Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28) CNL-20-016, Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23)2020-06-22022 June 2020 Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23) CNL-20-004, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01)2020-01-17017 January 2020 Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01) CNL-19-051, Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology2020-01-17017 January 2020 Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology CNL-19-097, Non-Voluntary License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values (TS-19-22)2019-10-23023 October 2019 Non-Voluntary License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values (TS-19-22) CNL-19-105, Supplemental Response to Second-Round NRC Request for Additional Information Regarding Application to Revise Technical Specifications Regarding DC Electrical Systems TSTF-500, Revision 2 (WBN-TS-18-09)2019-10-10010 October 2019 Supplemental Response to Second-Round NRC Request for Additional Information Regarding Application to Revise Technical Specifications Regarding DC Electrical Systems TSTF-500, Revision 2 (WBN-TS-18-09) L-19-023, Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual2019-03-19019 March 2019 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays CNL-18-006, Technical Specification Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01)2018-01-10010 January 2018 Technical Specification Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01) CNL-17-149, Revised Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025)2017-12-27027 December 2017 Revised Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025) ML17321A0332017-11-16016 November 2017 Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025) ML17306A8022017-11-0202 November 2017 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual NL-17-128, Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23)2017-10-11011 October 2017 Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23) CNL-17-128, Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23)2017-10-11011 October 2017 Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23) CNL-17-123, Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025)2017-09-29029 September 2017 Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025) CNL-17-044, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (Abgts), for Watts Bar Nuclear Plant, Units 1 and 22017-05-0505 May 2017 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (Abgts), for Watts Bar Nuclear Plant, Units 1 and 2 CNL-17-022, Application to Modify Technical Specification 5.7.2.19 Regarding One-Time Extension of 10 CFR 50, Appendix J Type C Local Leakage Rate Tests (391-WBN-TS-17-05)2017-02-16016 February 2017 Application to Modify Technical Specification 5.7.2.19 Regarding One-Time Extension of 10 CFR 50, Appendix J Type C Local Leakage Rate Tests (391-WBN-TS-17-05) ML16113A0772016-04-22022 April 2016 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual CNL-15-060, Technical Specifications Change No. WBN2-TS-15-16 - Revise Technical Specifications for Use of Steam Generator Alternate Repair Criterion F2015-12-15015 December 2015 Technical Specifications Change No. WBN2-TS-15-16 - Revise Technical Specifications for Use of Steam Generator Alternate Repair Criterion F ML15267A1832015-09-23023 September 2015 Watts Bar, Unit 2 - Submittal of Final Revision 0 of the Technical Specifications & Technical Specification Bases, and Final Revision 0 of the Technical Requirements Manual & Technical Requirements Manual Bases NL-15-181, Watts Bar Unit 1, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mod2015-09-0303 September 2015 Watts Bar Unit 1, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode CNL-15-181, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 42015-09-0303 September 2015 Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 4 CNL-15-133, Response to Request for Additional Information Related to Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08)2015-07-15015 July 2015 Response to Request for Additional Information Related to Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08) CNL-15-088, Application to Revise Technical Specifications for Component Cooling Water Snd Essential Raw Cooling Water to Support Dual Unit Operation (TS-WBN-15-13)2015-06-17017 June 2015 Application to Revise Technical Specifications for Component Cooling Water Snd Essential Raw Cooling Water to Support Dual Unit Operation (TS-WBN-15-13) CNL-14-218, Application to Modify Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08)2015-04-0606 April 2015 Application to Modify Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08) CNL-15-001, Application to Revise Technical Specification 4.2.1, Fuel Assemblies, (WBN-TS-15-03)2015-03-31031 March 2015 Application to Revise Technical Specification 4.2.1, Fuel Assemblies, (WBN-TS-15-03) CNL-14-217, Responses to Requests for Additional Information - Developmental Revision I Technical Specification Sections 3.8 and 5.72015-03-0505 March 2015 Responses to Requests for Additional Information - Developmental Revision I Technical Specification Sections 3.8 and 5.7 CNL-14-180, Technical Specification Sections 3.0 and 3.10.12015-01-22022 January 2015 Technical Specification Sections 3.0 and 3.10.1 ML14307A9812014-11-0303 November 2014 Periodic Submission for Changes Made to Technical Specification Bases and Technical Requirement Manual ML14170A0442014-06-16016 June 2014 Attachment 5 - WBN Unit 2 TS and Tsb Through Developmental Revision I, and Trm and Trmb Through Developmental Revision D ML14170A0452014-06-16016 June 2014 Attachment 1 - TS Developmental Revision I Changes (Mark-Up) for WBN Unit 2 ML14170A0462014-06-16016 June 2014 Attachment 2 - TS Bases Developmental Revision I Changes (Mark-Up) for WBN Unit 2 ML13357A0542013-12-12012 December 2013 Technical Specifications Bases ML13357A0512013-12-12012 December 2013 Synopsis of Revisions Included in Watts Bar Unit 2 Developmental Revision H of Technical Specifications and Technical Specification Bases. Part 2 of 2 ML13353A4782013-12-12012 December 2013 Fuel Handling Accident Dose Analysis Final Safety Analysis Report and Technical Specification Revision ML12333A2422012-11-20020 November 2012 Application to Modify Technical Specification 4.3.1, Criticality, (WBN-TS-12-03) ML12333A2402012-11-19019 November 2012 Unit I, Application to Modify Technical Specification 3.7.10, Control Room Emergency Ventilation System (WBN-TS-12-01) ML12240A2242012-08-23023 August 2012 Update to Technical Requirements Manual (TRM) Bases Section 3.7.2, Developmental Revision B ML12065A0362012-02-28028 February 2012 Submittal of Developmental Revision G of the Unit 2 Technical Specification (TS) and Technical Specification Bases 2024-04-04 Category:Amendment MONTHYEARCNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024
[Table view]Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu CNL-22-008, And Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 And Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-20-008, Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28)2020-07-27027 July 2020 Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28) CNL-20-016, Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23)2020-06-22022 June 2020 Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23) CNL-20-004, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01)2020-01-17017 January 2020 Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01) CNL-19-097, Non-Voluntary License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values (TS-19-22)2019-10-23023 October 2019 Non-Voluntary License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values (TS-19-22) CNL-19-105, Supplemental Response to Second-Round NRC Request for Additional Information Regarding Application to Revise Technical Specifications Regarding DC Electrical Systems TSTF-500, Revision 2 (WBN-TS-18-09)2019-10-10010 October 2019 Supplemental Response to Second-Round NRC Request for Additional Information Regarding Application to Revise Technical Specifications Regarding DC Electrical Systems TSTF-500, Revision 2 (WBN-TS-18-09) CNL-17-149, Revised Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025)2017-12-27027 December 2017 Revised Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025) ML17321A0332017-11-16016 November 2017 Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025) CNL-17-128, Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23)2017-10-11011 October 2017 Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23) NL-17-128, Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23)2017-10-11011 October 2017 Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23) CNL-17-123, Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025)2017-09-29029 September 2017 Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025) CNL-17-044, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (Abgts), for Watts Bar Nuclear Plant, Units 1 and 22017-05-0505 May 2017 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (Abgts), for Watts Bar Nuclear Plant, Units 1 and 2 CNL-15-133, Response to Request for Additional Information Related to Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08)2015-07-15015 July 2015 Response to Request for Additional Information Related to Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08) CNL-15-088, Application to Revise Technical Specifications for Component Cooling Water Snd Essential Raw Cooling Water to Support Dual Unit Operation (TS-WBN-15-13)2015-06-17017 June 2015 Application to Revise Technical Specifications for Component Cooling Water Snd Essential Raw Cooling Water to Support Dual Unit Operation (TS-WBN-15-13) CNL-14-218, Application to Modify Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08)2015-04-0606 April 2015 Application to Modify Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08) CNL-15-001, Application to Revise Technical Specification 4.2.1, Fuel Assemblies, (WBN-TS-15-03)2015-03-31031 March 2015 Application to Revise Technical Specification 4.2.1, Fuel Assemblies, (WBN-TS-15-03) ML14170A0462014-06-16016 June 2014 Attachment 2 - TS Bases Developmental Revision I Changes (Mark-Up) for WBN Unit 2 ML14170A0452014-06-16016 June 2014 Attachment 1 - TS Developmental Revision I Changes (Mark-Up) for WBN Unit 2 ML14170A0442014-06-16016 June 2014 Attachment 5 - WBN Unit 2 TS and Tsb Through Developmental Revision I, and Trm and Trmb Through Developmental Revision D ML11228A0472011-08-10010 August 2011 Technical Specifications (Developmental Revision F), Enclosure 1 ML1022900752010-08-16016 August 2010 Unit 2 - Change to Developmental TS Section 4.2.2, Control Rod Assemblies ML1005504472010-02-0202 February 2010 Developmental Revision B - Technical Specifications 3.0 - Limiting Condition for Operation (LCO) Applicability ML1005503672010-02-0202 February 2010 Developmental Revision B - Technical Specifications Table of Contents ML1005504012010-02-0202 February 2010 Developmental Revision B - Technical Specifications 1.0 - Use and Application ML1005504412010-02-0202 February 2010 Developmental Revision B - Technical Specifications 2.0 - Safety Limits ML1005504742010-02-0202 February 2010 Developmental Revision B - Technical Specifications 5.0 - Administrative Controls ML1005504492010-02-0202 February 2010 Developmental Revision B - Technical Specifications 3.1 - Reactivity Control Systems ML1005504712010-02-0202 February 2010 Developmental Revision B - Technical Specifications 4.0 - Design Features ML1005504642010-02-0202 February 2010 Developmental Revision B - Technical Specifications 3.9 - Refueling Operations ML1005504502010-02-0202 February 2010 Developmental Revision B - Technical Specifications 3.2 - Power Distribution Limits ML1005504512010-02-0202 February 2010 Developmental Revision B - Technical Specifications 3.3 - Instrumentation ML1005504532010-02-0202 February 2010 Developmental Revision B - Technical Specifications 3.4 - Reactor Coolant System ML1005504562010-02-0202 February 2010 Developmental Revision B - Technical Specifications 3.5 - Emergency Core Cooling Systems ML1005504582010-02-0202 February 2010 Developmental Revision B - Technical Specifications 3.6 - Containment Systems ML1005504622010-02-0202 February 2010 Developmental Revision B - Technical Specifications 3.8 - Electrical Power Systems ML1005504612010-02-0202 February 2010 Developmental Revision B - Technical Specifications 3.7 - Plant Systems ML0929503402009-10-20020 October 2009 License Amendment Request for Adoption of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 - Browns Ferry TS Change 469; Sequoyah Change 09-04; and Watts Change 09-19 ML0913205622009-04-30030 April 2009 Application for Technical Specification Change to Correct Minor Error in Amendment 70 ML0900900442008-12-31031 December 2008 Revised Technical Specifications Change WBN-TS-08-04 - Revision to the Maximum Number of TPBARS That Can Be Irradiated in the Reactor Core Per Cycle ML0831708612008-11-12012 November 2008 License Amendment Request TS-08-11 to Revise Reactor Coolant System Leakage Detection Systems - Exigent Change Request ML0712106042007-04-25025 April 2007 (WBN) Unit 1 - Technical Specification Change 07-01, Revision of Number of Tritium Producing Burnable Absorber Rods (TPBARS) in the Reactor Core ML0616502672006-06-12012 June 2006 Technical Specifications (TS) Change WBN-TS-05-10 - Application for Technical Specification Improvement Regarding Steam Generator Tube Integrity - Request for Additional Information ML0526500612005-09-20020 September 2005 T.S. for License Amendment, Regarding Alternative Means for Monitoring Control or Shutdown Rod Position 2024-04-04 |
Retrieved from "https://kanterella.com/w/index.php?title=ML14170A044&oldid=406215"