Category:Letter
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML24008A2462024-01-18018 January 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000390/20234412023-12-21021 December 2023 Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-Public CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) IR 05000390/20234042023-12-14014 December 2023 Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404 CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control IR 05000390/20230102023-11-30030 November 2023 RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent Violation CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20230032023-11-13013 November 2023 Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation ML23312A1432023-11-0808 November 2023 Submittal of Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 5 CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23251A2002023-09-11011 September 2023 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Units 1 and 2 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds IR 05000390/20230022023-08-16016 August 2023 Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002 ML23220A1582023-08-0909 August 2023 Integrated Inspection Report 05000390/2023002 and 05000391/2023002 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills IR 05000390/20230112023-07-24024 July 2023 Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011 CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out IR 05000390/20234032023-05-30030 May 2023 Cyber Security Inspection Report 05000390/2023403 and 05000391/2023403 ML23131A1812023-05-23023 May 2023 Correction to Amendment No. 161 to Facility Operating License No. NPF-90 CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20220032023-05-0909 May 2023 Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003 ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) IR 05000390/20230012023-05-0404 May 2023 Integrated Inspection Report 05000390/2023001 and 05000391/2023001 CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23073A2762023-04-0303 April 2023 Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (EPID L-2023-LLA-0029) (Letter) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report 2024-01-09
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) ML23131A1812023-05-23023 May 2023 Correction to Amendment No. 161 to Facility Operating License No. NPF-90 ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22271A9142022-12-0707 December 2022 Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level Scheme ML22257A0512022-11-0404 November 2022 Issuance of Amendment Nos. 156 and 64 Regarding Adoption of TSTF-205-A, Revision 3, and TSTF-563-A ML22276A1612022-10-24024 October 2022 Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22187A0192022-09-20020 September 2022 Issuance of Amendment No. 154 Regarding Revision to Technical Specification 3.3.2 to Revise Allowable Value for Trip of Turbine-Driven Main Feedwater Pumps ML22187A1812022-09-20020 September 2022 Issuance of Amendment Nos. 153 and 62 Regarding Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water Train ML22014A2062022-05-0404 May 2022 Issuance of Amendment Nos. 152 and 61 Regarding Revision to Technical Specifications to Delete a Redundant Unit of Measure for Certain Radiation Monitors ML21347A9672022-02-0101 February 2022 Correction of Errors Incurred During Issuance of the Initial Facility Operating License, and Issuance of License Amendment Nos. 6, 21, and 39 ML21306A2872022-01-25025 January 2022 Issuance of Amendment No. 60 Regarding Revision of Technical Specification Requirements Specific to the Model D3 Steam Generators That Will No Longer Apply Following Steam Generator Replacement ML21334A2952022-01-18018 January 2022 Issuance of Amendment No. 151 Regarding Revision to TS 3.7.12 for One-Time Exception to Permit Continuous Opening of Auxiliary Building Secondary Containment Enclosure During Unit 2 Steam Generator Replacement ML21334A3892022-01-12012 January 2022 Issuance of Amendment No. 59 Regarding Revision to Steam Generator Tube Rupture Dose Analysis ML21271A1372021-12-16016 December 2021 Issuance of Amendment Nos. 150 and 58 Regarding Modification of Technical Specification Surveillance Requirement 3.6.15.4, Shield Building ML21260A2102021-11-22022 November 2021 Issuance of Amendment No. 57 to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level ML21189A3072021-11-0303 November 2021 Issuance of Amendment Nos. 149 and 56 Regarding Modification of Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program ML21158A2842021-09-17017 September 2021 Issuance of Amendment Nos. 148 and 55 to Revise Technical Specifications for Function 6.E of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation ML21153A0492021-07-26026 July 2021 Issuance of Amendment No. 147 Regarding Change to Steam Generator Tube Inspection Frequency and Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-510 ML21161A2392021-06-24024 June 2021 Issuance of Amendment No. 54 Regarding Use of Temperature Adjustment to Voltage Growth Rate for the Generic Letter 95-05 Steam Generator Tube Repair Criteria ML21148A1002021-06-17017 June 2021 Issuance of Amendment No. 53 Regarding Neutron Fluence Calculation Methodology ML21099A2462021-05-14014 May 2021 Issuance of Amendment Nos. 146 and 52 to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML21078A4842021-05-0505 May 2021 Issuance of Amendment Nos. 145 and 51 for One-Time Change to Technical Specification 3.7.11 to Extend the Completion Time for Main Control Room Chiller Modifications ML21015A0342021-03-0909 March 2021 Issuance of Amendment No. 144 Regarding Post Accident Monitoring Instrumentation ML21034A1692021-02-26026 February 2021 Issuance of Amendment Nos. 143 and 50 Regarding Implementation of Full Spectrumtm Loss-of-Coolant Accident Analysis (LOCA) and New LOCA-Specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology ML20232C6222021-02-11011 February 2021 Issuance of Amendment Nos. 142 and 49 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications (EPID L-2020-LLA-0037 ML21027A1672021-02-0909 February 2021 Issuance of Amendment No. 48 Regarding Use of Alternate Probability of Detection Values for Beginning of Cycle in Support of Operational Assessment ML20350B4932021-01-25025 January 2021 Issuance of Amendment Nos. 352, 346, 141, and 47 Regarding the Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML21005A1252021-01-12012 January 2021 Correction of Errors Incurred During Issuance of License Amendment Nos. 43 and 45 ML20268A0822021-01-12012 January 2021 Issuance of Amendment Nos. 314, 337, and 297; 351 and 345; 140 and 46 Regarding Changes to the Technical Specifications ML20245E4132020-12-0808 December 2020 Issuance of Amendment Nos. 139 and 45 Regarding Revisions to Technical Specification 3.6.15, Shield Building ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML20239A7912020-10-28028 October 2020 Issuance of Amendment Nos. 137 and 43 Regarding Revision to Technical Specifications to Adopt Technical Specification Task Force Traveler 541, Revision 2 ML20226A4442020-10-21021 October 2020 Issuance of Amendment No. 42 Regarding Measurement Uncertainty Recapture Power Uprate ML20238C0612020-09-21021 September 2020 Correction of Typographical Error Incurred During Issuance of License Amendment No. 104 ML20167A1482020-08-19019 August 2020 Issuance of Amendment Nos. 136 and 41 Regarding the Automatic Transfer from a Unit Service Station Transformer to a Common Station Service Transformer ML20156A0182020-08-10010 August 2020 Issuance of Amendment No. 40 Regarding Technical Specifications for Steam Generator Tube Repair Sleeve ML20076A1942020-04-30030 April 2020 Issuance of Amendment Nos. 134 and 38 Regarding Adopting the Title 10 CFR Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Plants ML20057E2422020-03-30030 March 2020 Issuance of Amendment Nos. 133 and 37 Regarding Changes to Technical Specifications Pertaining to Diesel Generator Start Instrumentation (EPID-L-2020-LLA-0003) ML20028F7332020-02-28028 February 2020 Issuance of Amendment Nos. 132 and 36 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-425, Revision 3 ML20024F8352020-02-24024 February 2020 Issuance of Amendment No. 35 Regarding One-Time Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water Train ML20015A4792020-01-30030 January 2020 Correction to Amendment No. 30 to Facility Operating License Npf-96 Regarding Use of Optimized Zirlo Fuel Rod Cladding ML19336C5192019-12-10010 December 2019 Issuance of Amendment Nos. 131 and 34 Regarding Correction to Unbalanced Voltage Relay Instrumentation Values ML19276E5572019-12-0909 December 2019 Issuance of Amendment Nos. 130 and 33 Regarding Adoption of Technical Specifications Task Force Traveler, TSTF-500, DC Electrical Rewrite - Update to TSTF-360 ML19238A0052019-11-26026 November 2019 Issuance of Amendment Nos. 129 and 32 Regarding Changes to Technical Specifications 3.8.1, 3.8.7, 3.8.8, and 3.8.9 ML18277A1102019-08-27027 August 2019 Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection 2024-01-29
[Table view] Category:Safety Evaluation
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23048A3042023-03-0808 March 2023 Tennessee Valley Authority - Request for Relief from Requirements of ASME Boiler and Pressure Vessel Code Regarding Weld Examination Coverage (EPID L-2022-LLR-0045,-0046,-0047) ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22271A9142022-12-0707 December 2022 Issuance of Amendment Nos. 324, 347, and 307; 360 and 354; 157 and 65 Regarding a Revision to the Emergency Action Level Scheme ML22293A4082022-11-14014 November 2022 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML22257A0512022-11-0404 November 2022 Issuance of Amendment Nos. 156 and 64 Regarding Adoption of TSTF-205-A, Revision 3, and TSTF-563-A ML22276A1612022-10-24024 October 2022 Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22272A5682022-10-12012 October 2022 Authorization of Alternatives to Certain Inservice Testing Requirements in the American Society of Mechanical Engineers Operating and Maintenance Code ML22187A0192022-09-20020 September 2022 Issuance of Amendment No. 154 Regarding Revision to Technical Specification 3.3.2 to Revise Allowable Value for Trip of Turbine-Driven Main Feedwater Pumps ML22187A1812022-09-20020 September 2022 Issuance of Amendment Nos. 153 and 62 Regarding Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water Train ML22014A2062022-05-0404 May 2022 Issuance of Amendment Nos. 152 and 61 Regarding Revision to Technical Specifications to Delete a Redundant Unit of Measure for Certain Radiation Monitors ML22084A0012022-04-0505 April 2022 Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Units 1 and 2, Review of Quality Assurance Plan Changes ML22070A0022022-03-28028 March 2022 Review of the Fall 2021 Mid Cycle Generic Letter 95-05 Voltage-Based Alternate Repair Criteria Report ML21306A2872022-01-25025 January 2022 Issuance of Amendment No. 60 Regarding Revision of Technical Specification Requirements Specific to the Model D3 Steam Generators That Will No Longer Apply Following Steam Generator Replacement ML21334A2952022-01-18018 January 2022 Issuance of Amendment No. 151 Regarding Revision to TS 3.7.12 for One-Time Exception to Permit Continuous Opening of Auxiliary Building Secondary Containment Enclosure During Unit 2 Steam Generator Replacement ML21334A3892022-01-12012 January 2022 Issuance of Amendment No. 59 Regarding Revision to Steam Generator Tube Rupture Dose Analysis ML21271A1372021-12-16016 December 2021 Issuance of Amendment Nos. 150 and 58 Regarding Modification of Technical Specification Surveillance Requirement 3.6.15.4, Shield Building ML21260A2102021-11-22022 November 2021 Issuance of Amendment No. 57 to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level ML21189A3072021-11-0303 November 2021 Issuance of Amendment Nos. 149 and 56 Regarding Modification of Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program ML21158A2842021-09-17017 September 2021 Issuance of Amendment Nos. 148 and 55 to Revise Technical Specifications for Function 6.E of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation ML21153A0492021-07-26026 July 2021 Issuance of Amendment No. 147 Regarding Change to Steam Generator Tube Inspection Frequency and Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-510 ML21161A2392021-06-24024 June 2021 Issuance of Amendment No. 54 Regarding Use of Temperature Adjustment to Voltage Growth Rate for the Generic Letter 95-05 Steam Generator Tube Repair Criteria ML21148A1002021-06-17017 June 2021 Issuance of Amendment No. 53 Regarding Neutron Fluence Calculation Methodology ML21099A2462021-05-14014 May 2021 Issuance of Amendment Nos. 146 and 52 to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML21130A6012021-05-13013 May 2021 Correction of Proposed Alternative IST-RR-8 to the Requirements of the ASME OM Code for the Residual Heat Removal Pump 1B-B ML21078A4842021-05-0505 May 2021 Issuance of Amendment Nos. 145 and 51 for One-Time Change to Technical Specification 3.7.11 to Extend the Completion Time for Main Control Room Chiller Modifications ML21110A0372021-04-29029 April 2021 Proposed Alternative IST-RR-8 to the Requirements of the ASME OM Code for the Residual Heat Removal Pump 1B-B ML21064A4082021-03-10010 March 2021 Correction of Safety Evaluation for License Amendment Nos. 143 and 50 (EPID L-2020-LLA-0005) (Non-Proprietary) ML21015A0342021-03-0909 March 2021 Issuance of Amendment No. 144 Regarding Post Accident Monitoring Instrumentation ML21034A1692021-02-26026 February 2021 Issuance of Amendment Nos. 143 and 50 Regarding Implementation of Full Spectrumtm Loss-of-Coolant Accident Analysis (LOCA) and New LOCA-Specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology ML20232C6222021-02-11011 February 2021 Issuance of Amendment Nos. 142 and 49 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications (EPID L-2020-LLA-0037 ML21027A1672021-02-0909 February 2021 Issuance of Amendment No. 48 Regarding Use of Alternate Probability of Detection Values for Beginning of Cycle in Support of Operational Assessment ML20350B4932021-01-25025 January 2021 Issuance of Amendment Nos. 352, 346, 141, and 47 Regarding the Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML20268A0822021-01-12012 January 2021 Issuance of Amendment Nos. 314, 337, and 297; 351 and 345; 140 and 46 Regarding Changes to the Technical Specifications ML20245E4132020-12-0808 December 2020 Issuance of Amendment Nos. 139 and 45 Regarding Revisions to Technical Specification 3.6.15, Shield Building ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML20239A7912020-10-28028 October 2020 Issuance of Amendment Nos. 137 and 43 Regarding Revision to Technical Specifications to Adopt Technical Specification Task Force Traveler 541, Revision 2 ML20226A4442020-10-21021 October 2020 Issuance of Amendment No. 42 Regarding Measurement Uncertainty Recapture Power Uprate ML20167A1482020-08-19019 August 2020 Issuance of Amendment Nos. 136 and 41 Regarding the Automatic Transfer from a Unit Service Station Transformer to a Common Station Service Transformer ML20156A0182020-08-10010 August 2020 Issuance of Amendment No. 40 Regarding Technical Specifications for Steam Generator Tube Repair Sleeve ML20076A1942020-04-30030 April 2020 Issuance of Amendment Nos. 134 and 38 Regarding Adopting the Title 10 CFR Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Plants ML20057E2422020-03-30030 March 2020 Issuance of Amendment Nos. 133 and 37 Regarding Changes to Technical Specifications Pertaining to Diesel Generator Start Instrumentation (EPID-L-2020-LLA-0003) ML20028F7332020-02-28028 February 2020 Issuance of Amendment Nos. 132 and 36 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-425, Revision 3 ML20024F8352020-02-24024 February 2020 Issuance of Amendment No. 35 Regarding One-Time Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water Train ML19336C5192019-12-10010 December 2019 Issuance of Amendment Nos. 131 and 34 Regarding Correction to Unbalanced Voltage Relay Instrumentation Values 2024-01-29
[Table view] |
Text
November 19, 2004 Mr. Karl W. Singer Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Streeet Chattanooga, TN 37402-2801
SUBJECT:
WATTS BAR UNIT 1 - ISSUANCE OF EXIGENT TECHNICAL SPECIFICATION AMENDMENT CONCERNING INOPERABLE REACTOR COOLANT SYSTEM TEMPERATURE INDICATOR (TAC NO. MC4979)
Dear Mr. Singer:
The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 53 to Facility Operating License No. NPF-90 for Watts Bar Nuclear Plant, Unit 1. This amendment consists of a one-time change to the Technical Specifications (TSs) in response to Tennessee Valley Authoritys application dated October 29, 2004, as supplemented by a letter dated November 5, 2004. Pursuant to Title 10, Code of Federal Regulations, Section 50.91(a)(6), you requested that your application be processed as an exigent TS amendment.
This amendment provides a one-time change to Function 4a, Reactor Coolant System (RCS)
Hot Leg Temperature Indication, of TS Table 3.3.4-1. Specifically, this amendment allows the Loop 4 RCS hot leg temperature indicator in the Auxiliary Control Room to be inoperable for the remainder of Cycle 6, which is scheduled to end at the conclusion of the spring 2005 refueling outage.
A copy of our safety evaluation is also enclosed. Notice of Issuance will be included in the Commission's next biweekly Federal Register notice.
Sincerely,
/RA/
Chandu P. Patel, Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-390
Enclosures:
- 1. Amendment No. 53 to License No. NPF-90
- 2. Safety Evaluation cc w/encls: See next page
ML043140476 NRR-058 OFFICE PDII-2/PM PDII-2/LA SPLB/SC EEIB/SC OGC PDII-2/SC NAME CPatel BClayton SWeerakkody EMarinos GLango MMarshall DATE 11/15/04 10/15/04 Input dated NLO subject to noted 11/18/04 11/8/04 11/10/04 comments 11/12/04 TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-390 WATT BAR NUCLEAR PLANT UNIT NO. 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 53 Renewed License No. NPF-90
- 1. The Nuclear Regulatory Commission (the Commission or the NRC) has found that:
A. The application for amendment by Tennessee Valley Authority (the licensee) dated October 28, 2004, as supplemented by a letter dated November 5, 2004, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-90 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 53, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented immediately upon receipt.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Michael L. Marshall, Jr., Chief, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: November 19, 2004
ATTACHMENT TO LICENSE AMENDMENT NO. 53 FACILITY OPERATING LICENSE NO. NPF-90 DOCKET NO. 50-390 Replace the following page of the Appendix A, Technical Specifications, with the attached revised page as indicated. The revised page is identified by amendment number and contains marginal lines indicating the area of change.
Remove Page Insert Page 3.3-48 3.3-48
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 53 TO RENEWED FACILITY OPERATING LICENSE NO. NPF-90 TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT, UNIT NO. 1 DOCKET NO. 50-390
1.0 INTRODUCTION
On October 21, 2004, the Tennessee Valley Authority (TVA), the licensee for Watts Bar Nuclear Plant (WBN), Unit 1 discovered that Temperature Indicator 1-TI-68-65C was inoperable. This instrument provided indication of the reactor coolant system (RCS) Loop 4 hot leg temperature.
The WBN Technical Specification (TS) 3.3.4, Remote Shutdown System Action A, requires the RCS hot leg temperature indication be restored in 30 days, or the plant must be shut down in accordance with Action B of TS 3.3.4. The affected instrument is located in an area accessible only during plant shutdown due to high radiological conditions. Due to the minimal safety effect of this out-of-service instrument and an operational transient following a plant shut down, the licensee did not see the justification of shutting down the plant to commence the repairs.
Therefore, pursuant to Title 10, Code of Federal Regulations (10 CFR) Section 50.90 and 10 CFR 50.91(a)(6), the licensee requested an Exigent TS change on October 29, 2004. The licensee supplemented its request by the letter dated November 5, 2004, which is clarifying in nature, is within the scope of the original request, and does not change the proposed no significant hazards determination. The one-time change would permit continuing operation for the remainder of the Cycle 6. The next scheduled outage is in spring 2005.
Specifically, the licensee requested that the following footnote be added to Function 4a,"RCS Hot Leg Temperature Indication in Table 3.3.4-1 of TS 3.3.4 :
For Function 4a, the temperature indicator for RCS hot leg 4 is not required to be operable for the remainder of Cycle 6.
2.0 REGULATORY EVALUATION
2.1 10 CFR Part 50, Appendix A, General Design Criterion (GDC) 34, Residual Heat Removal This GDC requires a residual heat removal system with suitable redundancy be provided to accomplish its intended safety function.
WBN Unit 1 is a four-loop Westinghouse pressurized-water reactor. Each loop is equipped with instrumentation to measure the hot leg and cold leg temperatures, respectively. Each hot legs fluid temperature is measured by three resistance temperature detectors (RTD) mounted 1200
apart at a representative point in the hot leg. The three-temperature readings are averaged and signals are then processed by a microprocessor-based system called the Eagle-21. Eagle-21 and its associated signal transmission lines/sensing elements are all part of the Reactor Protection System (RPS) to trip the reactor in the event of a temperature excursion exceeding the safe design limits. These systems have been previously reviewed by the Nuclear Regulatory Commission (NRC) (see references 1 and 2).
2.2 10 CFR Part 50, Appendix A, General Design Criterion GDC 19, Control Room This GDC requires, in part, that a control room capable of meeting personnel protection levels set forth in the regulation be provided. From the control room actions can then be taken to operate the plant under normal conditions and maintain it safely under accident conditions.
The WBN Main Control Room (MCR) is the location from which the licensee monitors the overall plant conditions. In the event of an MCR evacuation due to an emergency (e.g, fire or smoke), plant conditions can be monitored from an alternative location, the Auxiliary Control Room (ACR). Safe shutdown has been previously reviewed by the NRC (see Sections 3.2 and 3.3 of reference 4).
2.3 10 CFR 50.48, Fire Protection and 10 CFR Part 50, Appendix R, Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979" As required by 10 CFR Part 50.48(a), each operating nuclear power must plant have a fire protection plan which satisfies Criterion 3 of Appendix A to Part 50. As stated in 10 CFR 50.48(b) nuclear power plants licensed to operate prior to January 1, 1979, are required to implement Section III.G of Appendix R. For plants licensed after January 1, 1979, the applicable requirements were incorporated into the operating license for the facility. The licensees fire protection program has been previously reviewed by the NRC (see reference 4).
3.0 TECHNICAL EVALUATION
3.1 10 CFR Part 50, Appendix A, GDC 34, Residual Heat Removal The WBN Unit 1 TS 3.3.4, Remote Shutdown System, Action A requires the RCS hot leg temperature indication be restored in 30 days if one or more is found inoperable. Otherwise, the plant must be shut down in accordance with the timeframe prescribed in Action B of TS 3.3.4.
As stated in the October 29, 2004, letter, the hot leg temperature indicators on the four loops are not safety-related equipment. Per TVAs letter dated November 5, 2004, the licensee confirmed that the affected instrument only displayed RCS Loop 4 temperature readings in the ACR. It is not part of the RPS and does not provide input to any safety related shut down system (e.g., over-temperature )T confidence logic (see reference 3). The licensee further stated that the only component adversely impacted by the inoperable Loop 4 hot leg temperature indicator was the corresponding strip chart recorder.
Additionally, during a shutdown where the Residual Heat Removal system is activated to remove decay heat from the reactor, the plant operator could choose one of the remaining three loops (Loops 1 through 3) to achieve the intended goal. Therefore, the out-of-service temperature indicator has no impact on the safe operation and shutdown of the reactor.
3.2 10 CFR Part 50, Appendix A, GDC 19, Control Room The overall operating conditions can be monitored from the MCR without this out-of-service temperature indicator. In the event of an MCR evacuation (e.g., fire/smoke in the MCR), the plant conditions during a safe shutdown mode can be inferred from other indicators (e.g., steam generator level/pressure/saturated temperature, etc.), which are observable from the ACR.
Unlike the RCS Loop 4 hot leg temperature indication, these other indicators are located in areas where repairs can readily be made should they become inoperable. In addition, as stated in the licensees October 29, 2004, letter, sufficient redundancy exists to provide indications in the ACR to carry out the safe shutdown without the inoperable temperature indication. Hence, the absence of RCS Loop 4 hot leg temperature indication in the ACR will not interfere with safe shutdown of the plant.
3.3 10 CFR 50.48, Fire Protection and 10 CFR Part 50, Appendix R, Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979 WBN Unit 1 was granted its operating license on February 7, 1996. Therefore, its ability to meet 10 CFR Appendix R requirements (e.g., III.G Fire Protection of Safe Shutdown Capability) has been incorporated into the operating license. As concluded in Section 7 of reference 4, NRC found the licensees fire protection program to be acceptable. The inoperable temperature indicator has no impact on the licensees fire protection program.
Finally, to ensure operating personnel are fully cognizant of the out-of-service instrument, the licensee indicated that it plans to take the following actions, per TVAs letter dated November 05, 2004, during the time the subject instrument is out of service:
- 1. All operating procedures impacted by the inoperable instrument will be revised in accordance with the licensees established practice,
- 2. The inoperable instrument will be appropriately tagged,
- 3. The inoperable instrument will be incorporated into the re-qualification training and the required reading (i.e., Night Orders) for licensed operators, and
- 4. The inoperable instrument will be tracked by the Limiting Condition for Operation Tracking process.
4.0 STATEMENT OF EXIGENT CIRCUMSTANCES The Commission's regulation, as stated in 10 CFR 50.91, provides special exceptions for the issuance of amendments when the usual 30-day public notice cannot be met. One type of special exception is an exigency. An exigency exists when the staff and the licensee need to act quickly and time does not permit the staff to publish a Federal Register notice allowing 30 days for prior public comment, and the staff also determines that the amendment involves no significant hazards consideration. In accordance with 10 CFR 50.91(a)(6)(i)(A), the staff issued a Federal Register notice providing an opportunity for hearing and allowing at least 2 weeks from the date of the notice for prior public comment on November 5, 2004 (69 FR 64596). No comments were received.
In its submittal, the licensee discussed the need for an exigent review of the proposed license amendment. This request was submitted on an exigent basis as a result of the unanticipated failure of temperature indicator (TI) 1-TI-68-65C that provides indication in the ACR for the hot
leg temperature of RCS Loop 4. Upon discovery of this condition, TVA entered Action A of TS 3.3.4. The 30-day allowed outage time for Action A of TS 3.3.4 will expire on November 20, 2004, at approximately 2:27 p.m. EST. Based on the actions taken, the problem most likely exists in the instrumentation (transmitter or thermocouple) located within the Reactor Buildings Polar Crane Wall. While the plant is operating, the radiological conditions in this area prohibit access by plant personnel. Therefore, the repairs can not be safely implemented until the unit is shut down. If the proposed amendment is not granted, TS 3.3.4 would require that the plant be shut down by November 20, 2004, as repairs to the Loop 4 temperature indicator cannot be made while operating. The shutdown of the plant would result in an unnecessary operational transient since the indication parameters that remain available in the ACR are adequate to safely shut down the plant should an emergency arise.
On the basis of the above discussion, the NRC staff has determined that exigent circumstances exist and that the licensee used its best efforts to make a timely application and did not cause the exigent situation.
5.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Tennessee State official was notified of the proposed issuance of the amendment. The State official had no comments.
6.0 FINAL NO SIGNIFICANT HAZARDS CONSIDERATION
DETERMINATION The Commission's regulations in 10 CFR 50.92 state that the Commission may make a final determination that a license amendment involves no significant hazards consideration if operation of the facility, in accordance with the amendment, would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated, or (2) create the possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety. As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue. The NRC staff's analysis is set forth below.
The proposed amendment provides a one-time change to Function 4a, Reactor Coolant System (RCS) Hot Leg Temperature Indication, of TS Table 3.3.4-1. Specifically, this amendment allows the loop 4 RCS hot leg temperature indicator in the ACR to be inoperable for the remainder of Cycle 6, which is scheduled to end at the conclusion of the spring 2005 refueling outage (1) The proposed change does not significantly increase the probability or consequences of an accident previously evaluated because:
- The inoperability of the one T(hot) indicator does not change the probability of occurrence for these events since it is not an accident initiator. The T(hot) indicators on the four loops are non-safety related equipment.
- During safe shutdown for a MCR evacuation event, design basis flood or fire related event, no fuel damage is postulated to occur, nor is the integrity of the reactor coolant pressure boundary or containment barriers postulated to be lost.
Sufficient redundancy exists with the operational instrumentation to ensure that decay heat removal functions are not adversely impacted by this change.
(2) The proposed change does not create the possibility of a new or different kind of accident from any previously evaluated because it does not alter the function of the Remote Shutdown System which is to achieve and maintain safe reactor shutdown from outside the MCR. The TS instrumentation and controls required will be such that sufficient capability is retained for decay heat removal via the steam generators to provide the indication required for safe shutdown capabilities. The change will not result in the installation of any new equipment or system. The T(hot) instrument is used for indication only and has no automatic control functions. No new operations procedures will be created by this change. Appropriate operational procedures will be updated to clarify that the Loop 4 T(hot) indication in the ACR is not available during the remainder of Cycle 6. No new operating conditions or modes will be created by this proposed change.
(3) The proposed change does not involve a significant reduction in a margin of safety as the radiological dose consequences are not impacted since this change is only applicable to the following conditions:
- 1. fire or smoke in the MCR,
- 2. an evacuation of the MCR due to some other (non-fire) unspecified reason, and
- 3. the design basis flood.
During safe shutdown for an MCR evacuation event, design basis flood or fire related event, no fuel damage is postulated to occur, nor is the integrity of the reactor coolant pressure boundary or containment barriers postulated to be lost. Sufficient redundancy exists with the operational instrumentation to ensure that decay heat removal functions are not adversely impacted by this change.
Based on the above considerations, the NRC staff concludes that the amendment meets the three criteria of 10 CFR 50.92. Therefore, the staff has made a final determination that the proposed amendment does not involve a significant hazards consideration.
7.0 ENVIRONMENTAL CONSIDERATION
These amendments involve a change in the installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (69 FR 64596). Accordingly, these amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
8.0 CONCLUSION
On the basis of its review, the staff concluded that the licensees request for the Exigent TS change meets the requirements of 10 CFR Part 50 Appendices A and R in that the intent of the associated requirements is met in spite of the out-of-service instrument. From the standpoint of the ALARA (As Low As Reasonably Achievable) principle in 10 CFR Part 20 and the risk-benefit consideration, the Commission has no objection to the licensees proposed action of deferring instrument repair until the end of Cycle 6.
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
9.0 REFERENCES
- 1. U. S. Nuclear Regulatory Commission, Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 1 and 2, and Section 7.4 Systems Required for Safe Shutdown, of NUREG-0847, Supplement No. 7, September 1991.
- 2. U. S. Nuclear Regulatory Commission, Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 1 and 2, and Section 4.4.3.4 Reactor Coolant System Temperature Measurement, of NUREG-0847, Supplement No. 8, January 1992.
- 3. Tennessee Valley Authority Watts Bar Nuclear Plant Unit 1 Final Safety Analysis Volume 7, Section 7.4 Systems Required for Safe Shutdown, Table 7.2-1.
- 4. U. S. Nuclear Regulatory Commission, Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 1 and 2, Appendix FF Safety Evaluation Watts Bar Nuclear Plant Fire Protection Plan, NUREG-0847, Supplement No. 18, October 1995.
Principal Contributor: P. Qualls A. Wong Date: November 19, 2004
Mr. Karl W. Singer Tennessee Valley Authority WATTS BAR NUCLEAR PLANT cc:
Mr. Ashok S. Bhatnagar, Senior Vice President Mr. Paul L. Pace, Manager Nuclear Operations Licensing and Industry Affairs Tennessee Valley Authority Watts Bar Nuclear Plant 6A Lookout Place Tennessee Valley Authority 1101 Market Street P.O. Box 2000 Chattanooga, TN 37402-2801 Spring City, TN 37381 Mr. Michael J. Lorek, General Manager Mr. Larry S. Bryant, Manager Nuclear Engineering Watts Bar Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 6A Lookout Place P.O. Box 2000 1101 Market Street Spring City, TN 37381 Chattanooga, TN 37402-2801 Senior Resident Inspector Mr. William R. Lagergren Watts Bar Nuclear Plant Site Vice President U.S. Nuclear Regulatory Commission Watts Bar Nuclear Plant 1260 Nuclear Plant Road Tennessee Valley Authority Spring City, TN 37381 P.O. Box 2000 Spring City, TN 37381 County Executive Rhea County Courthouse General Counsel 375 Church Street Tennessee Valley Authority Suite 215 ET 11A Dayton, TN 37321 400 West Summit Hill Drive Knoxville, TN 37902 County Mayor P. O. Box 156 Mr. John C. Fornicola, Manager Decatur, TN 37322 Nuclear Assurance and Licensing Tennessee Valley Authority Mr. Lawrence E. Nanney, Director 6A Lookout Place Division of Radiological Health 1101 Market Street Dept. of Environment & Conservation Chattanooga, TN 37402-2801 Third Floor, L and C Annex 401 Church Street Mr. Fredrick C. Mashburn Nashville, TN 37243-1532 Senior Program Manager Nuclear Licensing Ms. Ann P. Harris Tennessee Valley Authority 341 Swing Loop Road 4X Blue Ridge Rockwood, Tennessee 37854 1101 Market Street Chattanooga, TN 37402-2801