Category:Letter type:CNL
MONTHYEARCNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-022, Decommissioning Funding Status Report2023-03-29029 March 2023 Decommissioning Funding Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu CNL-23-021, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-03-0808 March 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-015, Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08)2023-02-27027 February 2023 Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08) CNL-23-003, Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A2023-01-30030 January 2023 Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A CNL-23-009, Response to Request for Additional Information Request to Revise Technical Specification 3.4.122023-01-0404 January 2023 Response to Request for Additional Information Request to Revise Technical Specification 3.4.12 CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-12-22022 December 2022 Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-109, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2022-12-22022 December 2022 Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements CNL-22-101, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-012022-11-28028 November 2022 American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat2022-11-28028 November 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio CNL-22-099, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2022-10-31031 October 2022 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-22-098, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 552022-10-17017 October 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 55 CNL-22-085, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Al2022-09-0202 September 2022 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alte CNL-22-077, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-08-11011 August 2022 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-071, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-07-13013 July 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-22-070, Status Regarding the Improved Flood Mitigation System Project2022-06-30030 June 2022 Status Regarding the Improved Flood Mitigation System Project CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-06-0909 June 2022 Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change CNL-22-068, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-06-0808 June 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-047, Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2022-05-23023 May 2022 Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-22-043, Response to Request for Additional Information and Confirmation of Information Regarding Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board.2022-05-0202 May 2022 Response to Request for Additional Information and Confirmation of Information Regarding Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board. CNL-22-046, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan.2022-04-28028 April 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan. 2024-01-09
[Table view] Category:Technical Specification
MONTHYEARCNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) WBL-23-052, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual2023-11-0808 November 2023 Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) WBL-22-026, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual2022-05-11011 May 2022 Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual ML20273A0432020-09-29029 September 2020 Plants Unit 1 and 2 - Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual CNL-20-008, Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28)2020-07-27027 July 2020 Application to Modify Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specification 5.9.6, Reactor Coolant System Pressure and Temperature Limits Report, (WBN-TS-19-28) CNL-20-016, Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23)2020-06-22022 June 2020 Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23) CNL-20-004, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01)2020-01-17017 January 2020 Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01) CNL-19-051, Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology2020-01-17017 January 2020 Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology CNL-19-097, Non-Voluntary License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values (TS-19-22)2019-10-23023 October 2019 Non-Voluntary License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values (TS-19-22) CNL-19-105, Supplemental Response to Second-Round NRC Request for Additional Information Regarding Application to Revise Technical Specifications Regarding DC Electrical Systems TSTF-500, Revision 2 (WBN-TS-18-09)2019-10-10010 October 2019 Supplemental Response to Second-Round NRC Request for Additional Information Regarding Application to Revise Technical Specifications Regarding DC Electrical Systems TSTF-500, Revision 2 (WBN-TS-18-09) L-19-023, Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual2019-03-19019 March 2019 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays CNL-18-006, Technical Specification Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01)2018-01-10010 January 2018 Technical Specification Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01) CNL-17-149, Revised Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025)2017-12-27027 December 2017 Revised Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025) ML17321A0332017-11-16016 November 2017 Additional Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025) ML17306A8022017-11-0202 November 2017 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual NL-17-128, Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23)2017-10-11011 October 2017 Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23) CNL-17-128, Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23)2017-10-11011 October 2017 Application to Modify the Watts Bar Nuclear Plant Unit 2 Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure (391-WBN-TS-17-23) CNL-17-123, Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025)2017-09-29029 September 2017 Supplement to Application to Revise Technical Specifications to Adopt TSTF-547, Revision 1, Clarification of Rod Position Requirements (WBN-TS-16-025) CNL-17-044, Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (Abgts), for Watts Bar Nuclear Plant, Units 1 and 22017-05-0505 May 2017 Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (Abgts), for Watts Bar Nuclear Plant, Units 1 and 2 CNL-17-022, Application to Modify Technical Specification 5.7.2.19 Regarding One-Time Extension of 10 CFR 50, Appendix J Type C Local Leakage Rate Tests (391-WBN-TS-17-05)2017-02-16016 February 2017 Application to Modify Technical Specification 5.7.2.19 Regarding One-Time Extension of 10 CFR 50, Appendix J Type C Local Leakage Rate Tests (391-WBN-TS-17-05) ML16113A0772016-04-22022 April 2016 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual CNL-15-060, Technical Specifications Change No. WBN2-TS-15-16 - Revise Technical Specifications for Use of Steam Generator Alternate Repair Criterion F2015-12-15015 December 2015 Technical Specifications Change No. WBN2-TS-15-16 - Revise Technical Specifications for Use of Steam Generator Alternate Repair Criterion F ML15267A1832015-09-23023 September 2015 Watts Bar, Unit 2 - Submittal of Final Revision 0 of the Technical Specifications & Technical Specification Bases, and Final Revision 0 of the Technical Requirements Manual & Technical Requirements Manual Bases NL-15-181, Watts Bar Unit 1, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mod2015-09-0303 September 2015 Watts Bar Unit 1, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode CNL-15-181, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 42015-09-0303 September 2015 Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 4 CNL-15-133, Response to Request for Additional Information Related to Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08)2015-07-15015 July 2015 Response to Request for Additional Information Related to Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08) CNL-15-088, Application to Revise Technical Specifications for Component Cooling Water Snd Essential Raw Cooling Water to Support Dual Unit Operation (TS-WBN-15-13)2015-06-17017 June 2015 Application to Revise Technical Specifications for Component Cooling Water Snd Essential Raw Cooling Water to Support Dual Unit Operation (TS-WBN-15-13) CNL-14-218, Application to Modify Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08)2015-04-0606 April 2015 Application to Modify Technical Specification 3.8.1 Regarding Diesel Generator Steady State Frequency (WBN-TS-13-08) CNL-15-001, Application to Revise Technical Specification 4.2.1, Fuel Assemblies, (WBN-TS-15-03)2015-03-31031 March 2015 Application to Revise Technical Specification 4.2.1, Fuel Assemblies, (WBN-TS-15-03) CNL-14-217, Responses to Requests for Additional Information - Developmental Revision I Technical Specification Sections 3.8 and 5.72015-03-0505 March 2015 Responses to Requests for Additional Information - Developmental Revision I Technical Specification Sections 3.8 and 5.7 CNL-14-180, Technical Specification Sections 3.0 and 3.10.12015-01-22022 January 2015 Technical Specification Sections 3.0 and 3.10.1 ML14307A9812014-11-0303 November 2014 Periodic Submission for Changes Made to Technical Specification Bases and Technical Requirement Manual ML14170A0442014-06-16016 June 2014 Attachment 5 - WBN Unit 2 TS and Tsb Through Developmental Revision I, and Trm and Trmb Through Developmental Revision D ML14170A0452014-06-16016 June 2014 Attachment 1 - TS Developmental Revision I Changes (Mark-Up) for WBN Unit 2 ML14170A0462014-06-16016 June 2014 Attachment 2 - TS Bases Developmental Revision I Changes (Mark-Up) for WBN Unit 2 ML13357A0512013-12-12012 December 2013 Synopsis of Revisions Included in Watts Bar Unit 2 Developmental Revision H of Technical Specifications and Technical Specification Bases. Part 2 of 2 ML13357A0542013-12-12012 December 2013 Technical Specifications Bases ML13353A4782013-12-12012 December 2013 Fuel Handling Accident Dose Analysis Final Safety Analysis Report and Technical Specification Revision ML12333A2422012-11-20020 November 2012 Application to Modify Technical Specification 4.3.1, Criticality, (WBN-TS-12-03) ML12333A2402012-11-19019 November 2012 Unit I, Application to Modify Technical Specification 3.7.10, Control Room Emergency Ventilation System (WBN-TS-12-01) ML12240A2242012-08-23023 August 2012 Update to Technical Requirements Manual (TRM) Bases Section 3.7.2, Developmental Revision B ML12065A0352012-02-28028 February 2012 Watts Bar, Unit 2 - Technical Specifications Table of Contents Through Page B 3.9-32 ML12065A0362012-02-28028 February 2012 Submittal of Developmental Revision G of the Unit 2 Technical Specification (TS) and Technical Specification Bases 2023-09-20
[Table view] Category:Bases Change
MONTHYEARWBL-23-052, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual2023-11-0808 November 2023 Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu WBL-22-026, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual2022-05-11011 May 2022 Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual ML20273A0432020-09-29029 September 2020 Plants Unit 1 and 2 - Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual CNL-19-051, Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology2020-01-17017 January 2020 Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology L-19-023, Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual2019-03-19019 March 2019 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays CNL-18-006, Technical Specification Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01)2018-01-10010 January 2018 Technical Specification Change - Reactor Coolant Temperature Indicator Inoperable - Exigent Amendment (391-WBN-TS-2018-01) ML17306A8022017-11-0202 November 2017 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual CNL-17-022, Application to Modify Technical Specification 5.7.2.19 Regarding One-Time Extension of 10 CFR 50, Appendix J Type C Local Leakage Rate Tests (391-WBN-TS-17-05)2017-02-16016 February 2017 Application to Modify Technical Specification 5.7.2.19 Regarding One-Time Extension of 10 CFR 50, Appendix J Type C Local Leakage Rate Tests (391-WBN-TS-17-05) ML16113A0772016-04-22022 April 2016 Periodic Submission for Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual CNL-15-060, Technical Specifications Change No. WBN2-TS-15-16 - Revise Technical Specifications for Use of Steam Generator Alternate Repair Criterion F2015-12-15015 December 2015 Technical Specifications Change No. WBN2-TS-15-16 - Revise Technical Specifications for Use of Steam Generator Alternate Repair Criterion F ML15267A1832015-09-23023 September 2015 Watts Bar, Unit 2 - Submittal of Final Revision 0 of the Technical Specifications & Technical Specification Bases, and Final Revision 0 of the Technical Requirements Manual & Technical Requirements Manual Bases CNL-15-181, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 42015-09-0303 September 2015 Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode 4 NL-15-181, Watts Bar Unit 1, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mod2015-09-0303 September 2015 Watts Bar Unit 1, Revision to Essential Raw Cooling Water and Component Cooling System License Amendment Request Including Proposed Changes to Auxiliary Feedwater Pump Suction Transfer Instrumentation and Reactor Coolant System Loops - Mode CNL-14-217, Responses to Requests for Additional Information - Developmental Revision I Technical Specification Sections 3.8 and 5.72015-03-0505 March 2015 Responses to Requests for Additional Information - Developmental Revision I Technical Specification Sections 3.8 and 5.7 CNL-14-180, Technical Specification Sections 3.0 and 3.10.12015-01-22022 January 2015 Technical Specification Sections 3.0 and 3.10.1 ML14307A9812014-11-0303 November 2014 Periodic Submission for Changes Made to Technical Specification Bases and Technical Requirement Manual ML13357A0542013-12-12012 December 2013 Technical Specifications Bases ML13353A4782013-12-12012 December 2013 Fuel Handling Accident Dose Analysis Final Safety Analysis Report and Technical Specification Revision ML13357A0512013-12-12012 December 2013 Synopsis of Revisions Included in Watts Bar Unit 2 Developmental Revision H of Technical Specifications and Technical Specification Bases. Part 2 of 2 ML12333A2422012-11-20020 November 2012 Application to Modify Technical Specification 4.3.1, Criticality, (WBN-TS-12-03) ML12333A2402012-11-19019 November 2012 Unit I, Application to Modify Technical Specification 3.7.10, Control Room Emergency Ventilation System (WBN-TS-12-01) ML12240A2242012-08-23023 August 2012 Update to Technical Requirements Manual (TRM) Bases Section 3.7.2, Developmental Revision B ML12065A0352012-02-28028 February 2012 Watts Bar, Unit 2 - Technical Specifications Table of Contents Through Page B 3.9-32 ML12065A0362012-02-28028 February 2012 Submittal of Developmental Revision G of the Unit 2 Technical Specification (TS) and Technical Specification Bases ML11321A3082011-11-14014 November 2011 Changes Made to the Technical Specification Bases ML11228A0482011-08-10010 August 2011 Technical Specifications Bases (Developmental Revision F), Enclosure 2 ML11227A2562011-08-10010 August 2011 Application to Modify Watts Bar Nuclear Plant, Unit 1, Technical Specifications in Support of Watts Bar Nuclear Plant, Unit 2, Testing and Operation (TS-WBN-11-02) ML1104905702011-02-16016 February 2011 Supplemental Information for Review of Developmental Revision a of the Unit 2 Technical Specifications (TS) and Technical Specifications Bases (TS Bases) ML1015400652010-05-28028 May 2010 Technical Specifications Change WBN-TS-10-05 - Control Rod Assemblies ML1011701482010-04-20020 April 2010 Changes Made to the Technical Specification Bases ML1005506002010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.9 - Refueling Operations ML1005504822010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 2.0 - Safety Limits ML1005505972010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.8 - Electrical Power Systems ML1005505942010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.7 - Plant Systems ML1005505902010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.6 - Containment Systems ML1005505052010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.4 - Reactor Coolant System ML1005504972010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.2 - Power Distribution Limits ML1005504882010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.0 - Limiting Condition for Operation (LCO) Applicability ML1005504782010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases, Table of Contents ML1005505012010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.3 - Instrumentation ML1005505372010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.5 - Emergency Core Cooling Systems ML1005504942010-02-0202 February 2010 Developmental Revision B - Technical Specifications Bases B 3.1 - Reactivity Control Systems ML0919401912009-07-0909 July 2009 Watts, Unit 1 - Technical Specifications Change - Core Power Distribution Monitoring System. ML0916100682009-06-0505 June 2009 Change to TS 3.6.3, Containment Isolation Valves, Regarding Position Verification Requirements (TSTF-269-A, TSTF-45-A, and TSTF-440-A) ML0826610312008-09-22022 September 2008 Changes Made to the WBN Technical Specification Bases and Technical Requirements Manual ML0826703612008-09-18018 September 2008 Unit 1 - License Amendment (TS-08-09) to Revise the Technical Specifications (Ts), Bases and Updated Final Safety Analysis Report (UFSAR) for the Unit 2 Vital Inverters ML0826705432008-09-18018 September 2008 Technical Specification (TS) Change No. 08-07, Auxiliary Feedwater Auto-Start Upon Trip of the Turbine Driven Main Feedwater Pumps ML0821800932008-08-0101 August 2008 Watt'S Bar, Unit 1, Technical Specifications Change - Revision of Boron Requirements for Cold Leg Accumulators and Refueling Water Storage Tank. 2023-03-20
[Table view] Category:Technical Specifications
MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) ML22348A0052023-01-25025 January 2023 Issuance of Amendment Nos. 326, 349, and 309; 363 and 35; 159 and 67 Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements ML22349A6472023-01-20020 January 2023 Issuance of Amendment Nos. 325, 348, and 308; 362 and 356; and 158 and 66 Regarding Adoption of TSTF-529, Rev. 4, Clarify Use and Application Rules ML22276A1612022-10-24024 October 2022 Issuance of Amendment Nos. 359, 353, 155, & 63 Regarding Adoption of TSTF Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML22187A0192022-09-20020 September 2022 Issuance of Amendment No. 154 Regarding Revision to Technical Specification 3.3.2 to Revise Allowable Value for Trip of Turbine-Driven Main Feedwater Pumps ML22187A1812022-09-20020 September 2022 Issuance of Amendment Nos. 153 and 62 Regarding Extension of Completion Time for Technical Specification 3.7.8 for Inoperable Essential Raw Cooling Water Train CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) WBL-22-017, Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report2022-03-22022 March 2022 Technical Specification (TS) 5.9.8 - Post Accident Monitoring System (Pams) Report ML21260A2102021-11-22022 November 2021 Issuance of Amendment No. 57 to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level ML21158A2842021-09-17017 September 2021 Issuance of Amendment Nos. 148 and 55 to Revise Technical Specifications for Function 6.E of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation ML21099A2462021-05-14014 May 2021 Issuance of Amendment Nos. 146 and 52 to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML21078A4842021-05-0505 May 2021 Issuance of Amendment Nos. 145 and 51 for One-Time Change to Technical Specification 3.7.11 to Extend the Completion Time for Main Control Room Chiller Modifications ML21015A0342021-03-0909 March 2021 Issuance of Amendment No. 144 Regarding Post Accident Monitoring Instrumentation ML21034A1692021-02-26026 February 2021 Issuance of Amendment Nos. 143 and 50 Regarding Implementation of Full Spectrumtm Loss-of-Coolant Accident Analysis (LOCA) and New LOCA-Specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology ML20232C6222021-02-11011 February 2021 Issuance of Amendment Nos. 142 and 49 Regarding Revision to Technical Specifications to Implement WCAP-17661-P-A, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications (EPID L-2020-LLA-0037 ML20282A3452020-11-19019 November 2020 Issuance of Amendment Nos. 313, 336, 296, 350, 344, 138, and 44 Revise Emergency Plan On-Shift Emergency Medical Technician & Onsite Ambulance Requirements ML20226A4442020-10-21021 October 2020 Issuance of Amendment No. 42 Regarding Measurement Uncertainty Recapture Power Uprate ML20273A0432020-09-29029 September 2020 Plants Unit 1 and 2 - Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual ML20156A0182020-08-10010 August 2020 Issuance of Amendment No. 40 Regarding Technical Specifications for Steam Generator Tube Repair Sleeve CNL-19-115, Non-Voluntary License Amendment Request to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specific2020-03-0202 March 2020 Non-Voluntary License Amendment Request to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specificat ML20028F7332020-02-28028 February 2020 Issuance of Amendment Nos. 132 and 36 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-425, Revision 3 ML19276E5572019-12-0909 December 2019 Issuance of Amendment Nos. 130 and 33 Regarding Adoption of Technical Specifications Task Force Traveler, TSTF-500, DC Electrical Rewrite - Update to TSTF-360 ML19238A0052019-11-26026 November 2019 Issuance of Amendment Nos. 129 and 32 Regarding Changes to Technical Specifications 3.8.1, 3.8.7, 3.8.8, and 3.8.9 CNL-19-067, Application to Revise Watts Bar Nuclear Plant (WBN) Unit 2 - Technical Specifications for Steam Generator Tube Repair Sleeve (WBN-TS-391-19-13)2019-09-30030 September 2019 Application to Revise Watts Bar Nuclear Plant (WBN) Unit 2 - Technical Specifications for Steam Generator Tube Repair Sleeve (WBN-TS-391-19-13) CNL-19-060, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (WBN-TS-18-14)2019-08-29029 August 2019 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (WBN-TS-18-14) ML18277A1102019-08-27027 August 2019 Units, 1 & 2 Issuance of Amendment Nos. 309, 332, 292, 345, 339, 128, and 31 Regarding Unbalanced Voltage Protection ML19112A0042019-07-25025 July 2019 Issuance of Amendment Nos. 127 and 30 Regarding the Use of Optimized Zirlo Fuel Rod Cladding ML19098A7742019-06-0707 June 2019 Issuance of Amendments Regarding Technical Specifications Changes Pertaining to 120-Volt Alternating Current Vital Buses ML18255A1562018-10-30030 October 2018 Issuance of Amendment to Modify Technical Specification 3.3.1 Reactor Protection System Instrumentation, Turbine Trip Function on Low Fluid Oil Pressure ML18079A0292018-06-26026 June 2018 Issuance of Amendments Regarding Adoption of TSTF-547, Clarification of Rod Position Requirements (CAC Nos. MF8912and MF8913; EPID L-2016-LLA-0034) ML17311A7862017-12-0707 December 2017 Issuance of Amendment Regarding Ventilation Filter Testing Program (CAC No. MF9584; EPID L-2017-LLA-0207) ML17215A2432017-10-0202 October 2017 Browns Ferry Nuclear Plant, Units 1, 2, and 3; Watts Bar Nuclear Plant, Units 1 and 2 - Issuance of Amendments to Change Technical Specifications to Adopt Technical Specifications Task Force Traveler-522 (CAC No. MF9562-MF9566) CNL-17-029, Response to Request for Additional Information Regarding License Amendment Request for a One-Time Extension of Technical Specification Surveillance Requirements for AC Sources2017-03-0606 March 2017 Response to Request for Additional Information Regarding License Amendment Request for a One-Time Extension of Technical Specification Surveillance Requirements for AC Sources ML16343A8142017-01-0505 January 2017 Issuance of Amendment Regarding One-Time Extension of Intervals for Surveillance Requirements 3.6.11.2 and 3.6.11.3 CNL-16-164, Application to Modify Technical Specifications to Extend Surveillance Requirement Intervals for AC Sources (WBN-TS-16-024)2016-10-17017 October 2016 Application to Modify Technical Specifications to Extend Surveillance Requirement Intervals for AC Sources (WBN-TS-16-024) NL-16-164, Watts Bar, Units 1 and 2 - Application to Modify Technical Specifications to Extend Surveillance Requirement Intervals for AC Sources (WBN-TS-16-024)2016-10-17017 October 2016 Watts Bar, Units 1 and 2 - Application to Modify Technical Specifications to Extend Surveillance Requirement Intervals for AC Sources (WBN-TS-16-024) ML16159A0572016-07-29029 July 2016 Issuance of Amendment Regarding Revised Technical Specification 4.2.1 Fuel Assemblies to Increase the Maximum Number of Tritium Producing Burnable Absorber Rods CNL-16-047, Response to Request for Additional Information Regarding Request to Use F* Steam Generator Alternate Repair Criteria2016-05-0404 May 2016 Response to Request for Additional Information Regarding Request to Use F* Steam Generator Alternate Repair Criteria ML15344A3182015-12-23023 December 2015 Issuance of Amendment Regarding Fire Protection License Conditions ML15348A1122015-12-14014 December 2015 Technical Specification (TS) 5.7.2.15 - Explosive Gas and Storage Tank Radioactivity Monitoring Program ML15251A5872015-10-22022 October 2015 Issuance of Facility Operating License No. NPF-96 Watts Bar Nuclear Plant, Unit 2 ML15301A1402015-10-22022 October 2015 Current Facility Operating License NPF-96, Tech Specs, Revised 11/08/2017 ML15275A0422015-10-20020 October 2015 Issuance of Amendment Regarding Application to Revise Technical Specifications for Component Cooling Water and Essential Raw Cooling Water to Support Dual Unit Operation ML15230A1552015-09-17017 September 2015 Issuance of Amendment Regarding Modification to Technical Specification 3.8.1 Regarding Diesel Generator Steady-State Frequency NL-15-177, Watts Bar, Unit 2, Submittal of Replacement Pages for Developmental and Final Revision J of the Technical Specification & Technical Specification Bases, and Developmental and Final Revision E of Technical Requirements Manual & Technical Ma2015-09-0404 September 2015 Watts Bar, Unit 2, Submittal of Replacement Pages for Developmental and Final Revision J of the Technical Specification & Technical Specification Bases, and Developmental and Final Revision E of Technical Requirements Manual & Technical Man 2024-01-09
[Table view] |
Text
L44 150122 001 Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-14-180 January 22, 2015 10 CFR § 50.36(a)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 Construction Permit No. CPPR-92 NRC Docket No. 50-391
Subject:
Watts Bar Nuclear Plant Unit 2 - Technical Specification Sections 3.0 and 3.10.1
Reference:
- 1. Letter from TVA to NRC, Watts Bar Nuclear Plant Unit 2 - Submittal of Developmental Revision I of the Unit 2 Technical Specification &
Technical Specification Bases and Developmental Revision D of the Unit 2 Technical Requirements Manual and Technical Requirements Manual Bases, dated June 16, 2014 [ADAMS Accession No. ML14169A525]
This letter provides an update to the Tennessee Valley Authority (TVA) Watts Bar Nuclear Plant (WBN) Unit 2 Developmental Revision I Technical Specification (TS) and Technical Specification Bases (TS Bases). The Tennessee Valley Authority proposes to add (1) a new Limiting Condition for Operation (LCO) Applicability requirement, LCO 3.0.9 and its associated Bases, and (2) a new TS 3.10 Special Operations and its associated Bases. Minor associated changes to LCO 3.0.1 and LCO 3.0.7 have also been made. These changes have not been the subject of a prior submittal. The WBN Unit 2 Developmental Revision I of the Unit 2 TS and TS Bases was submitted to the Nuclear Regulatory Commission (NRC) in Reference 1.
The purpose of the revisions is to permit Mode changes normally precluded by LCO 3.0.4 for those plant conditions where the heat removal capability of the Essential Raw Cooling Water (ERCW) and Component Cooling Water System (CCS) is insufficient to maintain both units in hot shutdown (MODE 4) or cold shutdown (MODE 5). The CCS and ERCW are shared safety systems as defined by General Design Criteria 5. The specific conditions that necessitate this TS change are described in FSAR Section 9.2.1 and 9.2.2.
U.S. Nuclear Regulatory Commission Page 2 January 22, 2015 The enclosure provides the rationale for the change. Attachments 1 through 3 of the enclosure provide marked-up and clean versions of the revised TS and TS Bases sections and the new TS 3.10 Special Operations and associated TS Bases.
There are no new regulatory commitments associated with this submittal. If you have any questions, please contact Gordon Arent at (423) 365-2004.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 22nd day of January 2015.
Respectfully,
Enclosure:
Tennessee Valley Authority, Watts Bar Nuclear Plant, Unit 2, New Technical Specification to Support Plant Licensing Basis for Component Cooling Water and Essential Raw Cooling Water cc (Enclosure):
NRC Regional Administrator- Region II NRC Senior Resident Inspector- Watts Bar Nuclear Plant, Unit 2 NRC Project Manager- Watts Bar Nuclear Plant, Unit 2
ENCLOSURE TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT, UNIT 2 New Technical Specification to Support Plant Licensing Basis for Component Cooling Water and Essential Raw Cooling Water CNL-14-180 E-1
ENCLOSURE WATTS BAR NUCLEAR PLANT, UNIT 2 New Technical Specification to Support Plant Licensing Basis for Component Cooling Water and Essential Raw Cooling Water A revision is being made to the Watts Bar Nuclear Plant (WBN) Unit 2 Technical Specifications (TS) and TS Bases to allow operation in accordance with the plant design bases as described in Chapter 9 of the WBN Unit 2 Final Safety Analysis Report (FSAR).
The Essential Raw Cooling Water (ERCW) System and the Component Cooling Water System (CCS) are safety systems that are shared by WBN Unit 1 and Unit 2. As such, the systems design conform to the requirements of General Design Criteria (GDC) 5. The ERCW system is described in Section 9.2.1 of the WBN Unit 2 FSAR and the CCS is described in FSAR Section 9.2.2 (Reference 1). As noted in these FSAR sections, the design basis safe shutdown condition for WBN is hot standby (Mode 3). In addition to these FSAR sections, References 2 through 4 provided further details on the conformance of ERCW and CCS to GDC 5.
There are two events where WBN Unit 2 may need to be returned to Mode 3 from Mode 4 or Mode 5, without all of the conditions for a mode change required by the TS being satisfied. The TS requirements for a mode change may not be met as a result of the loss of plant equipment assumed in the design bases evaluation of these events. A change is being made to the WBN Unit 2 TS and TS Bases to permit the unit to return to Mode 3 from a lower mode in the unlikely circumstance that either of these two events occur.
The following two events are being addressed by this TS change.
- 1. Watts Bar Unit 2 is in Mode 4 or Mode 5. A loss of coolant accident (LOCA) occurs on Unit 1. Coincidently, offsite power is lost and a single failure occurs that results in the loss of an emergency power train.
- 2. A simultaneous or near simultaneous shutdown of both units occurs. The units are being cooled down. The units may be in Mode 4 or Mode 5, a loss of offsite power occurs, and simultaneously there is the loss of an emergency power train.
The single failure assumed for these events is the loss of an emergency power train. The loss of offsite power in conjunction with this single failure will result in the loss of two 6.9 Kilovolt Shutdown Boards. The loss of offsite power and this single failure results in a limited number of ERCW and CCS pumps being available, and limits the number of CCS heat exchangers available.
The LOCA event is described in FSAR Sections 9.2.1 and 9.2.2 as possibly requiring the non-accident unit to return to Mode 3. The FSAR contains the following statements.
If one unit is in an accident condition, the other unit should be maintained at hot standby (if it can not be maintained in its operating mode) until the accident unit cooldown is accomplished.
If the non-accident unit is utilizing Residual Heat Removal (RHR) cooling, it may be necessary to close the Component Cooling System (CCS) supply CNL-14-180 E-2
ENCLOSURE WATTS BAR NUCLEAR PLANT, UNIT 2 New Technical Specification to Support Plant Licensing Basis for Component Cooling Water and Essential Raw Cooling Water to these heat exchangers. Core cooling using RHR may be terminated when the non-accident unit is in RHR cooldown.
When RHR cooling is terminated, the non-accident unit will be allowed to return to hot standby. After the decay heat load from both units has dropped to the point where RHR cooling can be provided to both the accident and non-accident unit, the non-accident unit may be brought to cold shutdown.
Assuming a LOCA on WBN Unit 1 in Mode 1 with Unit 2 in Mode 4 or 5 is more limiting than assuming a Mode 4 or Mode 5 starting point for both units. The decay heat for a unit in Mode 1 will be higher than a unit that has been shutdown even for a brief period of time and there is more latent heat in the RCS when a unit is in Mode 1 versus a unit in Mode 4 or 5. The plant behavior post loss of offsite power with the loss of a power train single failure is very similar to the LOCA event described in the FSAR. One unit can proceed to or stay on RHR for decay heat removal. The other unit will return to Mode 3 until the decay heat load from both units has dropped to the point that the second unit can be placed on RHR cooling and be brought to cold shutdown.
As described in FSAR Section 9.2.2, there is sufficient ERCW and CCS capability to meet the GDC 5 requirement to bring the non-accident unit to cold shutdown. The non-accident unit can reach cold shutdown within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from entry into the Hot Standby mode. A cooldown analysis for the non-accident unit assumes that its decay heat will be removed by the Steam Generators (SGs) and SG Safety Valves until such time that its decay heat has decreased sufficiently that the total decay heat (constant accident unit decay heat plus decreasing non-accident unit decay heat) is less than the capability of ERCW and CCS. The analysis is performed with CCS carrying all required loads on both the accident and (later in the event) the non-accident unit, including the Spent Fuel Pool.
The attachments listed below provide the marked-up and clean pages of TS 3.0 and associated TS Bases and new TS 3.10 and associated bases to permit operation for the design basis conditions described above.
ATTACHMENT 1 - WBN Unit 2 Developmental Revision I TS and TS Bases Marked-Up Pages for 3.0 Limiting Condition for Operation (LCO) Applicability ATTACHMENT 2 - New WBN Unit 2 Developmental Revision I TS and TS Bases Section 3.10 Special Operations (B 3.10.1 LCO 3.0.4 Exception)
ATTACHMENT 3 - WBN Unit 2 Developmental Revision I TS and TS Bases Re-Typed Pages for 3.0 Limiting Condition for Operation (LCO) Applicability CNL-14-180 E-3
ENCLOSURE WATTS BAR NUCLEAR PLANT, UNIT 2 New Technical Specification to Support Plant Licensing Basis for Component Cooling Water and Essential Raw Cooling Water
References:
- 1. Watts Bar Nuclear Plant Unit 2, Final Safety Analysis Report, Section 9.2.1 Essential Raw Cooling Water and Section 9.2.2, Component Cooling Water
- 2. Letter from TVA to NRC dated December 10, 2010, Watts Bar Nuclear Plant (WBN)
Unit 2 - Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information (ADAMS Accession Number ML103480708)
- 3. Letter from TVA to NRC dated April 13, 2011, Watts Bar Nuclear Plant (WBN) Unit 2 -
Final Safety Analysis Report (FSAR) - Response to Requests for Additional Information (RAIs) Related to FSAR Sections 9.2.1 and 9.2.2
- 4. Letter from TVA to NRC dated June 12, 2014, Watts Bar Nuclear Plant, Unit 2 -
Request for Additional Information Regarding Final Safety Analysis Report Amendment Related to Section 9.2 Component Cooling System CNL-14-180 E-4
ENCLOSURE WATTS BAR NUCLEAR PLANT, UNIT 2 New Technical Specification to Support Plant Licensing Basis for Component Cooling Water and Essential Raw Cooling Water ATTACHMENT 1 WBN Unit 2 Developmental Revision I TS and TS Bases Marked-Up Pages for 3.0 Limiting Condition for Operation (LCO) Applicability NOTE: Mark-up deletions identified by bold strikethrough (deletion) and additions identified by bold underline (addition).
CNL-14-180 E-5
ENCLOSURE WATTS BAR NUCLEAR PLANT, UNIT 2 New Technical Specification to Support Plant Licensing Basis for Component Cooling Water and Essential Raw Cooling Water LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2, 3.0.7, and 3.0.9.
LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.
If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required unless otherwise stated.
LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in:
- a. MODE 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />;
- b. MODE 4 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and
- c. MODE 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.
Exceptions to this Specification are stated in the individual Specifications.
Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.
LCO 3.0.3 is only applicable in MODES 1, 2, 3, and 4.
LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:
- a. When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time; (continued)
Watts Bar - Unit 2 3.0-1 (developmental) Revision AJ CNL-14-180 E-6
ENCLOSURE WATTS BAR NUCLEAR PLANT, UNIT 2 New Technical Specification to Support Plant Licensing Basis for Component Cooling Water and Essential Raw Cooling Water LCO Applicability 3.0 3.0 LCO APPLICABILITY (continued)
LCO 3.0.7 Test Exception LCOs 3.1.9 and 3.1.10 allow specified Technical Specification (TS) requirements to be changed to permit performance of special tests and operations. Unless otherwise specified, all other TS requirements remain unchanged. Compliance with Test Exception LCOs is optional. When a Test Exception LCO is desired to be met but is not met, the ACTIONS of the Test Exception LCO shall be met. When a Test Exception LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall be made in accordance with the other applicable Specifications.
LCO 3.0.8 When one or more required snubbers are unable to perform their associated support function(s), any affected supported LCO(s) are not required to be declared not met solely for this reason if risk is assessed and managed, and:
- a. the snubbers not able to perform their associated support function(s) are associated with only one train or subsystem of a multiple train or subsystem supported system or are associated with a single train or subsystem supported system and are able to perform their associated support function within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />; or
- b. the snubbers not able to perform their associated support function(s) are associated with more than one train or subsystem of a multiple train or subsystem supported system and are able to perform their associated support function within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
At the end of the specified period the required snubbers must be able to perform their associated support function(s), or the affected supported system (LCOs) shall be declared not met.
LCO 3.0.9 Special Operation LCO 3.10.1 allows specified TS requirements to be suspended to permit performance of special operations. Unless otherwise specified, all other TS requirements remain unchanged.
Compliance with Special Operations LCOs is optional. When a Special Operation LCO is desired to be met but is not met, the ACTIONS of the Special Operation LCO shall be met. When a Special Operation LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall be made in accordance with the other applicable Specifications.
Watts Bar - Unit 2 3.0-3 (developmental) Revision AJ CNL-14-180 E-7
ENCLOSURE WATTS BAR NUCLEAR PLANT, UNIT 2 New Technical Specification to Support Plant Licensing Basis for Component Cooling Water and Essential Raw Cooling Water LCO Applicability B 3.0 B 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY BASES LCOs LCO 3.0.1 through LCO 3.0.7 3.0.9 establish the general requirements applicable to all Specifications and apply at all times, unless otherwise stated.
LCO 3.0.1 LCO 3.0.1 establishes the Applicability statement within each individual Specification as the requirement for when the LCO is required to be met (i.e., when the unit is in the MODES or other specified conditions of the Applicability statement of each Specification).
LCO 3.0.2 LCO 3.0.2 establishes that upon discovery of a failure to meet an LCO, the associated ACTIONS shall be met. The Completion Time of each Required Action for an ACTIONS Condition is applicable from the point in time that an ACTIONS Condition is entered. The Required Actions establish those remedial measures that must be taken within specified Completion Times when the requirements of an LCO are not met. This Specification establishes that:
- a. Completion of the Required Actions within the specified Completion Times constitutes compliance with a Specification; and
- b. Completion of the Required Actions is not required when an LCO is met within the specified Completion Time, unless otherwise specified.
There are two basic types of Required Actions. The first type of Required Action specifies a time limit in which the LCO must be met. This time limit is the Completion Time to restore an inoperable system or component to OPERABLE status or to restore variables to within specified limits. If this type of Required Action is not completed within the specified Completion Time, a shutdown may be required to place the unit in a MODE or condition in which the Specification is not applicable. (Whether stated as a Required Action or not, correction of the entered Condition is an action that may always be considered upon entering ACTIONS.) The second type of Required Action specifies the remedial measures that permit continued operation of the unit that is not further restricted by the Completion Time. In this case, compliance with the Required Actions provides an acceptable level of safety for continued operation.
(continued)
Watts Bar - Unit 2 B 3.0-1 (developmental) Revision AJ CNL-14-180 E-8
ENCLOSURE WATTS BAR NUCLEAR PLANT, UNIT 2 New Technical Specification to Support Plant Licensing Basis for Component Cooling Water and Essential Raw Cooling Water LCO Applicability B 3.0 BASES (continued)
LCO 3.0.8 LCO 3.0.8 requires that risk be assessed and managed. Industry and (continued) NRC guidance on the implementation of 10 CFR 50.65(a)(4) (the Maintenance Rule) does not address seismic risk. However, use of LCO 3.0.8 should be considered with respect to other plant maintenance activities, and integrated into the existing Maintenance Rule process to the extent possible so that maintenance on any unaffected train or subsystem is properly controlled, and emergent issues are properly addressed. The risk assessment need not be quantified, but may be a qualitative awareness of the vulnerability of systems and components when one or more snubbers are not able to perform their associated support function.
LCO 3.0.9 There are certain special operations required to be performed at various times over the life of the plant. These special operations are necessary to perform special evolutions.
Special Operations LCO 3.10.1 allows specified TS requirements to be suspended to permit performances of these special operations, which otherwise could not be performed if required to comply with the requirements of these TS. Unless otherwise specified, all the other TS requirements remain unchanged. This will ensure all appropriate requirements of the MODE or other specified condition not directly associated with or required to be changed to perform the special operation will remain in effect.
The Applicability of a Special Operation LCO represents a condition not necessarily in compliance with the normal requirements of the TS. Compliance with Special Operations LCOs is optional. A special operation may be performed either under the provisions of the appropriate Special Operation LCO or under the other applicable TS requirements. If it is desired to perform the special operation under the provisions of the Special Operation LCO, the requirements of the Special Operation LCO shall be followed.
Watts Bar - Unit 2 B 3.0-12 (developmental) Revision AJ CNL-14-180 E-9
ENCLOSURE WATTS BAR NUCLEAR PLANT, UNIT 2 New Technical Specification to Support Plant Licensing Basis for Component Cooling Water and Essential Raw Cooling Water Attachment 2 New WBN Unit 2 Developmental Revision I TS and TS Bases 3.10 Special Operations (3.10.1 LCO 3.0.4 Exception)
CNL-14-180 E-10
ENCLOSURE WATTS BAR NUCLEAR PLANT, UNIT 2 New Technical Specification to Support Plant Licensing Basis for Component Cooling Water and Essential Raw Cooling Water LCO 3.0.4 Exception 3.10.1 3.10 SPECIAL OPERATIONS 3.10.1 LCO 3.0.4 Exception LCO 3.10.1 The requirements of LCO 3.0.4, and all other LCO Required Actions requiring MODE changes, may be suspended for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> for entry into MODE 4 from MODE 5 and for entry into MODE 3 from MODE 4, if offsite power is unavailable and Train A or Train B AC electric power is inoperable for the following conditions:
- a. Unit 1 in MODE 4 or MODE 5, or
- b. Unit 1 experiencing a LOCA.
APPLICABILITY: MODES 3, 4, and 5.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Requirements of A.1 Restore AC Power to an 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> LCO 3.0.4 suspended OPERABLE status.
for > 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
OR A.2 Be in MODE 5. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.10.1.1 Verify the requirements of LCO 3.0.4 have been 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> suspended for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
Watts Bar-Unit 2 3.10-1 (developmental) Revision J CNL-14-180 E-11
ENCLOSURE WATTS BAR NUCLEAR PLANT, UNIT 2 New Technical Specification to Support Plant Licensing Basis for Component Cooling Water and Essential Raw Cooling Water B 3.10 SPECIAL OPERATIONS B 3.10.1 LCO 3.0.4 Exception LCO 3.0.4 Exception B 3.10.1 BASES BACKGROUND The purpose of this Special Operations LCO is to permit MODE changes normally precluded by LCO 3.0.4 for those plant conditions where the heat removal capacity of the Essential Raw Cooling Water (ERCW) and Component Cooling Water System (CCS) is insufficient to maintain both units in cold shutdown or hot shutdown.
The ERCW system and CCS are shared safety systems for Watts Bar Nuclear Plant (WBN) Units 1 and 2.
The ERCW system is arranged in two headers (trains) each serving certain components in each unit. There are eight ERCW pumps arranged electrically so that two pumps are fed from each shutdown board (1A-A, 1B-B, 2A-A, and 2B-B). The minimum combined safety requirements for one accident unit and one non-accident unit are met by only two pumps on one header (train) (Ref. 1).
The CCS provides a heat sink for the removal of process and operating heat from safety-related components during a Design Basis Accident (DBA) or transient. During normal operation, the CCS also provides this function for various non-essential components, as well as the spent fuel storage pool. The principal safety-related function of the CCS is the removal of decay heat from the reactor via the Residual Heat Removal (RHR) System. This may be during a normal or post accident cool down and shut down (Ref. 2).
APPLICABLE During certain plant conditions that result in a total amount of decay SAFETY heat between the units that exceeds the capacity of ERCW and CCS, ANALYSES the ability to maintain the units in a cold shutdown or hot shutdown condition with the exclusive use of the RHR System may not be possible.
However, the heat removal capacity of ERCW and CCS is sufficient to place an accident unit or one shutdown unit (WBN Unit 1) in cold shutdown and maintain the non-accident unit (WBN Unit 2) in a safe shutdown condition (hot standby).
(continued)
Watts Bar-Unit 2 B 3.10-1 (developmental) Revision J CNL-14-180 E-12
ENCLOSURE WATTS BAR NUCLEAR PLANT, UNIT 2 New Technical Specification to Support Plant Licensing Basis for Component Cooling Water and Essential Raw Cooling Water LCO 3.0.4 Exception B 3.10.1 BASES (continued)
APPLICABLE An analysis demonstrates that there is sufficient ERCW and CCS SAFETY capability to bring the non-accident unit to cold shutdown.
ANALYSES The non-accident unit can reach cold shutdown within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (continued) from entry into hot standby. The supporting cooldown analysis was performed with CCS carrying all required loads on both the accident and (later in the event) the non-accident unit, including the Spent Fuel Pool.
The core decay heat used in the analysis was consistent with the decay heat used in the normal cooldown analysis. Once RHR is placed in-service, credit for decay heat removal by the steam generators is no longer taken (Ref. 3).
Allowing the reactor to change MODES when ERCW and CCS lacks sufficient heat removal capability to maintain both units in a cold shutdown or hot shutdown condition is consistent with the design and licensing basis for maintaining non-accident units in a safe shutdown condition.
LCO As described in LCO 3.0.9, compliance with this Special Operations LCO is optional.
The conditions that may require suspension of the requirements of LCO 3.0.4 include a loss of offsite power and a loss of one train of AC electrical power; Unit 1 in MODE 4, MODE 5, or experiencing a loss of coolant accident (LOCA); and Unit 2 in MODE 4 or 5.
When the heat removal capacity of ERCW and CCS is insufficient to remove the decay heat and/or accident heat loads for Unit 1 and maintain Unit 2 in a cold shutdown or hot shutdown condition, the requirements of LCO 3.0.4 may be suspended to allow the unit to remain in or heatup and return to MODE 3.
(continued)
Watts Bar-Unit 2 B 3.10-2 (developmental) Revision J CNL-14-180 E-13
ENCLOSURE WATTS BAR NUCLEAR PLANT, UNIT 2 New Technical Specification to Support Plant Licensing Basis for Component Cooling Water and Essential Raw Cooling Water LCO 3.0.4 Exception B 3.10.1 BASES (continued)
LCO The suspension of the requirements of LCO 3.0.4 is limited to 48 (continued) hours, at which time the ACTIONS require restoration of AC Power or placing the unit in MODE 5. The LCO and Required Action Completion Times assure that there is sufficient ERCW and CCS capability to bring a non-accident unit to cold shutdown within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from entry into hot standby.
APPLICABILITY In MODE 4 and in MODE 5, the heat removal capability of ERCW and CCS may be insufficient to prevent the unit from heating up and changing MODES, depending on the time after shutdown, the availability of AC electrical power to two trains of CCS pumps, and the heat load to CCS from Unit 1.
When the combination of plant conditions precludes maintaining the unit in cold shutdown, the requirements of LCO 3.0.4 and all other LCO Required Actions requiring MODE changes may be suspended to allow Unit 2 to change from MODE 5 to MODE 4 and from MODE 4 to MODE 3 when one or more LCOs are not met.
In MODES 1 and 2, the suspension of the requirements of LCO 3.0.4 based on the heat removal capability of ERCW and CCS is unnecessary.
In MODE 6, the decay heat from the reactor is well within the capability of ERCW and CCS, regardless of the availability of two trains of AC electrical power and the heat load to CCS from Unit 1. Therefore, suspension of the requirements of LCO 3.0.4 is unnecessary.
(continued)
Watts Bar-Unit 2 B 3.10-3 (developmental) Revision J CNL-14-180 E-14
ENCLOSURE WATTS BAR NUCLEAR PLANT, UNIT 2 New Technical Specification to Support Plant Licensing Basis for Component Cooling Water and Essential Raw Cooling Water LCO 3.0.4 Exception B 3.10.1 BASES (continued)
ACTIONS A.1 and A.2 With the requirements of the LCO not met, the plant conditions that form the basis for suspending the requirements of LCO 3.0.4 no longer exist.
Therefore, focus is placed on either restoring the AC electrical power or placing the unit in MODE 5. The Completion Time of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is sufficient time to place the unit in cold shutdown with the reduced capabilities of ERCW and CCS 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or more after the unit has been shutdown to a hot standby condition.
SURVEILLANCE SR 3.10.1.1 REQUIREMENTS Periodic verification that the requirements of LCO 3.0.4 have not been suspended for more than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> ensures the basis for suspending the requirements of LCO 3.0.4 is maintained. Otherwise, the decay heat being generated by the units is with the reduced capability of ERCW and CCS, and the need to suspend the requirements of LCO 3.0.4 is no longer necessary.
REFERENCES 1. FSAR Section 8.3.1, AC Power System
- 2. FSAR Section 9.2.2, Component Cooling System
- 3. FSAR Section 9.2.1, Essential Raw Cooling Water Watts Bar-Unit 2 B 3.10-4 (developmental) Revision J CNL-14-180 E-15
ENCLOSURE WATTS BAR NUCLEAR PLANT, UNIT 2 New Technical Specification to Support Plant Licensing Basis for Component Cooling Water and Essential Raw Cooling Water Attachment 3 WBN Unit 2 Developmental Revision I TS and TS Bases Re-Typed Pages for 3.0 Limiting Condition for Operation (LCO) Applicability CNL-14-180 E-16
ENCLOSURE WATTS BAR NUCLEAR PLANT, UNIT 2 New Technical Specification to Support Plant Licensing Basis for Component Cooling Water and Essential Raw Cooling Water LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2, 3.0.7, and 3.0.9.
LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.
If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required unless otherwise stated.
LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in:
- a. MODE 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />;
- b. MODE 4 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and
- c. MODE 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.
Exceptions to this Specification are stated in the individual Specifications.
Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.
LCO 3.0.3 is only applicable in MODES 1, 2, 3, and 4.
LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:
- a. When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time; (continued)
Watts Bar - Unit 2 3.0-1 (developmental) Revision J CNL-14-180 E-17
ENCLOSURE WATTS BAR NUCLEAR PLANT, UNIT 2 New Technical Specification to Support Plant Licensing Basis for Component Cooling Water and Essential Raw Cooling Water LCO Applicability 3.0 3.0 LCO APPLICABILITY (continued)
LCO 3.0.7 Test Exception LCOs 3.1.9 and 3.1.10 allow specified Technical Specification (TS) requirements to be changed to permit performance of special tests. Unless otherwise specified, all other TS requirements remain unchanged. Compliance with Test Exception LCOs is optional.
When a Test Exception LCO is desired to be met but is not met, the ACTIONS of the Test Exception LCO shall be met. When a Test Exception LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall be made in accordance with the other applicable Specifications.
LCO 3.0.8 When one or more required snubbers are unable to perform their associated support function(s), any affected supported LCO(s) are not required to be declared not met solely for this reason if risk is assessed and managed, and:
- a. the snubbers not able to perform their associated support function(s) are associated with only one train or subsystem of a multiple train or subsystem supported system or are associated with a single train or subsystem supported system and are able to perform their associated support function within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />; or
- b. the snubbers not able to perform their associated support function(s) are associated with more than one train or subsystem of a multiple train or subsystem supported system and are able to perform their associated support function within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
At the end of the specified period the required snubbers must be able to perform their associated support function(s), or the affected supported system (LCOs) shall be declared not met.
LCO 3.0.9 Special Operation LCO 3.10.1 allows specified TS requirements to be suspended to permit performance of special operations. Unless otherwise specified, all other TS requirements remain unchanged.
Compliance with Special Operations LCOs is optional. When a Special Operation LCO is desired to be met but is not met, the ACTIONS of the Special Operation LCO shall be met. When a Special Operation LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall be made in accordance with the other applicable Specifications.
Watts Bar - Unit 2 3.0-3 (developmental) Revision J CNL-14-180 E-18
ENCLOSURE WATTS BAR NUCLEAR PLANT, UNIT 2 New Technical Specification to Support Plant Licensing Basis for Component Cooling Water and Essential Raw Cooling Water LCO Applicability B 3.0 B 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY BASES LCOs LCO 3.0.1 through LCO 3.0.9 establish the general requirements applicable to all Specifications and apply at all times, unless otherwise stated.
LCO 3.0.1 LCO 3.0.1 establishes the Applicability statement within each individual Specification as the requirement for when the LCO is required to be met (i.e., when the unit is in the MODES or other specified conditions of the Applicability statement of each Specification).
LCO 3.0.2 LCO 3.0.2 establishes that upon discovery of a failure to meet an LCO, the associated ACTIONS shall be met. The Completion Time of each Required Action for an ACTIONS Condition is applicable from the point in time that an ACTIONS Condition is entered. The Required Actions establish those remedial measures that must be taken within specified Completion Times when the requirements of an LCO are not met. This Specification establishes that:
- c. Completion of the Required Actions within the specified Completion Times constitutes compliance with a Specification; and
- d. Completion of the Required Actions is not required when an LCO is met within the specified Completion Time, unless otherwise specified.
There are two basic types of Required Actions. The first type of Required Action specifies a time limit in which the LCO must be met. This time limit is the Completion Time to restore an inoperable system or component to OPERABLE status or to restore variables to within specified limits. If this type of Required Action is not completed within the specified Completion Time, a shutdown may be required to place the unit in a MODE or condition in which the Specification is not applicable. (Whether stated as a Required Action or not, correction of the entered Condition is an action that may always be considered upon entering ACTIONS.) The second type of Required Action specifies the remedial measures that permit continued operation of the unit that is not further restricted by the Completion Time. In this case, compliance with the Required Actions provides an acceptable level of safety for continued operation.
(continued)
Watts Bar - Unit 2 B 3.0-1 (developmental) Revision J CNL-14-180 E-19
ENCLOSURE WATTS BAR NUCLEAR PLANT, UNIT 2 New Technical Specification to Support Plant Licensing Basis for Component Cooling Water and Essential Raw Cooling Water LCO Applicability B 3.0 BASES (continued)
LCO 3.0.8 LCO 3.0.8 requires that risk be assessed and managed. Industry and (continued) NRC guidance on the implementation of 10 CFR 50.65(a)(4) (the Maintenance Rule) does not address seismic risk. However, use of LCO 3.0.8 should be considered with respect to other plant maintenance activities, and integrated into the existing Maintenance Rule process to the extent possible so that maintenance on any unaffected train or subsystem is properly controlled, and emergent issues are properly addressed. The risk assessment need not be quantified, but may be a qualitative awareness of the vulnerability of systems and components when one or more snubbers are not able to perform their associated support function.
LCO 3.0.9 There are certain special operations required to be performed at various times over the life of the plant. These special operations are necessary to perform special evolutions.
Special Operations LCO 3.10.1 allows specified TS requirements to be suspended to permit performances of these special operations, which otherwise could not be performed if required to comply with the requirements of these TS. Unless otherwise specified, all the other TS requirements remain unchanged. This will ensure all appropriate requirements of the MODE or other specified condition not directly associated with or required to be changed to perform the special operation will remain in effect.
The Applicability of a Special Operation LCO represents a condition not necessarily in compliance with the normal requirements of the TS.
Compliance with Special Operations LCOs is optional. A special operation may be performed either under the provisions of the appropriate Special Operation LCO or under the other applicable TS requirements. If it is desired to perform the special operation under the provisions of the Special Operation LCO, the requirements of the Special Operation LCO shall be followed.
Watts Bar - Unit 2 3.0-12 (developmental) Revision J CNL-14-180 E-20