Entergy Nuclear Northeast Entergy Nuclear Operations, Inc Vermont Yankee 185 Old Ferry Rd
~En tergy PO Box 500 Brattleboro, VT 05302 Tel 802-257-5271 October 29, 2002 BVY 02-86 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Subject:
Vermont Yankee Nuclear Power Station License No. DPR-28 (Docket No. 50-271)
Vermont Yankee Emergency Plan Implementing Procedure Changes In accordance with 10 CFR 50.54(q), enclosed are the latest changes to the Vermont Yankee Emergency Plan Implementing Procedures, OP 3540, Rev. 1, LPC#1 and OP 3545, Rev. 1, LPC# 1, the change memos and the 10 CFR 50.54(q) Evaluation Checklists. These changes were determined to not need prior NRC review and approval.
If you have any questions, please contact Audra Williams, Emergency Planning Coordinator, in our Brattleboro office at (802) 258-4177.
Sincerely, ENTERGY NUCLEAR NORTHEAST VERMONT YANKEE Lori Tkaczyk Emergency Planning Manager Attachments cc, USNRC Region 1 Administrator USNRC Resident Inspector - VYNPS USNRC Project Manager - VYNPS (no attachments)
David M. Silk, Senior Emergency Preparedness Specialist, USNRC Region 1 Vermont Department of Public Service
To:
Eplan Implementing Procedure Controlled Set Holders From: Diane McCu(],Art-7.
Date:
10/25/02 11-ý Re:
VY EPlan Implementing Procedure Change #210 Instruction Sheet jLPCs-The following LPC should be incorporated into the appropriate procedures:
Proc/Rev #
LPC #
Procedure Title OP 3540/1 1
Control Room Actions During an Emergency OP 3545/1 1
Activation of the EOF A POM I
VERMONT YANKEE NUCLEAR POWER STATION OPERATING PROCEDURE OP 3540 REVISION 1 CONTROL ROOM ACTIONS DURING AN EMERGENCY USE CLASSIFICATION: REFERENCE I-PC Effective Affected Pages No.
Date 1
10/04/02 App. A Pg 2 of 3; VYOPF 3540.06 Pg 1 of 2; VYOPF 3540.07 Pg 1 of 1 N Implementation Statement: N/A I
Issue Date:
06/06/02 OP 3540 Rev. 1 Page I of 15
APPENDIX A (Continued)
- 3.
Use the prepared message (VYOPF 3540.07) and make States notification as follows:
- a.
Contact each State using appropriate commercial telephone numbers listed below:
VT STATE POLICE: 9-1-802-244-8727 or 9-1-802-257-7101 or 9-1-802-875-2112 NH STATE POLICE: 9-1-603-271-3636 MA STATE POLICE: 9-1-413-584-3000
- b.
After transmittal of message, ensure that all appropriate information is recorded.
- c.
Monitor and receive expected commercial telephone verification of emergency declaration from State authorities.
- 4.
After all States' notifications are completed, immediately continue with NRC notifications.
NRC NOTIFICATION INSTRUCTIONS NOTE NRC notification must be initiated immediately after the States' notification, but not later than one (1) hour after the emergency classification declaration.
- 1.
Use the FT7S NRC Emergency Notification System (ENS) phone (labeled #41) located in the southwest comer of the TSC Communications Room.
- 2.
Notify the NRC on the FTS ENS phone as follows:
- a.
Lift the receiver on the telephone and listen for dial tone
- b.
After receiving a dial tone, dial the first number listed below using all 11 digits. If the first number is busy, then use the second, etc.
1-301-816-5100 1-301-951-0550 1-301-415-0550 NOTE Remember to inform the NRC Operations Center of the problems with using the FTS System.
- c.
If contact cannot be established using the FTS System, call the NRC Operations Center via the commercial telephone using the same numbers above in the order listed.
Appendix A OP 3540 Rev. 1 Page 2 of 3 LPC #1
EMERGENCY CLASSIFICATION AND PAR NOTIFICATION FORM VYOPF 3540.06 INSTRUCTIONS STATES NOTIFICATION MUST BE INITIATED WITHIN 15 MINUTES OF DECLARATION.
- 1.
Prepare message (Section 1). If a Protective Action Recommendation is part of the message, refer to VYOPF 3511.01 for affected towns.
- 2.
Prior to notifications, get approval of contents of message by getting appropriate signature (Section 2).
- 3.
Contact States by using appropriate contact number(s) listed below.
Record initial State contact times (Section 3).
After transmittal of message, record name of State contact (Section 4)
After all States notifications are completed, inform authorizing individual.
VYOPF 3540.06 OP 3540 Rev. 1 Page I of 2 LPC #1
- 4.
- 5.
6.
CONTACT NUMBERS CONTROL ROOM EOF/RC NAS - ORANGE PHONE VT/NH/MA STATE POLICE VT/NH/MA STATE EOCs GROUP CALL 111 333 NAS INDIVIDUAL STATION VT STATE POLICE VT STATE EOC CALL 213 314 NH STATE POLICE NH STATE EOC 212 311 MA STATE POLICE MA STATE EOC 210 313 COMMERCIAL TELEPHONE VT STATE POLICE VT STATE EOC BACKUP Primary - 802-244-8727 Switchboard - 802-244-8721 Alternate - 802-257-7101 or Direct Line - 802-241-5476 802-875-2112 NH STATE POLICE NH STATE EOC 603-271-3636 Switchboard - 603-271-2231 Direct Line - 603-223-3662 MA STATE POLICE MA STATE EOC 413-584-3000 Switchboard - 508-820-2000 Direct Line - 508-820-2075 LPI
STATES NOTIFICATION FOR A CONTROL ROOM EVACUATION VTSC a I
VT State Police:
NM State Police:
MA State Police:
Time Notification initiated:
9-1-802-244-8727 or 9-1-802-257-7101 or 9-1-802-875-2112 9-1-603-271-3636 9-1-413-584-3000 VT NH_
MA_
NOTE Bold text is the message ýontent to be provided to State authorities.
This is Name:
Title:
at the Vermont Yankee Nuclear Power Station in Vernon, Vermont. Please do not interrupt until the entire message is completed.
a) We have declared a Site Area Emergency at hours due to an Evacuation of the Control Room. (S-8-d) b) The Plant is shut down. (Use unless better information is known.)
c) A release is not expected to occur. (Use unless better information is known.)
d) Present meteorological conditions: wind speed is mph and wind direction is from degrees.
e) At the present time, we recommend the following protective actions:
NONE f)
Follow your State procedures for the designated classification.
PLEASE NOTE:
You are receiving this notification via commercial telephone. Verification phone number is
, Ext.
. Repeat. You are receiving this notification via commercial telephone. Verification phone number is-, Ext.
MESSAGE ACKNOWLEDGEMENTS (Record information)
Receipt by (print/sign):
VT Name:
Ni-Name:
MA Name:
Time:
Time:
Time:
REMARKS:
VYOPF 3540.07 OP 3540 Rev. 1 Page I of 1 LPC #1 NOTE If a warble tone is received when notifying the States using the 9-1-XXX-XXXX, the phone you are using is in the p6wi-fail mode. Re-dial without using the 9, and be sure to use the alternate powerfail number for verification.
VERMONT YANKEE NUCLEAR POWER STATION O'oPERATING'PROCiED.URE-OP 3545 REVISION 1 ACTIVATION OF THE EMERGENCY OPERATIONS FACILITY/RECOVERY CENTER (EOF/RC)
USE CLASSIFICATION: REFERENCE LPC Effective Affected Pages No.
Date 1
10/22/02 5 of 6 I
imlemetation Statement: N/A Issue Date:
06/06/02 OP 3545 Rev. 1 Page 1 of 6 LPC #1
PROCEDURE NOTE Steps may be performed concurrently or out of sequence.
Name (print):
Time/Date 1.0 Establish the Emergency Operations Facility /Recovery Center for activation. (See Figures 1 & 2)
NOTE Key staff are required to sign in on the staffing board in the SRM area.
2.0 Assign personnel as required to the various functions in the Emergency Operations facility. (Complete Table 1) 3.0 Prepare facilities for the arrival of off-site authorities and other support personnel.
3.1.
Obtain keys for the EOF Emergency Equipment Cabinets from the Training Building Security desk and open cabinets. (See Table 2) 3.2.
Organize equipment, status and mapboards per Figures 1 &2.
3.3.
Turn on ERFIS PCs (3) and monitors located at the EOF/RC (per Figures 1 & 2) and display current meteorological data.
3.3.1. Click on ODPS.
3.3.2. Click on Historical Meteorological Data - 1.
3.4.
Contact Shift Staffing & Relief Planning to have an individual from IT move the color printer located on second floor of the Training Bldg and connect it to the ERFIS PC in Room 126.
3.5.
Check radios per OP 3504, Section F.4.a. and Figures 6 and 10.
3.6.
Set up fax machines and test by faxing between both machines.
1 j I
/
OP 3545 Rev. I Page 5 of 6 LPC #1 Initials S
I I
'LPC
10 CFR 50.54(q) Evaluation Checklist List of Emergency Plan Section(s)/Emergency Plan Implementing Procedure(s) or any other document to be evaluated. (Include Title and Revision No.):
~j A~&e~b
- t. ioPf ID?
OP 3540, Rev..m, LPC #1 -
Control Room Actions During an Emergency A. Screening Evaluation Based on a review of the following questions, determine if the change has the potential to affect our ability to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.
A "YES" answer to any part of the questions requires that a written evaluation be done to determine whether the effectiveness of the Emergency Plan was decreased as specified in Section B of this checklist.
A "NO" answer to all questions requires no written evaluation as specified in Section B of this checklist.
- 1.
Could the proposed change affect our ability to meet the following standards of 10 CFR 50.47(b):
(1) Assignment of Emergency Response Organization responsibilities YES (2) Assignment of on-shift Emergency Response Organization personnel iN YES 00 (3)
Arrangements for Emergency Response Support and Resources YES NO (4)
Emergency Classification and Action levels, including facility system and effluent parameters Y
O YES Nt 2 (5)
Notification Methods and Procedures YES N
(6)
Emergency Communications among principal response organizations a the public YESO (7)
Public Education and Information YES (8)
Adequacy of Emergency Facilities and Equipment YES ý D
(9)
Adequacy of Accident Assessment methods, systems and equipment YES N
(10) Plume exposure pathway EPZ protective actions Y
(
YES (11) Emergency Worker Radiological Exposure Control YES (12) Medical Services for contaminated injured individuals (13) Recovery and Reentry Plans YES YES (14)
Emergency response periodic drills and exercises YES (15) Radiological Emergency Response Training YES (16) Plan development, review and distribution YES VYAPF 3532.01 AP 3532 Rev.
10 Page 1 of 3 RT No.
10.E06.171
10 CFR 50.54(q) Evaluation Checklist (Continued)
- 2.
Could the change affect our ability to meet the following requirements of Appendix E to 10 CFR 50.
(1)Section IV. A - Organization Y(
YES (2)
Section IV. B - Assessment Actions YES (3)Section IV. C - Activation of Emergency Organizations YES (4)Section IV. D - Notification Procedures YES N
(5)
Section IV. E -
Emergency Facilities and Equipment YES (6)
Section IV.
F - Training (7)Section IV. G - Maintaining Emergency Preparedness YES N
(8)
Section IV. H - Recovery YES N
B. Effectiveness Determination For each applicable (i.e., a "yes" answer specified) standard to 10 CFR 50.47(b) and Appendix E to 10 CFR 50 identified from Section A above, complete the evaluation form below to determine whether the change decreases the effectiveness of the Emergency Plan and whether it continues to meet the stated applicable standard or requirement.
A facsimile of the evaluation form may be used as needed and attached to this checklist.
For applcable item 10 CFR 50 LUA of Section A above, this change (DOES DOES NOTY decrease the effectiveness of the Emergency Plan and
=OES*DOES NOT) continue to meet the stated applicable standard or requirement.
BASIS FOR ANSWER:
CXL-Y urvýu a
MA -,VG~
Q V4-QLCý C1JLUflJW mTdn~uaiJ Jý VYAPF 3532.01 AP 3532 Rev.
10 Page 2 of 3
10 CFR 50.54(q) Evaluation Checklist (Continued)
C. Conclusion (Fill out appropriate information)
X The changes made do not decrease the effectiveness of the Emergency Plan and continue to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.
03 The changes made do decrease the effectiveness of the Emergency Plan and decrease our ability to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.
The following course of action is recommended:
O3 Revise proposed changes to meet applicable standards and requirements.
o3 Cancel the proposed changes.
0 Process proposed changes for NRC approval prior to implementation in accordance with 10 CFR 50.54(q).
D. Impact on Other Documents (TRM, Tech Specs)
Keywords used in search:
O This change does not affect any other documents.
Z This change does affect other documents.
Document(s) affected: Op 354L0, Section(s) affected: V*F 59t,(
__ *142 E.
Impact on the Updated FSAR Use AP 6036 to determine if the proposed E-Plan change modifies existing UFSAR information or requires the addition of new UFSAR information and initiate UFSAR change(s) as required.
Keywords used in UFSAR search:
Additional Comments:
Prepared By:
(d MV\\6) 6 L
rM 2,.-1
( Aj OQ,'L&?
ate:
(Print/ ign)
Reviewed By: L (i n*t/a n
Date:
(Emergency Plan Coordinator)(Print/§ign)
VYAPF 3532.01 AP 3532 Rev.
10 Page 3 of 3
10 CFR 50.54(q) Evaluation Checklist List of Emergency Plan Section(s)/Emergency Plan Implementing Procedure(s) or any other document to be evaluated. (Include Title and Revision No.):
OP 3545, Rev. 1, LPC#1, Activation 6f the Emergency Operations Facility/Recovery Center (EOF/RC)
A. Screening Evaluation Based on a review of the following questions, determine if the change has the potential to affect our ability to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.
A "YES" answer to any part of the questions requires that a written evaluation be done to determine whether the effectiveness of the Emergency Plan was decreased as specified in Section B of this checklist.
A "NO" answer to all questions requires no written evaluation as specified in Section B of this checklist.
I 1.
Could the proposed change affect our ability to meet the following standards of 10 CFR 50.47(b):
(1) Assignment of Emergency Response Organization responsibilities YES (2)
Assignment of on-shift Emergency Response Organization personnel YES N[N (3)
Arrangements for Emergency Response Support and Resources YES 0
YES (4) Emergency Classification and Action levels, including facility system and effluent parameters YES (5) Notification Methods and Procedures Y
YES (6)
Emergency Communications among principal response organizations and the public YES t (7) Public Education and Information YES (8) Adequacy of Emergency Facilities and Equipment YES
)
(9)
Adequacy of Accident Assessment methods, systems and equipment YES (10)
Plume exposure pathway EPZ protective actions YES (11) Emergency Worker Radiological Exposure Control YES (12) Medical Services for contaminated injured individuals YES (13) Recovery and Reentry Plans YES (14)
Emergency response periodic drills and exercises (15) Radiological Emergency Response Training YES (16) Plan development, review and distribution YES YESN VYAPF 3532.01 AP 3532 Rev.
10 Page 1 of 3 RT No.
10.E06.171
10 CFR 50.54(q) Evaluation Checklist (Continued)
- 2.
Could the change affect our ability to meet the following requirements of Appendix E to 10 CFR 50.
(1)Section IV. A - Organization (2)
Section IV. B - Assessment Actions (3)
Section IV. C - Activation of Emergency Organizations (4)
Section IV. D - Notification Procedures (5)
Section IV. E - Emergency Facilities and Equipment (6)
Section IV.
F - Training (7)
Section IV. G - Maintaining Emergency Preparedness (8)
Section IV.
H - Recovery YES YES YES YES YES YES N
YES YES B. Effectiveness Determination For applicable item 10 CFR 50 N/A of Section A above, this change (DOESLDOES NOTb decrease the effectiveness of the Emergency Plan and (DOE DOES NOT) continue to meet the stated applicable standard or requirement.
BASIS FOR ANSWER:
The changes made were to add formality by proceduralizing the step that IT already performs.
This does not decrease the effectiveness of the EPlan and continues to meet all requirements.
VYAPF 3532.01 AP 3532 Rev.
10 Page 2 of 3 For each applicable (i.e., a "yes" answer specified) standard to 10 CFR 50.47(b) and Appendix E to 10 CFR 50 identified from Section A above, complete the evaluation form below to determine whether the change decreases the effectiveness of the Emergency Plan and whether it continues to meet the stated applicable standard or requirement.
A facsimile of the evaluation form may be used as needed and attached to this checklist.
10 CFR 50.54(g) Evaluation Checklist (Continued)
C. Conclusion (Fill out appropriate information) 0 The changes made do not decrease the effectiveness of the Emergency Plan and continue to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.
0l The changes made do decrease the effectiveness of the Emergency Plan and decrease our ability to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.
The following course of action is recommended:
o]
Revise proposed changes to meet applicable standards and requirements.
El Cancel the proposed changes.
o3 Process proposed changes for NRC approval prior to implementation in accordance with 10 CFR 50.54(q).
D. Impact on Other Documents (TRM, Tech Specs)
Keywords used in search:
[3 This change does not affect any other documents.
El This change does affect other documents.
Document(s) affected:
Section(s) affected:
E.
Impact on the Updated FSAR Use AP 6036 to determine if the proposed E-Plan change modifies existing UFSAR information or requires the addition of new UFSAR information and initiate UFSAR change(s) as required.
Keywords used in UFSAR search:
Additional Comments:
Prepared By:
Reviewed By:
Audra Williams '5\\j3J.QL-sor~<
(Print/Sign)
(Emergency Plan Coordinator) (Print/Sign)
Date:
10/14/02 Date:
2..
,o VYAPF 3532.01 AP 3532 Rev.
10 Page 3 of 3