MONTHYEARML20217N3901999-10-25025 October 1999 Advises That Info Provided in & Affidavit Re Holtec Position Paper WS-115,rev 1,repts HI-87113, Rev 0,HI-87114,rev 0,HI-87102 Rev 0 & HI-87112,rev 0,marked Proprietary,Will Be Withheld from Public Disclosure ML20217L8591999-10-21021 October 1999 Discusses 990921 Request for Approval to Perform Alternative Testing as Part of Vermont Yankee Nuclear Power Station IST Program.Informs That Submittal Reviewed Against ASME Code Section XI Requirements & Forwards Safety Evaluation ML20217M1181999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217D9711999-10-13013 October 1999 Responds to Request That Information Titled Addl Info Re Cycle Specific SLMCPR for Vermont Yankee Cycle 21 Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station ML20217C1501999-10-0707 October 1999 Forwards Insp Rept 50-271/99-11 on 990809-27.No Violations Noted.Insp Focused on Effectiveness of Engineering Functions in Providing for Safe Operation of Plant BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20212J7891999-10-0404 October 1999 Informs That Licensee 980804,0628,29 & 990921 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Consider Subj GL to Be Closed for Plant ML20212J6501999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of VYNPS on 990913. No New Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues & Insp Plan Through Mar 2000 Encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-171999-09-28028 September 1999 Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 11999-09-21021 September 1999 Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing1999-09-21021 September 1999 Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested1999-09-21021 September 1999 Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal1999-09-20020 September 1999 Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal ML20212C1621999-09-17017 September 1999 Forwards Amend 175 to License DPR-28 & Safety Evaluation. Amend Revises TSs to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to Standby Liquid Control System BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-09-16016 September 1999 Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld1999-09-16016 September 1999 Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld ML20216F3171999-09-13013 September 1999 Forwards Insp Rept 50-271/99-06 on 990621-0801.One Violation Identified & Being Treated as Noncited Violation BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp1999-08-31031 August 1999 Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution1999-08-31031 August 1999 Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution ML20211G4791999-08-27027 August 1999 Forwards Notice of Withdrawal of 990420 Amend Request Re TS on Reloading & Unloading Sequence of Fuel in Reactor Core When All Fuel Removed from Core BVY-99-107, Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies1999-08-26026 August 1999 Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies ML20211E8841999-08-25025 August 1999 Requests That Licensee Provide bldg-specific Justification for Use of Method A.1 at Locations Where Amplification Significantly Exceeds 1.5 Limit Above 8 Hz ML20211E1371999-08-20020 August 1999 Forwards from J Bean to H Miller & FEMA Final Exercise Rept for 990427-29 Plume Exposure & Ingestion Pathway Exercise for Vermont Yankee Nuclear Power Station.No Deficiencies Noted.Areas Requiring C/A Identified ML20211H0851999-08-19019 August 1999 Forwards Insp Rept 50-271/99-12 on 990628-0711 & Nov. Violation Re Failure to Monitor Unavailability of Specific Sys,Structures & Components During Refueling Outage Did Not Allow Adequate Assessment of Maint Effectiveness BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered1999-08-19019 August 1999 Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-021999-08-18018 August 1999 Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 BVY-99-100, Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings1999-08-0202 August 1999 Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings ML20210M5791999-07-30030 July 1999 Responds to NRC 990726 Telcon Re Status of Resolution for USI A-46 Outliers.Written Summary,By Equipment Category, Listed ML20211E1701999-07-28028 July 1999 Forwards Copy of Final Exercise Rept for 990427-29,full- Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to VYNPS ML20210G5041999-07-27027 July 1999 Responds to NRC 990301 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Licensee Will Submit Info Re Proposed Sys Mod by 990916 ML20210J3031999-07-27027 July 1999 Submits Proposed Changes to Eals.Attachment 1 Provides Listing of Changes to EALs Along with Ref to Bases Documents Supporting Change ML20210G4271999-07-27027 July 1999 Forwards Testing Data & Associated Results for Fitness for Duty Program at Plant for 990101-0630 ML20216D7321999-07-26026 July 1999 Forwards Insp Rept 50-271/99-05 on 990510-0620.Two Viiolations Being Treated as Noncited Violations ML20209G2721999-07-14014 July 1999 Discusses Licensee Response to RAI Re GL 92-01,Rev 1,Suppl Suppl 1, Rv Structural Integrity, for Vermont Yankee Nuclear Power Station ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G6931999-07-14014 July 1999 Forwards Request for Addl Info Re Spent Fuel Storage Capacity Expansion ML20209G1531999-07-12012 July 1999 Discusses Util Setpoint Control Program Implementation Schedule,As Committed to in Licensee 990514 Response to Notice of Violation,Insp Rept 50-271/97-10 ML20196J2321999-06-30030 June 1999 Submits Input from Util Technical Staff Re Soil Disposal on-site Under 10CFR20.2002 & Expresses Interest in Pursuing Approval to Use Same Methodology (Implemented Through Util ODCM & Reported as Noted) If Possible ML20196J7421999-06-29029 June 1999 Informs NRC That Vygs Has Implemented Severe Accident Management,As Committed to in Licensee to NRC ML20209B6111999-06-29029 June 1999 Resubmits Summary of Vynp Commitments Page to Replace Original Page Submitted with Responding to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196J2431999-06-29029 June 1999 Informs That Author Received Call from NRR on Dirt Spreading Ltr & Questions Re Cover Ltr Statement Where Util Asks to Be Allowed to Dispose of Future Soil in Same Manner Provided Same Acceptance Criteria Met ML20209C3751999-06-28028 June 1999 Forwards non-proprietary Rev 16 to EPIP OP 3524, Emergency Actions to Ensure Initial Accountability & Security Response & Proprietary Rev 12 to EPIP OP 3531, Emergency Call-In Method. Proprietary Encl Withheld ML20209B5861999-06-28028 June 1999 Provides Alternative Y2K Readiness Status Described in Supplement 1 to GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure Rept Encl ML20196G5241999-06-22022 June 1999 Responds to Re Changes to Vermont Yankee Guard Training & Qualification Plan,Rev 8,Errata A.No NRC Approval Is Required.Encl Will Be Withheld from Public Disclosure Per 10CFR73.21 BVY-99-084, Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.7901999-06-18018 June 1999 Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.790 ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-171999-09-28028 September 1999 Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing1999-09-21021 September 1999 Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 11999-09-21021 September 1999 Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested1999-09-21021 September 1999 Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal1999-09-20020 September 1999 Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld1999-09-16016 September 1999 Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-09-16016 September 1999 Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp1999-08-31031 August 1999 Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution1999-08-31031 August 1999 Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution BVY-99-107, Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies1999-08-26026 August 1999 Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered1999-08-19019 August 1999 Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-021999-08-18018 August 1999 Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 BVY-99-100, Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings1999-08-0202 August 1999 Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings ML20210M5791999-07-30030 July 1999 Responds to NRC 990726 Telcon Re Status of Resolution for USI A-46 Outliers.Written Summary,By Equipment Category, Listed ML20211E1701999-07-28028 July 1999 Forwards Copy of Final Exercise Rept for 990427-29,full- Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to VYNPS ML20210G5041999-07-27027 July 1999 Responds to NRC 990301 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Licensee Will Submit Info Re Proposed Sys Mod by 990916 ML20210G4271999-07-27027 July 1999 Forwards Testing Data & Associated Results for Fitness for Duty Program at Plant for 990101-0630 ML20210J3031999-07-27027 July 1999 Submits Proposed Changes to Eals.Attachment 1 Provides Listing of Changes to EALs Along with Ref to Bases Documents Supporting Change ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G1531999-07-12012 July 1999 Discusses Util Setpoint Control Program Implementation Schedule,As Committed to in Licensee 990514 Response to Notice of Violation,Insp Rept 50-271/97-10 ML20196J2321999-06-30030 June 1999 Submits Input from Util Technical Staff Re Soil Disposal on-site Under 10CFR20.2002 & Expresses Interest in Pursuing Approval to Use Same Methodology (Implemented Through Util ODCM & Reported as Noted) If Possible ML20209B6111999-06-29029 June 1999 Resubmits Summary of Vynp Commitments Page to Replace Original Page Submitted with Responding to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196J7421999-06-29029 June 1999 Informs NRC That Vygs Has Implemented Severe Accident Management,As Committed to in Licensee to NRC ML20209C3751999-06-28028 June 1999 Forwards non-proprietary Rev 16 to EPIP OP 3524, Emergency Actions to Ensure Initial Accountability & Security Response & Proprietary Rev 12 to EPIP OP 3531, Emergency Call-In Method. Proprietary Encl Withheld ML20209B5861999-06-28028 June 1999 Provides Alternative Y2K Readiness Status Described in Supplement 1 to GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure Rept Encl BVY-99-084, Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.7901999-06-18018 June 1999 Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.790 ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML20195C5891999-05-27027 May 1999 Forwards Response to NRC 990301 RAI Re GL 96-05 Program at Vermont Yankee Nuclear Power Station ML20195D5341999-05-27027 May 1999 Forwards Description of Vermont Yankees Plans for Insp of & Mods to Certain Reactor Vessel Internals BVY-99-074, Forwards Application & Medical Certificate Required for Renewal of Jd Livingston,License OP-10049,RO License.Medical Certificate Withheld1999-05-26026 May 1999 Forwards Application & Medical Certificate Required for Renewal of Jd Livingston,License OP-10049,RO License.Medical Certificate Withheld ML20195B4081999-05-24024 May 1999 Withdraws Licensee Commitment,Contained in ,To Reinitiate ITS Project Following Completion of FSAR Accuracy Verification Project.Util Will Continue to Modify Current TS with Number of Improvements BVY-99-067, Informs That Bw Metcalf,License SOP-1761-9,has Retired from VYNPS & Will No Longer Require License.Nrc Is Requested to Terminate License1999-05-21021 May 1999 Informs That Bw Metcalf,License SOP-1761-9,has Retired from VYNPS & Will No Longer Require License.Nrc Is Requested to Terminate License ML20196L1801999-05-18018 May 1999 Withdraws Licensee & Attachment,Containing Rev 2 to Vermont Yankee Operational QA Manual, from Further Consideration by Nrc.Summary of Commitments Encl ML20206K3201999-05-0707 May 1999 Forwards Response to RAI Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment ML20206J2801999-04-30030 April 1999 Forwards 1998 Annual Financial Repts for CT Light & Power Co,Western Ma Electric Co,Public Svc Co of Nh,North Atlantic Energy Corp,Northeast Nuclear Energy Co & North Atlantic Energy Svc Corp,License Holders ML20206D3731999-04-27027 April 1999 Informs NRC of Changes in Recipients of NRC Docketed Correspondence ML20206B1401999-04-23023 April 1999 Forwards Replacement of Section 3(a) of NSHC Determination Provided by Re TS Proposed Change 208,suppl Section 6 ML20205S3381999-04-16016 April 1999 Submits Revised Schedule for Response to NRC 990226 RAI Re 980630 Submittal of IPEEE Rept.Info Will Be Submitted by 991231 ML20205S3891999-04-16016 April 1999 Forwards non-proprietary & Proprietary Revised Page to Holtec Rept HI-981932,supplementing TS Proposed Changed 207 Re Spent Fuel Pool Storage Capacity Expansion ML20205S3031999-04-15015 April 1999 Forwards Revised TS Bases Pages 90,227,164 & 221a,accounting for Change in Reload Analysis from Yaec to GE Methodology, Reflecting Change in Condensation Stability Design Criteria & Accounting for More Conservative Calculation ML20205P9291999-04-14014 April 1999 Requests That Rev to NRC 821029 SER for NUREG-0737,Item II.K.3.24,be Issued to Clarify Util Installed RCIC & HPCI HVAC Configuration,As Discovered During Preparation of DBDs for Sys ML20205P8191999-04-13013 April 1999 Forwards Rev 2 to COLR for Vermont Yankee Cycle 20, Dtd Feb 1999,IAW TS Section 6.7.A.4 ML20205M3191999-04-0707 April 1999 Forwards 1998 Annual Rept of Results of Individual Monitoring, Per 10CFR20.2206(b).Licensee Is Submitting Matl to Only Addressee Specified in 10CFR20.2206(c).Without Encl ML20205K0351999-03-31031 March 1999 Informs That Certain Addl Corrections Warranted for 990121 SER for Amend 163 to License DPR-28 Re Suppression Pool Water Temp.Suggested Corrections Listed ML20205K1821999-03-31031 March 1999 Informs of Modifications That Util Made to CO(2) Fire Suppression Sys,Due to Sen 188 Which Occurred at Ineel on 980728.Compensatory Actions Will Remain in Place Until Modifications Are Complete & Systems Are Returned to Svc ML20206A6951999-03-29029 March 1999 Request Confirmation That No NRC Action or Approval,Required Relative to Proposed Change in Upstream Economic Ownership of New England Power Co,Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee 1999-09-29
[Table view] |
Text
..
~.
i L -c VERMONT YANKEE NOCLEAR POWER CORPORATION l
j .
p Ferry Road, Brattleboro, VT 05301-7002
/ ENGINEE I OFFICE 560 MA!N STREET
- BOL TON, MA 01740
- (508s779-6711 December 7,1992 l BVY 92136
I
-United States Nuclear Regulatory Commission l- ATTN: Document Control Desk l- Washington, DC 20555 i
References:
a) License No. DPR 28 (Docket No. 50-271) i- b) - Letter, USNRC to VYNPC, Electrical Distribution System
- l- Functional Inspection of Vermont-Yankee, Report t
No. 50-271/92-81, dated September 30,1992
!' c) NUMARC 90-12, " Design Basis Program Guidelines",
dated October 1990 '
, d)_ Letter VYNPC to.USNRC, BVY 92124, Response to NRC 2- - Electrical Distribution System Functional inspection 'of
- Vermont Yankee, Report No. 50-271/92-81, Reply to
! Apparent Violations, dated October _30,1992
- j. e) Letter VYNPC to USNRC, BVY 91-88, Station Blackout i (SBO) Supplemental Information on Coping Assessment,
[ dated September 30,1991-
Subject:
Response'to NRC Electrical. Distribution System Function -
- ' Inspection of Vermont Yankee, Report No. 50-271/92-81, j - Unresolved items and Other_lasues _
[
Dear Sir:
i l- This letter provides information requested by Reference' b) to:
F
- 1) Provide our resolution and conclusions on unresolved items pertaining.
, . to degraded grid relay settings and desel generator fuel oil transfer,_
t
' 2) Provide our schedule for resolution of the other issues identified at the - l
. exit meeting.
l i
- 14005?
j2A"*18acM*h o OI'
l
, VERMONT YANKEE NUCLEAR POWER CORPORATION U.S. Nuclear Regulatory Commission December 7,1992 Page 2 The degraded grid and fuel oli transfer unresolved items are addressed in Attachments A and B respectively. Attachment C to this letter provides our current schedule for resolution of all the items. If you have any further questions regarding these items, please contact Mike Metell (802-257 5271, Ext. 218) in my office.
Very truly yours, Vermont Yankee Nuclear Power Corporation PW James P. Pelletler Vice President, Engineering cc: USNRC Region l Administrator
- USNRC Resident inspector - VYNPS USNRC Project Manager - VYNPS
{
l
ATTACHMENT A DEGRADED GRID RELAYS Section 3.3 - Separation from Preferred Power Source - Item 92-81 04
.... In response to the NRC concerns, the licensee stated that they were now reassessing the degraded grid relay setpoint bases. This reassessment emerged as a scheduled work activity as a result of surveillance testing performed during the March 1992 plant outage when these setpoints were observed to have drifted outside the technical specification limits. The licensee also indicated that completion of a new voltage regulation analysis was expected by the end of 1992.
In view of the above, the acceptability of voltage regulation is unresolved pending the licensee's preparation of appropriate analyses addressing the potential spurious grid separations described above (50-271/92-81-04).
RESPONSE
We agree with the EDSFl inspection team that for 110KV/340KV minimum design line voltage in combination with maximum 4KV bus loading and concurrent accident signal, Vermont Yankee could be disconnected from the preferred power source and could be subject to an out of phase closure of a diesel generator breaker.
To address the postulated condition, Vermont Yankee has taken the following immediate actions:
- Vermont Yankee has examined worst case plant loadings and determined these loadings can only occur when the cooling towers are on line. Vermont Yankee has determined that without this cooling tower load, the postulated event should not occur.
Additionally, we have examined actual minimum / maximum voltages currently supplied by NEPEX (New England Power Exchange) and compared this data to those values used in our voltage regulation analysis. We have determined that the original voltage values used in our analysis were based on very conservative historical limits. We estimate that our actual minimum line voltages are about 115KV and 345KV respectively (versus 110KV and 340KV used in our original analysis). We estimate that our normal line voltages are typically greater than 117KV and 354KV respectively. Based on these more realistic values, Vermont Yankee has not, and does not anticipate being subject to the grid separation event as postulated in Reference b).
- - - - - - . - . = . . _. -
.. l 4
i Our short and long term actions are as follows:
- Short term actions - Vermont Yankee has contacted NEPEX and has initiated discussions on changing NEPEX procedures to ensure that minimum supplied line voltages are specified/ maintained at 115KV/345KV levels. Other New England nuclear stations have pursued and secured similar requested change's. -We will also complete the in-house voltage regulation study using the new limits.
We anticipate that these changes can be accomplished by Spring 1993.
~
- Lona term actions - Vermont Yankee plans to investigate other
- potential improvements which could further ensure preferred power _
source availability. These include a) limited shedding of nonessential loads such as the cooling towers; b) replacement of _the degraded grid relays with models that have narrower reset. tolerances; c) modification
. of the initiation' logic of the degraded grid relays. The need for any improvements beyond the short term actions to be taken will also be considered. These investigations are scheduled to be completed by the Fall of 1994.
. I
l 7 .
l ATTACHMENT B j
DIESEL GENERATOR FUEL OIL TRANSFER SYSTEM l
j Section 4.2.1 - Fuel Oil Transfer Pump Submersion - Item 92-81 09 i
l During a walkdown of the fuel oil transfer pump house, the team noted that the pumps were located in a single pit adjacent to the storage tank pit. They also l observed that a conduit penetrating the_ wall between the two pits had not
! been sealed. Because of the pumps vulnerability to common mode failure due to flooding, the team asked the licensee to address maximum flood level, tank i rupture resulting from a design basis missile, and qualification of pump motors for submersion. The licensee's preliminary review indicated that the maximum flood level was severalinches below the pump house access door.and the rim j around the tank pit. However,if the tank contained more than 68,000 gallons, i a rupture of the tank at or-below ground level could flood the tank pit above l the 8' 4" level of the conduit penetration-and hence the pump room. The i pump motors were not quallfled for submersion.
In view of the above, the capability of the transfer pumps to operate in tN event of the postulated tank rupture is an unresolved item pending -the j licensee's further evaluation of the issue and NRC review (50 271/92-81-09).
i
[ RESPONSE Vermont Yankee has determined that the only design purpose for the above mentioned -
l wall penetration is to provide accecs for the subject conduit.--To enhance the existing L berm oil retention capability, the subject conduit-is scheduled to be-sealed by I
December 15,1992. We conclude that this enhancement addresses all flooding / pump l submersion items.
Section 3.2.1 - Fuel Oil Temperature Control - Item 92-81-10 i
.... Although, on the basis of the temperature specified in Section 10.12.3 of -
the FSAR, the requirements.of the fuel oil procurement specification met those
! of the ASTM Standard and, hence, those of the Technical Specification, the team expressed concern for those times when the temperature fell below the i pour point of the oil. Extended severe weather conditions could cause gelling;
- of the fuel oil and clogging of both transfer pump strainers. Vermont Yankee's cold weather procedure, OP 2196 required that the temperature'of fuel oil at 4
the pump suction be noted once each shift. However, the primary purpose of-the temperature reading was to ascertain the operability of the heat tracing, i
i
- _ _ .- - _ , _ . _ , . _ _ .s. ,.
l i
.... The inspectors agreed that the mass of the oil would retard gelling, but noted that this and past experience with fuel analysis could not be used to ensure that a common mode failure of the fuel transfer system would not occur. Therefore fluidity of the fuel oil is unresolved pending appropriate j analysis and corrective actions by the licensee (50 271/92 81-10).
j RESPONSE Vermont Yankee will enhance OP 3140 " Alarm Response" by December 15,1992 to alert the operators of potential loss of fuel oil transfer capability for sub zero weather conditions. Specifically:
- We have analyzed fuel usage in sub zero weather, and have determined i that fuelis transferred about once every two hours to meet house heating s needs. Therefore by monitoring the house heating boiler day tank level (via level alarm switch LSL-108-6B), we effectively and automatically monitor fuel oil transfer. We will update OP 3140 to note that if alarm switch LSL-108-6B is alarmed, that fuel oil transfer /EDG operability may be impacted.
- To aid the operator in troubleshooting the LSL-108-6B alarm, we have also updated OP 3140 to compare the pump suction line temperature during transfer, to the fuel oil tank oil pour point (0 degree F
, specification,-10 to -20 degrees F typical actual values) if fuel oil transfer
- gelling is suspected. During fuel oil transfer, representative internal storage tank oil temperatures can be read at the fuel oil transfer pump suction line sensor.
We have also examined the potential for analytically predicting, under severe cold weather conditions, when the fuel oil gelling potential could be a problem. We have determined that:
- A pure analytical model may not give the desired accurracy, relative to the large number of variables to be considered, such as radiational cooling, air temperature, underground heat' transfer, wind heat loss, precipitation, etc.
- Collecting data at the above mentioned conditions and tank oil temperature during transfer would allow evaluation of the potential for fuel oil gelling.
We have decided to collect and analyze this data during the 1992-1993 winter season.
Please note that Vermont Yankee does not anticipate an oil transfer problem in that we have transferred fuel oil successfully without gelling for the past 20 years of 4
operation, including severe sustained cold spells. We have concluded that these actions provide sufficient warning of a possible fuel oil gelling problem and address this issue.
Section 3.2.1 - Fuel Oil Transfer Pipino Damaae ltem 92-81-11 During a walkdown of-the fuel oil transfer system, the team noted that approximately 15 feet of transfer piping downstream of each pump had been Installed within inches- from - each other, outside the pump house. No protection had been provided against external damage from hazar_ds in the area, e.g. backing up vehicle or missile during a tornado. The piping was in an exposed area adjacent to a roadway. The team was concerned that damage from such hazards might cause a common mode failure of both fuel oil supply lines and the shutdown of both EDGs upon depletion of the 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> supply of fuel oil stored in the day tanks.
The licensee was not able to satisfactorily address the issue during the inspection. Therefore this item is an unresolved item pending review by the licensee (50-271/92-81-11).
RESPONSE
We agree with the EDSFilnspection Team that enhancing protection of these lines can improve their safety performance. On this basis, Vermont Yankee has completed the following actions:
- Fuel Oil Transfer Line Vehicle - Protection - Vermont -Yankee has determined that vehicle traffic could impact fuel oil transfer line performance. Therefore, during November 1992, -Vermont Yankee completed installation of vehicle barrier protection for these fuel oil transfer lines.
- Tornado impact on Fue! Oil Tonsfer Line Assessment .- We have reviewed this concern relative to -our Station Blackout response
! (Reference e). The probability of experiencing a tornado at Vermont Yankee is about 2 E-05 occurrence per year (i.e.'9.8 E-S occurrence pe-year per square mile). We. estimate that the probability of damage occurring at these lines (based on previous similar studies and Reference e),if Vermont Yankee experienced a tornado, would be less than 1 E-06.
This is sufficiently small, such that further immediate action-_is not warranted at this time. Vermont _ Yankee will more formally address this item in our IPEEE Program.
i i.
4 Attachment C- Schedule for Addressina EDSFI Items Planned Completion Date Separation from Preferred Power Source Analysis immediate Complete Unresolved item 1 -(50-271/ 92-81-04) Short term Spring 93 Long term Fall 94 Diesel Generator Loading Analysis Summer 93 Unresolved item 2 - (50-271/ 92-81-05) 120 Vac Protective Devices Coordination Analysis Winter 93/94 Unresolved item 3 -(50-271/ 92-81-06) 125 Vdc Protective Devices Coordination Analysis Fall 93 Unresolved item 4 - (50-271/ 92-81 07)
DC Bus Cross Connections Analysis Spring 93 Unresolved item 5 - (50-271/ 92-81-08)
Fuel Oil Transfer Pump Submersion - Hardware Upgrade Dec 15,1992 Unresolved item 6 (50-271/92-81-09)
Fuel Oil Temperature Control- Procedural Enhancement Dec 15,1992 Unresolved item 7 (50-271/92-81 10)
Fuel Oil Transfer Piping Damage - Short term analysis Complete Unresolved item 8 - (50-271/ 92-81 11) - Hardware Upgrade Complete
- IPEEE calculation Spring 95 Diesel Generator Room Temperature Calculation Feb 93 Unresolved item 9 -(50-271/ 92-81-12)
- Battery Room Ventilation Calculation Spring 93 l Unresolved item 10-(50-271/ 92-81 13) l Cable Ampacity Calculation Summer 94
- 120 Vac Control Circuit Analysis Winter 93/94 L
AC System Short Circuit Analysis Spring 93 120 Vac Voltage Drop Study Winter 93/94 125 Vdc Voltage Drop Study Spring 94 l Switchgear Room Ventilation Calculation Feb 93 Note 1: In accordance with NUMARC 90-12 (Reference c) and noted in Reference b), Vermont Yankee had already scheduled many of the above enhancements, l .
Note 2: The above schedule is for Vermont Yankee planning purposes only. Vermont Yankee does not consider this schedule as a commitment. It may be adjusted based on arising priorities.
-. .- . -.