Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N3901999-10-25025 October 1999 Advises That Info Provided in & Affidavit Re Holtec Position Paper WS-115,rev 1,repts HI-87113, Rev 0,HI-87114,rev 0,HI-87102 Rev 0 & HI-87112,rev 0,marked Proprietary,Will Be Withheld from Public Disclosure ML20217L8591999-10-21021 October 1999 Discusses 990921 Request for Approval to Perform Alternative Testing as Part of Vermont Yankee Nuclear Power Station IST Program.Informs That Submittal Reviewed Against ASME Code Section XI Requirements & Forwards Safety Evaluation ML20217M1181999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217D9711999-10-13013 October 1999 Responds to Request That Information Titled Addl Info Re Cycle Specific SLMCPR for Vermont Yankee Cycle 21 Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station ML20217C1501999-10-0707 October 1999 Forwards Insp Rept 50-271/99-11 on 990809-27.No Violations Noted.Insp Focused on Effectiveness of Engineering Functions in Providing for Safe Operation of Plant BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20212J7891999-10-0404 October 1999 Informs That Licensee 980804,0628,29 & 990921 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Consider Subj GL to Be Closed for Plant ML20212J6501999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of VYNPS on 990913. No New Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues & Insp Plan Through Mar 2000 Encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-171999-09-28028 September 1999 Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 11999-09-21021 September 1999 Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing1999-09-21021 September 1999 Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested1999-09-21021 September 1999 Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal1999-09-20020 September 1999 Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal ML20212C1621999-09-17017 September 1999 Forwards Amend 175 to License DPR-28 & Safety Evaluation. Amend Revises TSs to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to Standby Liquid Control System BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-09-16016 September 1999 Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld1999-09-16016 September 1999 Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld ML20216F3171999-09-13013 September 1999 Forwards Insp Rept 50-271/99-06 on 990621-0801.One Violation Identified & Being Treated as Noncited Violation BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp1999-08-31031 August 1999 Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution1999-08-31031 August 1999 Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution ML20211G4791999-08-27027 August 1999 Forwards Notice of Withdrawal of 990420 Amend Request Re TS on Reloading & Unloading Sequence of Fuel in Reactor Core When All Fuel Removed from Core BVY-99-107, Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies1999-08-26026 August 1999 Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies ML20211E8841999-08-25025 August 1999 Requests That Licensee Provide bldg-specific Justification for Use of Method A.1 at Locations Where Amplification Significantly Exceeds 1.5 Limit Above 8 Hz ML20211E1371999-08-20020 August 1999 Forwards from J Bean to H Miller & FEMA Final Exercise Rept for 990427-29 Plume Exposure & Ingestion Pathway Exercise for Vermont Yankee Nuclear Power Station.No Deficiencies Noted.Areas Requiring C/A Identified ML20211H0851999-08-19019 August 1999 Forwards Insp Rept 50-271/99-12 on 990628-0711 & Nov. Violation Re Failure to Monitor Unavailability of Specific Sys,Structures & Components During Refueling Outage Did Not Allow Adequate Assessment of Maint Effectiveness BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered1999-08-19019 August 1999 Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-021999-08-18018 August 1999 Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 BVY-99-100, Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings1999-08-0202 August 1999 Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings ML20210M5791999-07-30030 July 1999 Responds to NRC 990726 Telcon Re Status of Resolution for USI A-46 Outliers.Written Summary,By Equipment Category, Listed ML20211E1701999-07-28028 July 1999 Forwards Copy of Final Exercise Rept for 990427-29,full- Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to VYNPS ML20210G5041999-07-27027 July 1999 Responds to NRC 990301 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Licensee Will Submit Info Re Proposed Sys Mod by 990916 ML20210J3031999-07-27027 July 1999 Submits Proposed Changes to Eals.Attachment 1 Provides Listing of Changes to EALs Along with Ref to Bases Documents Supporting Change ML20210G4271999-07-27027 July 1999 Forwards Testing Data & Associated Results for Fitness for Duty Program at Plant for 990101-0630 ML20216D7321999-07-26026 July 1999 Forwards Insp Rept 50-271/99-05 on 990510-0620.Two Viiolations Being Treated as Noncited Violations ML20209G2721999-07-14014 July 1999 Discusses Licensee Response to RAI Re GL 92-01,Rev 1,Suppl Suppl 1, Rv Structural Integrity, for Vermont Yankee Nuclear Power Station ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G6931999-07-14014 July 1999 Forwards Request for Addl Info Re Spent Fuel Storage Capacity Expansion ML20209G1531999-07-12012 July 1999 Discusses Util Setpoint Control Program Implementation Schedule,As Committed to in Licensee 990514 Response to Notice of Violation,Insp Rept 50-271/97-10 ML20196J2321999-06-30030 June 1999 Submits Input from Util Technical Staff Re Soil Disposal on-site Under 10CFR20.2002 & Expresses Interest in Pursuing Approval to Use Same Methodology (Implemented Through Util ODCM & Reported as Noted) If Possible ML20196J7421999-06-29029 June 1999 Informs NRC That Vygs Has Implemented Severe Accident Management,As Committed to in Licensee to NRC ML20209B6111999-06-29029 June 1999 Resubmits Summary of Vynp Commitments Page to Replace Original Page Submitted with Responding to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196J2431999-06-29029 June 1999 Informs That Author Received Call from NRR on Dirt Spreading Ltr & Questions Re Cover Ltr Statement Where Util Asks to Be Allowed to Dispose of Future Soil in Same Manner Provided Same Acceptance Criteria Met ML20209C3751999-06-28028 June 1999 Forwards non-proprietary Rev 16 to EPIP OP 3524, Emergency Actions to Ensure Initial Accountability & Security Response & Proprietary Rev 12 to EPIP OP 3531, Emergency Call-In Method. Proprietary Encl Withheld ML20209B5861999-06-28028 June 1999 Provides Alternative Y2K Readiness Status Described in Supplement 1 to GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure Rept Encl ML20196G5241999-06-22022 June 1999 Responds to Re Changes to Vermont Yankee Guard Training & Qualification Plan,Rev 8,Errata A.No NRC Approval Is Required.Encl Will Be Withheld from Public Disclosure Per 10CFR73.21 BVY-99-084, Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.7901999-06-18018 June 1999 Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.790 ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-171999-09-28028 September 1999 Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing1999-09-21021 September 1999 Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 11999-09-21021 September 1999 Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested1999-09-21021 September 1999 Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal1999-09-20020 September 1999 Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld1999-09-16016 September 1999 Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-09-16016 September 1999 Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp1999-08-31031 August 1999 Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution1999-08-31031 August 1999 Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution BVY-99-107, Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies1999-08-26026 August 1999 Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered1999-08-19019 August 1999 Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-021999-08-18018 August 1999 Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 BVY-99-100, Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings1999-08-0202 August 1999 Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings ML20210M5791999-07-30030 July 1999 Responds to NRC 990726 Telcon Re Status of Resolution for USI A-46 Outliers.Written Summary,By Equipment Category, Listed ML20211E1701999-07-28028 July 1999 Forwards Copy of Final Exercise Rept for 990427-29,full- Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to VYNPS ML20210G5041999-07-27027 July 1999 Responds to NRC 990301 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Licensee Will Submit Info Re Proposed Sys Mod by 990916 ML20210G4271999-07-27027 July 1999 Forwards Testing Data & Associated Results for Fitness for Duty Program at Plant for 990101-0630 ML20210J3031999-07-27027 July 1999 Submits Proposed Changes to Eals.Attachment 1 Provides Listing of Changes to EALs Along with Ref to Bases Documents Supporting Change ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G1531999-07-12012 July 1999 Discusses Util Setpoint Control Program Implementation Schedule,As Committed to in Licensee 990514 Response to Notice of Violation,Insp Rept 50-271/97-10 ML20196J2321999-06-30030 June 1999 Submits Input from Util Technical Staff Re Soil Disposal on-site Under 10CFR20.2002 & Expresses Interest in Pursuing Approval to Use Same Methodology (Implemented Through Util ODCM & Reported as Noted) If Possible ML20209B6111999-06-29029 June 1999 Resubmits Summary of Vynp Commitments Page to Replace Original Page Submitted with Responding to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196J7421999-06-29029 June 1999 Informs NRC That Vygs Has Implemented Severe Accident Management,As Committed to in Licensee to NRC ML20209C3751999-06-28028 June 1999 Forwards non-proprietary Rev 16 to EPIP OP 3524, Emergency Actions to Ensure Initial Accountability & Security Response & Proprietary Rev 12 to EPIP OP 3531, Emergency Call-In Method. Proprietary Encl Withheld ML20209B5861999-06-28028 June 1999 Provides Alternative Y2K Readiness Status Described in Supplement 1 to GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure Rept Encl BVY-99-084, Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.7901999-06-18018 June 1999 Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.790 ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed ML20195C5891999-05-27027 May 1999 Forwards Response to NRC 990301 RAI Re GL 96-05 Program at Vermont Yankee Nuclear Power Station ML20195D5341999-05-27027 May 1999 Forwards Description of Vermont Yankees Plans for Insp of & Mods to Certain Reactor Vessel Internals BVY-99-074, Forwards Application & Medical Certificate Required for Renewal of Jd Livingston,License OP-10049,RO License.Medical Certificate Withheld1999-05-26026 May 1999 Forwards Application & Medical Certificate Required for Renewal of Jd Livingston,License OP-10049,RO License.Medical Certificate Withheld ML20195B4081999-05-24024 May 1999 Withdraws Licensee Commitment,Contained in ,To Reinitiate ITS Project Following Completion of FSAR Accuracy Verification Project.Util Will Continue to Modify Current TS with Number of Improvements BVY-99-067, Informs That Bw Metcalf,License SOP-1761-9,has Retired from VYNPS & Will No Longer Require License.Nrc Is Requested to Terminate License1999-05-21021 May 1999 Informs That Bw Metcalf,License SOP-1761-9,has Retired from VYNPS & Will No Longer Require License.Nrc Is Requested to Terminate License ML20196L1801999-05-18018 May 1999 Withdraws Licensee & Attachment,Containing Rev 2 to Vermont Yankee Operational QA Manual, from Further Consideration by Nrc.Summary of Commitments Encl ML20206K3201999-05-0707 May 1999 Forwards Response to RAI Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment ML20206J2801999-04-30030 April 1999 Forwards 1998 Annual Financial Repts for CT Light & Power Co,Western Ma Electric Co,Public Svc Co of Nh,North Atlantic Energy Corp,Northeast Nuclear Energy Co & North Atlantic Energy Svc Corp,License Holders ML20206D3731999-04-27027 April 1999 Informs NRC of Changes in Recipients of NRC Docketed Correspondence ML20206B1401999-04-23023 April 1999 Forwards Replacement of Section 3(a) of NSHC Determination Provided by Re TS Proposed Change 208,suppl Section 6 ML20205S3381999-04-16016 April 1999 Submits Revised Schedule for Response to NRC 990226 RAI Re 980630 Submittal of IPEEE Rept.Info Will Be Submitted by 991231 ML20205S3891999-04-16016 April 1999 Forwards non-proprietary & Proprietary Revised Page to Holtec Rept HI-981932,supplementing TS Proposed Changed 207 Re Spent Fuel Pool Storage Capacity Expansion ML20205S3031999-04-15015 April 1999 Forwards Revised TS Bases Pages 90,227,164 & 221a,accounting for Change in Reload Analysis from Yaec to GE Methodology, Reflecting Change in Condensation Stability Design Criteria & Accounting for More Conservative Calculation ML20205P9291999-04-14014 April 1999 Requests That Rev to NRC 821029 SER for NUREG-0737,Item II.K.3.24,be Issued to Clarify Util Installed RCIC & HPCI HVAC Configuration,As Discovered During Preparation of DBDs for Sys ML20205P8191999-04-13013 April 1999 Forwards Rev 2 to COLR for Vermont Yankee Cycle 20, Dtd Feb 1999,IAW TS Section 6.7.A.4 ML20205M3191999-04-0707 April 1999 Forwards 1998 Annual Rept of Results of Individual Monitoring, Per 10CFR20.2206(b).Licensee Is Submitting Matl to Only Addressee Specified in 10CFR20.2206(c).Without Encl ML20205K0351999-03-31031 March 1999 Informs That Certain Addl Corrections Warranted for 990121 SER for Amend 163 to License DPR-28 Re Suppression Pool Water Temp.Suggested Corrections Listed ML20205K1821999-03-31031 March 1999 Informs of Modifications That Util Made to CO(2) Fire Suppression Sys,Due to Sen 188 Which Occurred at Ineel on 980728.Compensatory Actions Will Remain in Place Until Modifications Are Complete & Systems Are Returned to Svc ML20206A6951999-03-29029 March 1999 Request Confirmation That No NRC Action or Approval,Required Relative to Proposed Change in Upstream Economic Ownership of New England Power Co,Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee 1999-09-29
[Table view] |
Text
__ _ . _ _ . _ _ _ _ - _ - _ _ . _ - _ . . _ _ _ . _ _ _ _ _ _ _ _ .
1
- l 1
VERMONT YANKEE 1
. NUCLEAR POWER CORPORATION i )
Ferry Road. Brattleboro, VT 053017002 ENGmbbo orriCE
%'Yfq . ~ . , .
rmon uww l /"Q) .
6 lo 7 7'J U l t
]
I June 22,1992 BVY 92 071
! U.S. Nuclear Regulatory Commission Washington, D.C. 20555 5
1 Attention: Document Control Desk i
References:
a) License No. DPR 28 (Docket No. 50-271) b) Letter, USNr0 to VYNPC, inspection Report 92 80, dated 4/20/92
Dear Sir:
j
Subject:
Response to inspection Report 92 80 This letter is written to respond to the weaknesses identified by an NRC Emergency Operatirig Procedure (EOP) Inspection Team during the special announced safety inspection conducted from
< February 24 to February 28,1992, and documented in Reference b).
1 3 We were pleased to leern that the inspection team found the Vermont Yankee EOP program much improved and trending in a positive direction. We anticipate further improvements as a result of implementing corrective actions in response to the Identified weaknesses, as well as from further dialogue on the remaining open items.
Information is submitted in the accompanying attachments in response to the identified l
weaknesses in (1) thn fechnical adequacy of the Vermont Yankee Plant Specific Technical Guidelines (PSTGs) EOPs, and Heactor Pressure Vessel Control guideline and (2) the EOP programmatic controls as noted in Sections 3.1,3.2,3.3 and 4.2 and Sections 6.1 and 6.2, respectively, of Reference b).
Also included with our response is our t Jrspective of the root cause:: cf th9se items, it is our intent to fully resolve all issues related to both the specific weaknesses identified by the NRC inspection as j well as those arising from the root cause analysis within an updated Procedure Generation Package i
(PGP) and revised OEs and other plant operating procedures. Further, we will pursue resolutions of the appropriate items by continued participation in the cognizant industry groups (i.e., BWROG Emergency Procedures Committee, NUMARC Severe Accident Working Group, etc.).
To insure that our resolutions are responsive to the issues ideritified in Reference b), it is our desire to meet with NRC's inspection team members to review them, to have additional discussion on L the remaining open issues, and to clarify your concerns identified in Reference b), sections 4.3, 5.1, 5.2, and 5.3. Further, we wish to confirm our understanding of the unspecified discrepancies requiring resolution, such as those implied by the lead paragraph of Attachment 3 to Reference b).
,c - q
< u o J a ,), ,
9206260229 920622 //. '
PDR ADOCK 05000271 PDR
/- p g G
/:
_ _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ . _ _ _ . . _ _ . . _ _ _._. __ _ _ _ __ __ _ _ -~
4 VERMONV YANKEE NUCL EAR POWER CORPORATION 1 .
I . U.S. Nuclear Regulatory Commission
! June 22,1992 j Page 2 4
i i Following submittal of this letter, a member of our staff willinitiate contact with NRC Region i to arrange for a meeting at a ilme and date that is mutually acceptable.
4
< We expect to incorporate the updates to the PGP and the EOPs, including correction of l deficiencies concerning OE 3:00, " Scram Procedure", and the " Torus Temperature Control" l guldeline, such that they may be used for training beginning in February 1993. Implementation will be completed and revised procedures will be issued following operator training in 1993. The
- documentation will be maintained at our facility and will be available for Inspection. Also as agreed 3- earlier, a sufficient quantity of borax required by OE 3107, Appendix J, has been obtained.
We believe that the actions proposed are responsive to your concerns; however, should you have any further questions, please do not hesitate to contact us, f
Very truly yours, 3
Vermont Yankee Nuclear Power Corporation a
w 2 j Warren P. Murp L Senior Vice Pr 'ident, Operatio s /
1 a
l cc: USNRC Region l Administrator USNRC Resident inspector VYNPS
}
USNRC Project Manager VYNPS 4 .
l l
i 4
1 4
--vs- i-,__.,.3_-- ,y... .. -p .- y , --- ,. ,, - - ,,, , ,, _ ,,.-.,w .,_,,.,,m.-..,, ~~ c.- - - --, , ~ ,
4 ROOT CAUSE ANALYSIS AND CORRECTIVE ACTION PLAN
SUMMARY
OF NRC FINDINGS RELATIVE TO TECHNICAL ADEOUACY:
Discrepancies were identified in the VY PSTGs that detract from the technical adequacy of the VY accident mitigation strategies. Additionally, some problems were noted with the technical adequacy of the EOPs and EOP support procedures, including some minor inconsistencies between the VY PSTGs and EOPs. The technical adequacy of the VY PSTGs, EOPs and EOP support procedures is considered to be unresolved pending licensee review and resolution (Sections 3.1,3.2, and 3.3).
VY RESPONSE:
Sections 3.1,3.2, and 3.3 of the inspection report contain a total of 45 comments. Vermont Yankee will resolve 37 of these weaknesses, criticisms, or acceptable alternatives to our current technical justifications by appropriate revision of the PGP, OEs, and support procedures as identified in the attached matrix.
To ensure that our resolutions are responsive to the issues identified in Reference b), it is our desire to meet with NRC's inspection team members to review our intended resolution of the identified issues, to have additional discussion on the remaining open issues, and to clarify your concerns identified in Reference b), Sections 4.3,5.1,5.2, and 5.3. Further, we wish to confirm our understanding of the unspecified discrepancies requiring resolution, such as those implied by the lead paragraph of Attachment 3 to Reference b).
ROOT CAUSE:
We have conducted a preliminary review of the identified weaknesses and have determined that there is no single root cause for their occurrence. Some were due to inadequate management oversight and some due to weaknesses in the quality control process. The majority of the issues identified as weaknesses have as their root cause the lack of clearly defined standards regard!ng what constitutes sufficient justification for deviction from generic emergency procedure guidelines.
We believe the standards have and will continue to evolve with practice and time as both the NRC and industry gain experance with the issues. For example, as noted in the inspection report, Vermont Yankee's EOP program was much improved as a result of reroonse to inspection findings (USNRC Inspection Report No. 50-271/9102) as well as our own initiatives derived from the guidance provided in NUREG-1358, (" Lessons Learned From the Special inspection Program for Emergency Operating Procedures").
SUMMARY
OR NRC FINDINGS RELATIVE TO PROGRAMMATIC WEAKNESSES:
Weaknesses in the program have resulted in EOP appendices and support procedures that are not of the same high quality (as the flowchart procedures).
The programmatic controls do not appear to te effective for ensuring that tools and materials will be available to support implementation of the EOP support procedures.
These weaknesses in the EOP programmatic controls are considered to be unresolved pending licensee review and resolution (Sections 6.1 and 6 2).
}
m
l 3
l i .VY RESPONSE:
1 An OE appendix writers guide will be developed in accordance with the criteria established in NUREG 0899, and incorporated into Vermont Yankee's PGP, in addition, the Verification ar:d Validation programs will be revised to include the appropriate criteria when applied to OE appendices and support j procedures, and will addrest the utilizbtion of multi-disciplined teams during procedure development. I Appropriate surveillance checklists for tools and materials will be developed and controlled via
- administrative procedures. Scheduled surveillance intervPls will be established based on past experience with similar tool and material control processes.
I I ROOT CAUSE:
l !
The root cause for the programmatic weaknesses which resulted in EOP appendices and support procudures not of the saf t" high quality as the flowchart procedures has been dets.rmined to be due to a change in the method for preparation of OE appendices without adequate review of the entire i i development process. A contributing cause was the erroneous assumption that, as with other i procedures, there would be adequate exercise of the OE appendices and support procedures by ,
! operators during training and practice to provide additionalverification and validation via the procedure !
j change suggestion process. In addition, specific guidance was not provided in the procedure writers
- guide for development of OE appendices in accordance with Vermont Yankee's PGP.
1 The root cause for ensuring the availability of tools and materials needed for EOP Implementation has been determined to be inadequate administrative controls. In the past, uncontrolled checklists have
!. been utilized for surveillance of materials and tools necessary for implementation of OE appendices, i in addition, there was no provision for ensuring that review and timely revision of the checklists were performed when necessitated by EOP or support procedure change..
l l
i i
i j
1 i
d l
t 1
, NRC SECTION #1: COMPARI">ON OF BWiVG EPGs & VY PSTGS COM.'.ENT TYPE .
SECTION TITLE REVISE REVISE REVISE REVISE OTHER TECH FORMAT PSTG DIFF-1 DIFF-2 OE(s)
A.1 Transitions frcm Other Guide 1ines X X X X
).
A.2.a Injection Thru the RHR Heat Exchangers X X X X A.3.a Override to Repoen MSIVs X X l A.3.b Initiation of Shutdown Cooling X X X X REV OP 0109 A.4.a Initiation of Alt Rod Insertion & Reset X X A. 4. b - Increasing CRD Differential Pressure X X X X NEW EOP APP B.I.n RPV Depressurization I X X B.2.a Defeating Isolation Interlocks X X B.3.a Termination of Injection at Vacuum Bkr Elev X X X X
, B.3.b Termination of Inject for Primary Containment X X X X Water Level Limit i
B.4.a Override' Statement X X
- B.4.b Air Purge X X X X C.1 Entry Conditiens X OPEN ISSUE j C.2 Secondary Containment Vent. Override X X X X C.3.a Operatior. of Available RB Ventilation X' X X X j C.4.a Floor Drain Sump Water Levels X X X X 3
D.1 Emergency Der;essurization I X E.1.a Inhibit ADS X X E.1.b Spray Cooling X X X X 5
i- E.1. c ' Transition from Spray Cooling to Steam Cooling X X E.2.a Termination & Prevention of Injection X OPEN ISSUE h
4! E.2.b Defeating Interlocks X NEW EOP APP E.3.a RPV Wtr Lvl Below Min Stm Cool Wtr Lvl X OPEN ISSU": ;
j E.3.b Transition to Primary Containment Flooding X X 3
E.4.a RPV Venting X OPEN ISSUE i
i 4
i u , . _ + .. . ___
. - . ~ - - - . - . . . . - - - ~ ~ ~ ~ ~ . - - . - ~ - _ - -
1 - !
l NRC SECTION #2 COMPARISON OF VY PSTGS & VY EOPS u
l COMMENT TYPE l
A SECTION TITLE REVISE REVISE REVISE REVISE !
- TECH FORMAT PSTG DIFF-1 DIFF-2 OE(S) OTHER
' ['
A1 Shutdown Conditions X OPEN ISSUE ,
, B .1 : Entry Conditions-RPV Water Level A X Cannot be Determined Override-Transition to Level / Power 4
B.2.a X X Control d
B.2.b Injection Through The RHR Heat X X X ,
Exchangers i 4 :
i i
- B.2.c Use of Alternate Injection Systems X X
, B.3.a Heat Capacity Temperature Limit & X X X REVISE OE 3100 SRV Tail Pipe Level Limit j B.3.b RPV Depressurization X REVISE OP 0109 B.4.a Defeating RPS Logic Trips X X X -
J-C.l.a Suppression Pool Temperature X X Control i
- C.2.a Primary containment Pressure X X j D.1 High Reactor. Building Differential X REVISE ON 3153 & 3158 ;
j Pressure Entry conditions l i' j D.2.a Floor Drain Sump Water Levels X REVISE ARS(s)
- E .1. a . Transitions from Other Guidelines X OPEN ISSUE l
l E.2.a RPV Water Level Above the Minimum X OPEN ISSUE l [ Steam Cooling RPV Water Level i
j E.2.b Exit from Level Power Control X X 4
4 1
~
i 4
i t
4 ,
_ _ _ _ _ _ _ _ _ . _ . _ . . _ _ . _ .. . . _ _ _ _ _ . . . . . _ . . . . . - . . . . _ _ _ . . _ . _ . . -._..___m.._,___..._..... -
I .
i NRC SECTION #3 TECHNICAL ADEQUACY OF EOPS & SUPPORT PROCEDURES .
COMMENT TYPE
! SECTION TITLE TECH FORMAT REVISE REVISE REVISE REVISE -
PSTG DIFF-1 DIFF-2 OE(s) OTHER l A Primary Containment Water X CHANGE DRYWELL HIGH WATER Level Indication LEVEL ALARM SETPOINT B Isolation of Systems X REVISE ON 3153 & 3158 Discharging Into Secondar<j Contair>tna nt C Emergency RPV X OPEN ISSUE Depressurization with alp *rnate Systems D Control Rod Insertion X , REVISE OP 0109 I
E Throttling Fire Water X X -
Injection i
j NOTE: (1) PGP APPENDIX At PLANT SPECIFIC TECHNICAL GUILDEIN (PSTG)
[ (2) PGP APPENDIX Et EPG TO PSTG DIFFERENCES (DIFF-1)
- (3) PGP APPENDIX F PSTG TO OE DIFFERENCES (DIFF-2) 1 A
i i
i i
4 i
l t
4 i-
.. . . _ . _ _ . _ _ - - _ _ - - -