B12765, Forwards Rev 15 to Emergency Plan Implementing Procedure EPIP 1.5-1, Emergency Assessment. Temporary Procedure Change 87-248 to Rev 14 to EPIP 1.5-1 Canceled & Should Be Removed.Pages 17-19 of Rev 14 Should Not Be Destroyed

From kanterella
Jump to navigation Jump to search
Forwards Rev 15 to Emergency Plan Implementing Procedure EPIP 1.5-1, Emergency Assessment. Temporary Procedure Change 87-248 to Rev 14 to EPIP 1.5-1 Canceled & Should Be Removed.Pages 17-19 of Rev 14 Should Not Be Destroyed
ML20237C258
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 12/15/1987
From: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20237C260 List:
References
B12765, NUDOCS 8712210203
Download: ML20237C258 (3)


Text

. . _ - - _

CONNECTICUT YANKEE ATO MIC POWER COMPANY B E R L I N. CONNECTICUT P O BOX 270

l

(( December 15,1987 Docket No. 50-213 B12765 Re: 10CFR50, Appendix E U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Haddam Neck Plant Emergency Plan Implementing Procedures Due to revisions to previously submitted Emergency Plan Implementing Procedures (EPIP), and pursuant to Section V of Appendix E to 10CFR50, Connecticut Yankee Atomic Power Company hereby submits one (1) copy of the following EPIP:

o EPIP 1.5-1, Revision 15," Emergency Assessment" Do not destroy pages 17,18, and 19 of Revision 14. These pages inust be kept and used with Revision 15 as pages 20,21, and 22 (EAL Tables).

Pen and ink changes should be made to reflect the new effective date (November 27,1987) and the new revision number (15) on your copy of these tables. In addition, remove Temporary Precedure Change 87-248 from EPIP 1.5-1, Revision 14. This temporary procedure change has been cancelled.

Should you have any questions, please feel free to contact us.

Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY s

M W' E. J.)dr6cik~a /

Senior Vice President cc: Chief, Emergency Preparedness Section, Region 1 (2)

W. T. Russell, Region 1 Administrator (1)

A. Wang, NRC Project Manager, Haddam Neck Plant (w/o attachment)

J. T. Shediosky, Resident Inspector, Haddam Neck Plant (1)

/

7 8712210203 871215 1 PDR ADOCK 05000213 i s K i' F PDR g{s L.

e

/

') CONNECTICUT YANKEE ATOMIC POWER COMPANY NOTICE OF RECEIPT OF: PLANT PROCEDUP.E MANUAL EPIP 1.5 CHANGE NO.: 97-/b T0:

COPY NO.:

Please insert the revisions, listed below, into your copy of the above document and destroy all superseded and out-dated pages:

INSERT: Index page 1 of 3, dated 11/25/87 Plant Procedure No. EPIP 1.5-1, Rev. 15, dated 11/27/87 DO NOT DESTROY PAGES 17, 18, 19 0F REV. 14. THESE PAGES MUST BE KEPT AND USED WITH REV. 15 AS PAGES 20, 21, 22. (EAl. TABLES)

PEN IN THE NEW EFFECTIVE DATE(ll/27/87) AND THE NEW REV. 15 ON YOUR COPY OF THESE TABLES.

%J REMOVE: TPC 87-248 from Plant Procedure No. EPIP 1.5-1, Rev. 14, CANCELLED 1

l I have read and am aware of the provisions of the above listed documents. This acknowledges receipt of the revisions listed above. In addition, all superseded i pages have been removed and destroyed.

SIGNATURE: DATE:

l PLEASE RETURN THIS SHEET TO THE MAILR0OM, CONNECTICUT YANKEE  ;

L _ _ _-- - )

8 .

i 1

11/25/87

,(

() EMERGENCY PLAN IMPLEMENTING PROCEDURES I

NUMBER REVISION TITLE DATE EPIP 1.5-1 Rev. 15 Emergency Assessment 11/27/87 EPIP 1.5-2 Rev. 32 Notification and Communication 10/09/87 EPIP 1.5-3 Rev. 7 Notification of Unusual Event 5/22/87 l EPIP 1.5-4 Rev. 9 Alert 3/24/87 EPIP 1.5-5 Rev. 9 Site Area Emergency 3/24/87 EPIP 1.5-6 Rev. 9 General Emergency 3/24/87 EPIP 1.5-7 Rev. 9 Radiological Dose Assessment 1/1/86 EPIP 1.5-8 Rev. 7 Emergency Operations Facility (EOF) 4/12/86 Emergency Radiological Surveys EPIP 1.5-9 Rev. 9 On-Site Emergency Radiological Surveys 4/12/86

,, EPIP 1.5-10 Rev. 10 Off-Site Emergency Radiological 3/20/87

( Surveys EPIP 1.5-11 Rev. 7 Personnel Injuries 1/5/87 EPIP 1.5-12 Pev. 5 Personnel / Vehicle Monitoring and 11/15/86 Decontamination EPIP 1.5-13 Rev. 5 Personnel Accountability 9/22/87 EPIP 1.5-14 Rev. 8 Evacuation and Assembly 11/10/87 EPIP 1.5-15 Rev. 5 Search and Rescue 9/11/86 EPIP 1.5-16 Rev. 4 Fire 4/P3/86 EPIP 1.5-17 Rev. 4 Emergency Equipment 11/26/86 EPIP 1.5-18 Rev. 5 Emergency Plan Training, Drills, and 4/28/87 Exercises EPIP 1.5-19 Rev. 4 Emergency Operations Facility 11/?8/85 Activation EPIP 1.5-20 Rev. 4 Reentry and Recovery 9/11/86 (N EPIP 1.5-21 Rev. O Director of Station Emergency 11/10/87 C) Operations Page 1 of 3


_____a