B12691, Forwards Revised Tech Spec Pages Correcting Typos on Page 3-11,to Change Gpm to 230,000 Gallons & Page 3.31L,to Change Table 3.2-1 to 3.17-1

From kanterella
Jump to navigation Jump to search
Forwards Revised Tech Spec Pages Correcting Typos on Page 3-11,to Change Gpm to 230,000 Gallons & Page 3.31L,to Change Table 3.2-1 to 3.17-1
ML20235S457
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 10/02/1987
From: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20235S459 List:
References
B12691, NUDOCS 8710090006
Download: ML20235S457 (1)


Text

_

i l s l l

namom 203-665-5000 October 2,1987 Docket No. 50-213 Bi2691 Re: 10CFR50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

Reference:

(1) E. 3. Mroczka letter to U. S. Nuclear Regulatory Commission,

" Cycle 15 Reload Technical Specifications," dated July 22, 1987.

Gentlemen:

Haddam Neck Plant Corrections to the Cycle 15 Reload Technical Specifications In Reference (1), Connecticut Yankee Atomic Power Company provided an updated set of proposed Technical Specification changes needed to support Cycle 15 operation. During further review of this document, two typographical errors have been noted. They are as follows:

o pg. 3-11, second line of the " Basis," change 230,000 GPM to 230,000 gallons.

o pg. 3.31L, " Surveillance Requirements," Item a, change Table 3.2-1 to Table 3.17-1.

Attachment I contains the changed pages as described above. Should you have any questions, please contact our licensing representative directly.

Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY

/& An)

E. n yodzka" ' ~ f Senior'Vice President cc: W. T. Russell, Region 1 Administrator F. M. Akstulewicz, NRC Project Manager, Haddam Neck Plant J. T. Shediosky, Resident Inspector, Haddam Neck Plant B710090006 PDR ADOCK  % $$13 PDR P

_ _ _ _ .