B12561, Forwards Rev 14 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21 & 2.790)

From kanterella
Jump to navigation Jump to search
Forwards Rev 14 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21 & 2.790)
ML20234D313
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/30/1987
From: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
B12561, NUDOCS 8707070170
Download: ML20234D313 (1)


Text

I f

CONNECTICUT YANKEE ATO MIC POWER COMPANY l

B E R L I N. CONNECTICUT P o DOX 270 + HARTFORD, CONNECTICUT 061410270 l

I 23$s" $ June 30,1987 l Docket No. 50-213 B12561 Re: 10CFR50.54(p)

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

1 Haddam Neck Plant Revision 14 to the Physical Security Plan Connecticut Yankee Atomic Power Company (CYAPCO) hereby submits Revision 14 to the Haddam Neck Plant Physical Security Plan. The revision is provided as Attachment 1.

The CYAPCO Plant Operations Review Committee has evaluated this revision pursuant to 10CFR50.54(p) and has determined that it does not decrease the effectiveness of the Physical Security Plan.

1 Pursuant to 10CFR73.21(b), the Physical Security Plan is considered Safeguards Information, and as such, CYAPCO requests that the Physical Security Plan be {

withheld from public disclosure pursuant to 10CFR2.790(a).

]

l We trust you will find this information satisfactory.

Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY

/?. . MJ l6cua (/

E. 'X/)Vice President Seniorr cc: W. T. Russell, Region 1 Administrator (2 copies) hgh l F. M. Akstulewicz, NRC Project Manager, Haddam Neck Plant P. D. Swetland, Resident inspector, Haddam Neck Plant

!l SAFEGUARDS INFORMATION IN ATTACHMENT l l

g707017087063o UPON SEPARATION THIS LETTER IS DECONTROLLED p ADDCK 05000213 i PDR  ;

__.____-_-_______-__-_L