B12245, Forwards Reviews for Listed Isap Topics,Including Topic 1.43, Tech Specs from Generic Ltr 83-37, Per 850517 Commitment

From kanterella
Jump to navigation Jump to search
Forwards Reviews for Listed Isap Topics,Including Topic 1.43, Tech Specs from Generic Ltr 83-37, Per 850517 Commitment
ML20215J399
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 10/16/1986
From: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
To: Charemagne Grimes
Office of Nuclear Reactor Regulation
References
B12245, GL-83-37, NUDOCS 8610240423
Download: ML20215J399 (5)


Text

.

a CONNECTICUT YANKEE ATOMIC POWER COMPANY B E R L I N. CONNECTICUT P O BOX 270 HARTFORD. CONNECTICUT 06141-0270 TELEPHONE 203-665-5000 October 16,1986 Docket No. 50-213 B122t5 Office of Nuclear Reactor Regulation Attn: Mr. Christopher I. Grimes, Director Integrated Safety Assessment Project Directorate Division of PWR Licensing - B U.S. Nuclear Regulatory Commission Washington, D.C. 29555

References:

(1) 3. F. Opeka letter to C.1. Grimes, dated May 17,1985.

(2) H. L. Thompson letter to 3. F. Opeka, dated July 31,1985.

Gentlemen:

Haddam Neck Plant Integrated Safety Assessment Program In Reference (1), Connecticut Yankee Atomic Power Company (CYAPCO) provided a proposed scope for the Integrated Safety Assessment Program (ISAP) review of the Haddam Neck Plant. In Reference (2), the Staff formally issued the results of the ISAP screening review process, establishing the scope of ISAP for Haddam Neck and initiating issue-specific evaluations. Reference (1) also indicated that for each issue or topic included in ISAP, CYAPCO would provide a discussion of the safety objective and an evaluation of the plant design with respect to the issue being addressed to identify specific items to be considered in

.the integrated assessment. In accordance with this commitment, reviews for the following ISAP topics are attached:

1) ISAP Topic No.1.15 "FDSA Update"
2) ISAP Topic No. 1.te3 - " Technical Specifications from Generic Letter 83-37" If you have any questions concerning the attached reviews, please contact us.

Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY h

3. F. QpeKa F.V 6A Senior Vice President p@\

G610240423 861016 t PDR ADOCK 05000213 P PDR

Docket No. 50-213 B12245 Haddam Neck ISAP Topic No.1.15 FDSA Update October 1986

Haddam Neck ISAP Topic No.1.15 FDSA Update I. Introduction 10CFR50.71(e) requires that licensees periodically update the Final Safety Analysis Report (FSAR) originally submitted as part of the application for the operating license to assure that the information included in the FSAR contains the latest material developed.

II. Review Criteria 10CFR50.71 " Maintenance of Records, Making of Reports" III. Related Topics / Interfaces s

None IV. Evaluation '

CYAPCO has requested a schedular exemption from the FSAR update rule, and the request has been. granted pursuant to the provisions outlined in Reference 2. This exemption request provided to the Staff the proposed scope and schedule for the Haddam Neck FDSA update project.

V. Conclusion Based on the above, CYAPCO considers this ISAP topic closed. However, the associated costs and resource burden will be factored into the

, integrated assessment.

VI. References

1. 3.F. Opeka letter to H.L. Thompson, Jr., " Request for exemption from 10CFR50.71(e), FSAR Updates," dated September 13,1985.

4

2. H.L. Thompson, Jr letter to 3.F. Opeka, " Exemption from 10CFR50.71(e), FSAR Updates," dated October 2,1985.
3. 3 F.Opeka letter to H. L. Thompson, Jr., " Exemptions from

! 10CFR50.71(e) FSAR Updates," dated October 11,1985.

4. H.L. Thompson letter to 3. F. Opeka, " Exemption from Submittal Date for Updated Facility Description and Safety Analysis (FDSA)," dated November 22,1985.
5. 3.F.Opeka letter to C. I. Grimes, "Haddam Neck Plant - FSAR Update Milestones," dated June 17,1986.

Docket No. 50-213 B12245 Haddam Neck ISAP Topic No.1.43 Technical Specifications from Generic Letter 83-37 l

l October 1986 l l

l 1

e Haddam Neck ISAP Topic No.1.43 Technical Specifications from Generic Letter 83-37

1. Introduction Generic Letter No. 83-37 outlined Technical Specifications associated with selected NUREG-0737 items to provide assurance that facility operation is maintained within the limits determined acceptable at Haddam Neck. The scope and type of specification willinclude appropriate' action by CYAPCO if limiting conditions for operation cannot be met.

II. Review Criteria

1. NUREG-0737, " Clarification of TMI Action Plan Requirements Generic Letter No. 83-37 "NUREG-0737 Technical Specifications" III. Related Topics / Interfaces ISAP Topic No.1.24 "TS Surveillance for Hydraulic Snubbers" ISAP Topic No.1.25 "TS Surveillance for Mechanical Snubbers" IV. Evaluation CYAPCO is preparing to implement Standard Technical Specifications (STS) for the Haddam Neck Plant. The Haddam Neck STS will address Generic Letter 83-37 and NUREG-0737 recommendations.

V. Conclusion Pending implementation of the Standard Technical Specifications, CYAPCO considers this ISAP Topic adequately addressed.