B12003, Requests Extension to 860326 to Provide Info Requested in Re Response to Generic Ltr 84-04 & SEP Topic III-06

From kanterella
Jump to navigation Jump to search
Requests Extension to 860326 to Provide Info Requested in Re Response to Generic Ltr 84-04 & SEP Topic III-06
ML20138B532
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 03/03/1986
From: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
To: Charemagne Grimes
Office of Nuclear Reactor Regulation
References
TASK-03-06, TASK-3-6, TASK-RR B12003, GL-84-04, GL-84-4, NUDOCS 8603250095
Download: ML20138B532 (1)


Text

I CONNECTICUT YANKEE ATOMIC POWER COMPANY B E R L I N. CONNECTICUT P o BOX 270 HARTFORD CONNECTICUT 06141 0270 TELEPHONE 203-665-5000 March 3,1986 Docket No. 50-213 B12003 Office of Nuclear Reactor Regulation Attn: Mr. C. I. Grimes, Director Integrated Safety Assessment Project Direc orate Division of PWR Licensing - B U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Reference:

(1) F. M. Akstulewicz letter to CYAPCO, Meeting Summary on New Design of the Reactor Cavity Pool Seal, dated December 17, 1985.

Gentlemen:

Haddam Neck Plant Extension Request for Additional Information on Generic Letter 84-04 and Systematic Evaluation Program Topic III-6 In twoReference conditions(1), a definitive identified statement in Generic Letterdescribing)how we propose 84-04,(1 considering to satisfy the Systematic Evaluation Program (SEP) seismic spectra, was requested. Along with this a description of planned improvements to specific primary system supports identified in the SEP Topic III-6 was requested.

We have developed a response that describes how we meet the two conditions of Generic Letter 84-04 but are still evaluating the primary system supports identified as part of SEP Topic III-6. As such, we request an extension to providing the information requested in Reference (1) to on or before March 26, 1936. With this extension we will be able to provide you with more complete responses for your review.

Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY

% . :. Cak V 3.F.OkekA Senior Vice President (1) D. G. Eisenhut letter to All Operating PWR Licensees, Construction Permit Holders and Applicants for Construction Permits, " Safety Evaluation of p Westinghouse Topical Reports Dealing with Elimination of Postulated Pipe g; Breaks in PWR Primary Main Loops (Generic Letter 3 4-04)," dated I tg February 1,1984.

k P

D p