A06649, Updates 870805 Response to NRC Informing of Steps Taken to Correct Deviation Noted in Insp Rept 50-213/87-10. Review of Emergency Operating Procedures Will Be Completed by 880311.Simulator Training Matls Revised

From kanterella
Jump to navigation Jump to search
Updates 870805 Response to NRC Informing of Steps Taken to Correct Deviation Noted in Insp Rept 50-213/87-10. Review of Emergency Operating Procedures Will Be Completed by 880311.Simulator Training Matls Revised
ML20237D324
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 12/18/1987
From: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
A06649, A6649, NUDOCS 8712230191
Download: ML20237D324 (3)


Text

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ -

7 l

6 r

CONNECTICUT YANKEE ATOMIC POWER COMPAN Y B E R L I N, CONNECTICUT P O DOX 270 HARTFORD, CONNECTICUT 06141-0270 im mom . I 2M465-5NO j i

i De cembe r 18, 1987 Docket No. 50-213 A066 49 Re: 10CFR2  !

i U.S. Nuclear Regulatory Commission Attn: Document Control De s k Washington, D.C. 20555

References:

(1) W. V. Johnston letter to E. J. Mroczka,

" Inspection Report No. 50-213/87-10," dated Ju ne 29, 1987.

(2) E. J. Mroczka letter to W. V. Johnston,

" Response to Inspection Report No. 50-213/

87-10," dated August 5, 1987.

Gentlemen:

Haddam Neck Plant Follow-up to Inspection Report No. 50-213/87-10 Re fe re nce (1) informed the Connecticut Ya nkee Atomic Power Company of a deviation identified during an inspection at the Haddam Neck Plant from April 13-17, 1987. Reference (2) responded to Reference (1) a nd indicated a plan of action for

. correcting the deviation. The purpose of this letter is to upda te the NRC on those items of Reference (2) which had not been completed when Reference (2) was issued. For clarity, those items are repeated below, followed by the update.

Item 1 i The Eme rge ncy Ope ra ti ng Procedures (EOPs) will be reviewed by Huma n Factors personnel . This review will include the resolution of the deficiencies identified in Attachment B of Reference (1).

In addition, the disparities between EOP and control room nomencla ture will be resolved.

\

8712230191 871218 f io PDR ADDCK 05000213 0 PDR

j i U.S. Nuclear; Regulatory Commission g A066 L 49/Page 2

' - December 18, 1987 l Item 1 Update

_The Human Factors review of EOPs, which is . the major- portion of the upgrade, is still in progress. -Reference (2) _ indica ted that we expected to be completed with 'this review by December 31, 1987. Due to the extension of the cutage and the need to revise

- the current EOPs to incorpora te design cha nges , start-up licens-ing issues, Probabilistic Risk Assessment concerns, new Technical Specifications, and other related issues, this review is now expected to be completed by March ll, 1988. Resulting procedure changes are expected to be completed approximately three months later. We.will keep you informed.

Item 3 i

A control room or simulator walk-through will be performed on those Function Restoration Procedures -(FRPs) which could not be validated on the simulator. Simulator training personnel will evaluate.which FRPs should be included in future simulator exercises.

' Item 3 Update

! The FRPs were validated on or at the simulator in October, 1987.

l In addition, Training personnel have evaluated which FRPs should be included in future simulator exercises.

1 Item 4 The. process for making temporary changes to EOPs will be reviewed and methods of improving implementation time will be evaluated.

L Item 4 Update l

The use of Temporary Procedure Changes (TPCs) on EOPs has been reviewed. To improve implementa tion time , all TPCs will be l incorporated by procedure revision within 90 days unless approved by the Unit Superinte ndent.

l Item 5 The appropriate simulator training materials will be revised as necessary to have instructors reinforce the importance of not skipping over notes, cautions, and TPCs by procedure readers.

I 1

l

1 l' U .S . Nuclear Regulatory Commission

. , A066 49/Page 3-December 18, 1987 i

Item 5 Update Simulator training materials have been revised to have instructors reinforce the use of notes, cautions, a nd TPCs by the procedure readers.

Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY

?n/

E .'J/. Mroc z kq(9' Se(lor Vice President cc: W. T . Russell, Region I Administrator A. B. Wa ng , NRC Project Ma nage r , Haddam Neck Plant J. T. Shedlosky, Re side nt Inspector, Haddam Neck Plant 1