A05884, Suppls 860729 Response to Violations Noted in Insp Rept 50-213/86-15.Nuclear Review Board Audits Conducted Annually Per Tech Spec 6.5.2.8.Tech Specs Implemented on 860101 & Audited in May & June of 1986

From kanterella
Jump to navigation Jump to search
Suppls 860729 Response to Violations Noted in Insp Rept 50-213/86-15.Nuclear Review Board Audits Conducted Annually Per Tech Spec 6.5.2.8.Tech Specs Implemented on 860101 & Audited in May & June of 1986
ML20210V231
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 09/26/1986
From: Opeka J, Sears C
CONNECTICUT YANKEE ATOMIC POWER CO.
To: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
A05884, A5884, NUDOCS 8610100601
Download: ML20210V231 (2)


Text

.

e CONNECTICUT YANKEE ATOMIC POWER COMPANY B E R L I N, CONNECTICUT P.O BOX 27o HARTFORD. CONNECTICUT 06141-027o TELEPHONE mos-ess-sooo September 26, 1986 Docket No. 50-213 A05884 Mr. Thomas T. Martin Division of Radiation Safety and Safeguards U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Reference:

(1) J. F. Opeka letter to T. T. Martin dated July 29, 1986 Gentlemen:

Haddam Neck Plant Supplementary Information in Response to I&E Inspection 50-213/86-15 In Reference (1), Connecticut Yankee Atomic Power Company (CYAPCO) responded to I&E Inspection 50-213/86-15. Reference (1) stated, in part, that "A Nuclear Review Board Ef fluents Audit will be conducted semi-annually to verify continued compliance."

This statement was made in error and the purpose of this letter is to correct that error.

Nuclear Review Board (NRB) audits are conducted annually pursuant to Technical Specification 6.5.2.8. Approximately one third of the plant's Technical Specifications are audited each year so that every Technical Specification is audited during each three year period. Since the Radiological Effluents Technical fhk 0 h3 G

\0 Te o

a Specifications (RETS) were implemented on January 1, 1986, they were audited for the first time in May and June of 1986.

Hereafter, they will be audited as part of the current Technical Specifications requirements. CYAPCO concludes that this provides adequate oversight.

- Very truly yours, -

CONNECTICUT YANKEE ATOMIC POWER COMPANY b .b

3. F. Ofeka Senior Vice President By: C. F. Sears Vice President r

.