Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217F9941999-10-15015 October 1999 Discusses FPC 970819 Request for Temporary Relief from ASME Code Section XI Requirements to Repair ASME Class 3 Nuclear Service & Decay Heat Sea Water System Piping.Forwards SE Containing Results of Staff Review ML20217J5171999-10-13013 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Plant,Unit 3 & Did Not Identify Any New Areas That Warranted More than Core Insp Program.Previously Planned Regional Initiative Insp of safety-related Mod Will Be Performed 3F1099-14, Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed1999-10-13013 October 1999 Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed 3F1099-11, Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made1999-10-0404 October 1999 Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made ML20212L0771999-10-0404 October 1999 Forwards SER Accepting Licensee Relief Requests 98-012 Through 98-018 Involving Containment Insps at Crystal River Unit 3 Pursuant to 10CFR50.55a(a)(3)(i) & 10CFR50.55a(a)(3)(ii) ML20217D6551999-10-0101 October 1999 Requests That Natl Communication Sys Arrange for Licensee Participation in Government Emergency Telecommunications Service,Per NRC Info Notice 99-025 ML20212J8481999-10-0101 October 1999 Forwards Safety Evaluation Re Second 10 Yr Interval ISI Program Requests for Relief 98-009-II.Reliefs Granted for 98-009-II,Parts B & C & 98-010-II & 98-011-II 3F0999-03, Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment1999-09-27027 September 1999 Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment 3F0999-18, Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 0003311999-09-27027 September 1999 Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 000331 ML20212F7251999-09-23023 September 1999 Discusses Staff Review of Util 980330 Response,As Suppl on 990514,to GL 97-06, Degradation of SG Internals. Staff Concludes That Licensee Responses to GL Provide Reasonable Assurance That Condition of SG Internals Acceptable ML20212F7331999-09-23023 September 1999 Discusses Util Licensing Action for GL 98-01, Year 2000 Readiness of Computer Systems at Nuclear Power Plants. NRC Ack Efforts Util Completed to Date in Preparing Crystal River,Unit 3 for Y2K Transition 3F0999-20, Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-461999-09-21021 September 1999 Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 ML20212E6741999-09-21021 September 1999 Forwards Safety Evaluation Accepting Proposed EAL Changes Submitted by ,As Supplemented by 981120,990713 & 0831 Ltrs,Incorporating Guidance in NUMARC/NESP-007,Rev 2, Methodology for Development of Eals 3F0999-01, Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv)1999-09-17017 September 1999 Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv) 3F0999-19, Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief1999-09-15015 September 1999 Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief ML20212F3141999-09-13013 September 1999 Forwards Insp Rept 50-302/99-05 on 990704-0814.Violations Noted,But Being Treated as non-cited Violations ML20211L9081999-09-0303 September 1999 Informs of Completion of Licensing Action for GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Crystal River Unit 3 ML20211Q7581999-09-0101 September 1999 Forwards Summary of 990812-13 Training Managers Conference in Atlanta,Georgia Re Recent Changes to Operator Licensing Program.List Conference Attendees,Copy of Presentation Slides & List of Participant Questions Encl 3F0899-23, Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals1999-08-31031 August 1999 Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals ML20211G7111999-08-30030 August 1999 Modifies Approval of 980521 Request for Exception to 10CFR50.4(b)(6) & Grants Util Approval to Submit Copies of Future Updates to FSAR as Listed ML20211G7031999-08-30030 August 1999 Informs of Approval of Util 980521 Request for Exception to 10CFR50.4(b)(6),allowing Util to Submit Updates to Plant Ufsar.Ltr Modifies That Approval & Grants Util Approval 3F0899-07, Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 20021999-08-27027 August 1999 Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 2002 ML20212C1351999-08-27027 August 1999 Requests Withholding of Proprietary Version of Enhanced Spent Fuel Storage Project Engineering Input 3F0899-20, Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.711999-08-26026 August 1999 Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.71 3F0899-05, Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 31999-08-20020 August 1999 Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3 3F0899-17, Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-051999-08-19019 August 1999 Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-05 3F0899-16, Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal1999-08-19019 August 1999 Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal 3F0899-02, Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 21999-08-16016 August 1999 Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 2 3F0899-06, Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value 05000302/LER-1997-038, Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented1999-08-13013 August 1999 Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented ML20210Q4511999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 ML20210P0741999-08-0505 August 1999 Forwards SE Accepting Licensee 980416 & 1130 Ltrs Re Third 10-year Interval ISI Program Plan & Associated Requests for Relief for Plant,Unit 3 3F0799-30, Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 9906031999-07-29029 July 1999 Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 990603 ML20210G8551999-07-27027 July 1999 Forwards Insp Rept 50-302/99-04 on 990523-0703.One Violation Identified & Being Treated as Noncited Violation 3F0799-09, Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments1999-07-19019 July 1999 Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments ML20209H5211999-07-16016 July 1999 Forwards Request for Addl Info Re Licensee Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in CR-3 once-through Steam Generators in Order to Complete Review ML20209G3231999-07-15015 July 1999 Forwards Biological Opinion Issued by Natl Marine Fisheries (NMFS) of Dept of Commerce.Nmfs Concluded That Operation of Cw Intake Sys of Crystal River Not Likely to Jeopardize Existence of Species Listed in Biological Opinion ML20209G3481999-07-15015 July 1999 Transmits Natl Marine Fisheries Svc (NMFS) Biological Opinion Based on Review of Continued Use of Cw Intake Sys at Crystal River Energy Complex.Concludes That Continued Use of Cw Intake Sys Not Likely to Adversely Affect Gulf Sturgeon 3F0799-21, Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl1999-07-14014 July 1999 Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl 3F0799-05, Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl1999-07-14014 July 1999 Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl 3F0799-25, Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl1999-07-14014 July 1999 Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl 3F0799-26, Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 9907301999-07-14014 July 1999 Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 990730 3F0799-22, Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held1999-07-13013 July 1999 Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held 3F0799-03, Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.21 3F0799-02, Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.21 ML20196L1261999-07-0707 July 1999 Discusses Closeout of TAC MA0538 Re License Response to RAI Re GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Plant,Unit 3 3F0799-10, Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 31999-07-0707 July 1999 Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 3 ML20196J4991999-07-0101 July 1999 Advises That Info Contained in ,Which Included TR BAW-2346P,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20209C0811999-06-25025 June 1999 Forwards Overdue Controlled Document Transmittals for Listed Documents 3F0699-06, Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl1999-06-23023 June 1999 Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl 1999-09-03
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR3F1099-14, Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed1999-10-13013 October 1999 Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed 3F1099-11, Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made1999-10-0404 October 1999 Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made 3F0999-03, Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment1999-09-27027 September 1999 Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment 3F0999-18, Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 0003311999-09-27027 September 1999 Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 000331 3F0999-20, Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-461999-09-21021 September 1999 Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 3F0999-01, Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv)1999-09-17017 September 1999 Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv) 3F0999-19, Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief1999-09-15015 September 1999 Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief 3F0899-23, Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals1999-08-31031 August 1999 Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals ML20212C1351999-08-27027 August 1999 Requests Withholding of Proprietary Version of Enhanced Spent Fuel Storage Project Engineering Input 3F0899-07, Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 20021999-08-27027 August 1999 Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 2002 3F0899-20, Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.711999-08-26026 August 1999 Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.71 3F0899-05, Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 31999-08-20020 August 1999 Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3 3F0899-16, Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal1999-08-19019 August 1999 Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal 3F0899-17, Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-051999-08-19019 August 1999 Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-05 3F0899-02, Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 21999-08-16016 August 1999 Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 2 05000302/LER-1997-038, Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented1999-08-13013 August 1999 Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented 3F0899-06, Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value 3F0799-30, Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 9906031999-07-29029 July 1999 Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 990603 3F0799-09, Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments1999-07-19019 July 1999 Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments ML20209G3481999-07-15015 July 1999 Transmits Natl Marine Fisheries Svc (NMFS) Biological Opinion Based on Review of Continued Use of Cw Intake Sys at Crystal River Energy Complex.Concludes That Continued Use of Cw Intake Sys Not Likely to Adversely Affect Gulf Sturgeon 3F0799-25, Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl1999-07-14014 July 1999 Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl 3F0799-21, Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl1999-07-14014 July 1999 Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl 3F0799-05, Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl1999-07-14014 July 1999 Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl 3F0799-26, Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 9907301999-07-14014 July 1999 Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 990730 3F0799-22, Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held1999-07-13013 July 1999 Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held 3F0799-02, Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.21 3F0799-03, Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.21 3F0799-10, Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 31999-07-0707 July 1999 Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 3 ML20209C0811999-06-25025 June 1999 Forwards Overdue Controlled Document Transmittals for Listed Documents 3F0699-12, Provides Suppl Info for LAR 240,rev 0 & Pump Curve for EFP-3 to Facilitate Review,As Requested1999-06-23023 June 1999 Provides Suppl Info for LAR 240,rev 0 & Pump Curve for EFP-3 to Facilitate Review,As Requested 3F0699-06, Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl1999-06-23023 June 1999 Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl 3F0699-08, Provides Updated Info to Licensee Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Ltr Establishes No New Regulatory Commitments1999-06-21021 June 1999 Provides Updated Info to Licensee Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Ltr Establishes No New Regulatory Commitments 3F0699-09, Forwards FPC 1998 Annual Financial Repts for Two Participating co-owners of Crystal River Unit 3.Financial Statements & Independent Auditors Repts for City of Alachua,Fl,Encl1999-06-0404 June 1999 Forwards FPC 1998 Annual Financial Repts for Two Participating co-owners of Crystal River Unit 3.Financial Statements & Independent Auditors Repts for City of Alachua,Fl,Encl 3F0599-21, Submits Addendum to B&W Owners Group Topical Rept BAW-2346P, Rev 0.Addendum Includes Leak Rate Values Based on CR-3 Plant Specific Main Steam Line Break Tube Loads1999-05-28028 May 1999 Submits Addendum to B&W Owners Group Topical Rept BAW-2346P, Rev 0.Addendum Includes Leak Rate Values Based on CR-3 Plant Specific Main Steam Line Break Tube Loads 3F0599-10, Submits Changes Made to Crystal River,Unit 3 Its,As Required by ITS 5.6.2.17.Encl Provides Revs to Plant ITS Bases That Will Update NRC Copies of Its.Instructions for Updating ITS, Encl1999-05-26026 May 1999 Submits Changes Made to Crystal River,Unit 3 Its,As Required by ITS 5.6.2.17.Encl Provides Revs to Plant ITS Bases That Will Update NRC Copies of Its.Instructions for Updating ITS, Encl ML20207E4341999-05-25025 May 1999 Submits 30-day Written Rept on Significant PCT Changes in ECCS Analysis for ANO-1.CRAFT2 Limiting PCT for ANO-1 Was Bounded by 1859 F PCT Calculated at 2568 Mwt for Crystal River 3 Cold Leg Pump Discharge Break Size of 0.125 Ft 3F0599-22, Forwards non-proprietary Version of B&Wog Topical Rept BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through Sgs1999-05-21021 May 1999 Forwards non-proprietary Version of B&Wog Topical Rept BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through Sgs 3F0599-18, Forwards 1998 Annual Radiological Environ Operating Rept for Crystal River,Unit 3. Rept Is Submitted in Accordance with CR-3 ITS 5.7.1.1(b) & Section 6.6 of ODCM1999-05-14014 May 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Crystal River,Unit 3. Rept Is Submitted in Accordance with CR-3 ITS 5.7.1.1(b) & Section 6.6 of ODCM 3F0599-17, Submits Update Response to GL 97-06, Degradation of SG Internals. Ltr Establishes No New Regulatory Commitments1999-05-14014 May 1999 Submits Update Response to GL 97-06, Degradation of SG Internals. Ltr Establishes No New Regulatory Commitments 3F0599-07, Submits Guarantee of Payment of Deferred Premiums for CR-3 in Accordance with 10CFR140.21.Internal Cash Flow Projection Was Prepared in Accordance with Suggested Format Outlined in Reg Guide 9.4 Dtd Sept 19781999-05-14014 May 1999 Submits Guarantee of Payment of Deferred Premiums for CR-3 in Accordance with 10CFR140.21.Internal Cash Flow Projection Was Prepared in Accordance with Suggested Format Outlined in Reg Guide 9.4 Dtd Sept 1978 3F0599-03, Provides Update Curves for Facility Pressure/Temp Limits Rept,Rev 2 & Updated Rev Bar ITS Pages Associated with LAR, in Response to NRC RAI Re Subject LAR1999-05-12012 May 1999 Provides Update Curves for Facility Pressure/Temp Limits Rept,Rev 2 & Updated Rev Bar ITS Pages Associated with LAR, in Response to NRC RAI Re Subject LAR 3F0599-05, Responds to 990402 RAI Re Third 10-year Interval ISI Program Plan Requests for Relief.Util Revised Relief Requests 98-010-II,98-003-PT,98-005-PT & 98-001-SS Based on Responses to Rai.Revised Relief Requests Encl1999-05-12012 May 1999 Responds to 990402 RAI Re Third 10-year Interval ISI Program Plan Requests for Relief.Util Revised Relief Requests 98-010-II,98-003-PT,98-005-PT & 98-001-SS Based on Responses to Rai.Revised Relief Requests Encl 3F0599-08, Forwards Licensee Clarification of Info Provided in Amend 171 Re post-LOCA Boron Dilution Precipitation Prevention.Ltr Establishes No New Regulatory Commitments1999-05-0303 May 1999 Forwards Licensee Clarification of Info Provided in Amend 171 Re post-LOCA Boron Dilution Precipitation Prevention.Ltr Establishes No New Regulatory Commitments 3F0599-09, Forwards Crystal River Unit 3 Radioactive Effluent Release Rept - 1998 & Revised Crystal River Unit 3 Radioactive Effluent Release Rept - 1997. Licensee Informs That ODCM & PCP Were Not Revised During 19981999-05-0101 May 1999 Forwards Crystal River Unit 3 Radioactive Effluent Release Rept - 1998 & Revised Crystal River Unit 3 Radioactive Effluent Release Rept - 1997. Licensee Informs That ODCM & PCP Were Not Revised During 1998 3F0499-24, Forwards Summary of Proposed Changes to Crystal River,Unit 3 NPDES Permit,That Are Being Submitted to Florida Dept of Environ Protection.Proposed Change Will Allow Use of Scale Inhibitor,Biocides & Foam Control Agent1999-04-30030 April 1999 Forwards Summary of Proposed Changes to Crystal River,Unit 3 NPDES Permit,That Are Being Submitted to Florida Dept of Environ Protection.Proposed Change Will Allow Use of Scale Inhibitor,Biocides & Foam Control Agent 3F0499-09, Forwards FPC Annual Financial Rept & Annual Financial Repts for Eight of Ten Participating co-owners of Crystal River Unit 3 Nuclear Station.Outstanding Annual Financial Rept Will Be Submitted by 9907301999-04-30030 April 1999 Forwards FPC Annual Financial Rept & Annual Financial Repts for Eight of Ten Participating co-owners of Crystal River Unit 3 Nuclear Station.Outstanding Annual Financial Rept Will Be Submitted by 990730 3F0499-23, Submits Repts Required by App B,Environ Protection Plan,Of Crystal River,Unit 3 Operating License.Fl Dept of Environ Protection Has Provided Clarification Re Ph Monitoring Requirements1999-04-23023 April 1999 Submits Repts Required by App B,Environ Protection Plan,Of Crystal River,Unit 3 Operating License.Fl Dept of Environ Protection Has Provided Clarification Re Ph Monitoring Requirements 3F0499-18, Informs of Recent Senior Management Change at Fpc,Which Will Not Affect Std Recipients of Incoming NRC Correspondence. Updated Util Mailing List,Encl1999-04-20020 April 1999 Informs of Recent Senior Management Change at Fpc,Which Will Not Affect Std Recipients of Incoming NRC Correspondence. Updated Util Mailing List,Encl 3F0499-05, Forwards Rev 19 to Radiological Emergency Response Plan. Changes to Plan Marked with Vertical Bars in Left Margin1999-04-16016 April 1999 Forwards Rev 19 to Radiological Emergency Response Plan. Changes to Plan Marked with Vertical Bars in Left Margin 3F0499-08, Forwards FPC Annual ITS Dose Rept for Period Jan-Dec 1998. Rept Provides person-rem Radiation Exposures,According to Work & Job Function,At CR-3 for Period Jan-Dec 19981999-04-16016 April 1999 Forwards FPC Annual ITS Dose Rept for Period Jan-Dec 1998. Rept Provides person-rem Radiation Exposures,According to Work & Job Function,At CR-3 for Period Jan-Dec 1998 1999-09-27
[Table view] Category:UTILITY TO NRC
MONTHYEAR3F0990-11, Forwards Final Status Update Re Design & Operations Verification for Instrument Air Sys Per Generic Ltr 88-141990-09-20020 September 1990 Forwards Final Status Update Re Design & Operations Verification for Instrument Air Sys Per Generic Ltr 88-14 3F0990-05, Forwards 1990 Inservice Insp Summary Rept. Rept Contains Owners Data Rept,Data Summary Sections for Class 1,2 & 3 Components,Rept for Repair & Replacements & Listing of Exams1990-09-14014 September 1990 Forwards 1990 Inservice Insp Summary Rept. Rept Contains Owners Data Rept,Data Summary Sections for Class 1,2 & 3 Components,Rept for Repair & Replacements & Listing of Exams 3F0990-08, Forwards Response to Violations Noted in Insp Rept 50-302/90-23.Corrective Actions:Training Session Conducted to Stress Importance of Attachments Being Part of Work Package When Required by Procedure1990-09-13013 September 1990 Forwards Response to Violations Noted in Insp Rept 50-302/90-23.Corrective Actions:Training Session Conducted to Stress Importance of Attachments Being Part of Work Package When Required by Procedure 3F0890-23, Discusses Decommissioning Financial Assurance Rept Dtd 900726.Amount Util Collecting Exceeds Amount Necessary Based on NRC Formula & Does Not Include Estimated Cost of Removal & Disposal of Nonradioactive Structures & Matls1990-08-30030 August 1990 Discusses Decommissioning Financial Assurance Rept Dtd 900726.Amount Util Collecting Exceeds Amount Necessary Based on NRC Formula & Does Not Include Estimated Cost of Removal & Disposal of Nonradioactive Structures & Matls ML20028G8251990-08-29029 August 1990 Advises That Supplemental Response to Insp Rept 50-302/89-18 Will Be Submitted by 901030 ML20059G1721990-08-24024 August 1990 Submits Info Re Change in Operator License Status.Re Rawls & Wa Stephenson Senior Reactor Licenses Should Be Terminated, Effective 900817 Due to Reassignment from Position Requiring Licenses 3F0890-15, Forwards Fitness for Duty Program Performance Data for Period of Jan-Jun 19901990-08-23023 August 1990 Forwards Fitness for Duty Program Performance Data for Period of Jan-Jun 1990 3F0890-21, Forwards Semiannual Radioactive Release Rept Jan-June 1990 for Crystal River Unit 3 & Rev 15 to Crystal River Unit 3 Odcm1990-08-23023 August 1990 Forwards Semiannual Radioactive Release Rept Jan-June 1990 for Crystal River Unit 3 & Rev 15 to Crystal River Unit 3 Odcm ML20059A0031990-08-16016 August 1990 Responds to NRC 900613 Request for Addl Info Re Util 871222 Response to Violations Noted in Insp Rept 50-302/87-30 3F0890-03, Forwards Rev 11 to Inservice Insp - Pump & Valve Program, Crystal River Unit 31990-08-16016 August 1990 Forwards Rev 11 to Inservice Insp - Pump & Valve Program, Crystal River Unit 3 3F0890-10, Advises That Util Completed Mods to Comply w/10CFR50.62 Requirements Re Reduction of Risk from ATWS Events1990-08-16016 August 1990 Advises That Util Completed Mods to Comply w/10CFR50.62 Requirements Re Reduction of Risk from ATWS Events 3F0890-05, Forwards Addl Info Re Response to Mode 3 Loca,Per 900711 Request,Providing Background of Factors Considered During Evaluation of Tech Spec Change Request 1741990-08-10010 August 1990 Forwards Addl Info Re Response to Mode 3 Loca,Per 900711 Request,Providing Background of Factors Considered During Evaluation of Tech Spec Change Request 174 ML20058L2001990-08-0202 August 1990 Provides Current Status of Reg Guide 1.97 Activities. Pressurizer Heater Status & Main Steam Safety/Relief Valve Position Indications Completed 3F0790-10, Forwards Justification for Continued Operation Re Emergency Diesel Generator Block Loading Voltage Dips.Util Will Install Higher Accuracy Relays to Improve on Accuracy & Repeatability of Load Intervals1990-07-18018 July 1990 Forwards Justification for Continued Operation Re Emergency Diesel Generator Block Loading Voltage Dips.Util Will Install Higher Accuracy Relays to Improve on Accuracy & Repeatability of Load Intervals 3F0790-06, Forwards Rev 1 to Cycle 8 Core Operating Limits Rept, Correcting Typo in Note 1 of Figures 1-8 & Note 2 of Figures 1,2 & 4-81990-07-12012 July 1990 Forwards Rev 1 to Cycle 8 Core Operating Limits Rept, Correcting Typo in Note 1 of Figures 1-8 & Note 2 of Figures 1,2 & 4-8 ML20055D5561990-06-29029 June 1990 Forwards 890505 & s to Be Placed in Plant File 3F0690-15, Informs That Tech Spec Actions Identified in Util Addressed as Part of Tech Spec Improvement Program,Per 900518 Request for Programmed Enhancements for Generic Ltr 88-171990-06-29029 June 1990 Informs That Tech Spec Actions Identified in Util Addressed as Part of Tech Spec Improvement Program,Per 900518 Request for Programmed Enhancements for Generic Ltr 88-17 3F0690-22, Forwards Annual Financial Repts for 1989 for Orlando Utils Commission & Cities of Bushnell,Leesburg,Ocala & Tallahassee,Per 10CFR50.71(b)1990-06-27027 June 1990 Forwards Annual Financial Repts for 1989 for Orlando Utils Commission & Cities of Bushnell,Leesburg,Ocala & Tallahassee,Per 10CFR50.71(b) 3F0690-19, Responds to Deviations Noted in Insp Rept 50-302/90-15. Corrective Actions:All Reg Guide 1.97 Category 1 Instruments on Main Control Board Marked & Engineered Safeguards Matrix Indicating Lights Arranged in Unique Array1990-06-25025 June 1990 Responds to Deviations Noted in Insp Rept 50-302/90-15. Corrective Actions:All Reg Guide 1.97 Category 1 Instruments on Main Control Board Marked & Engineered Safeguards Matrix Indicating Lights Arranged in Unique Array ML20043H5781990-06-21021 June 1990 Responds to Generic Ltr 89-06, Spds. All Open Issues Identified in NRC SER & Plant SPDS Satisfies NUREG-0737, Item I.D.2 & Suppl 1 ML20044A6121990-06-21021 June 1990 Forwards Payment of Civil Penalty,Per NRC 900524 Order Based on Findings in Insp Rept 50-302/89-09 ML20043J0221990-06-21021 June 1990 Submits Info in Support of Tech Spec Change Request 175,Rev 1,Suppl 1 Re Spent Fuel Pool Storage Capacity at Plant ML20043H4151990-06-21021 June 1990 Forwards Response to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. 3F0690-18, Responds to Violations Noted in Insp Rept 50-302/90-09. Corrective Action:Temporary Lettering Placed on Index Plates for Consistency W/Previous Markings Immediately Following Discovery of Error1990-06-20020 June 1990 Responds to Violations Noted in Insp Rept 50-302/90-09. Corrective Action:Temporary Lettering Placed on Index Plates for Consistency W/Previous Markings Immediately Following Discovery of Error ML20043H2901990-06-15015 June 1990 Forwards Results of Refuel 7 once-through Steam Generator (OTSG) Eddy Current Insp,Per Tech Spec Section 4.4.5.5.Eight Defective Tubes & Two Administratively Plugged Tubes in OTSG a Resulted from Review of Insp Data ML20044A0641990-06-13013 June 1990 Forwards Rev 5 to Physical Security Plan,Replacing Currently Approved Rev 4 W/Amends.Rev Withheld (Ref 10CFR73.21) ML20043G2271990-06-12012 June 1990 Suppls 900604 Ltr Describing How Control Room Habitability Dose Would Be Adversely Affected by Elimination of Reactor Bldg Flood Vol Unless Overly Conservative Failure Postulations Also Changed.Quarterly Updates to Be Provided ML20043G3711990-06-12012 June 1990 Forwards 1990 Internal Cash Flow Projection for Plant Which Updates Utils Utilization of Alternative (E) ML20043G2361990-06-12012 June 1990 Forwards Info Re Fire Protection Sys Reliability for Providing Water to Intermediate Bldg Following High Energy Line Break.B&W Issued Contract to Verify Mass/Energy Release & Motor Starters & Terminal Blocks Insulated ML20043F1601990-06-0404 June 1990 Provides Supplemental Info on Reactor Bldg Flooding,Per Util 900517 Ltr Describing Resolution Plan Being Pursued.Util Has Limited Vol of Water Contributed by Borated Water Storage Tank & Sodium Hydroxide Tank to Flood Level ML20043C8721990-05-31031 May 1990 Forwards Rev 0 to Crystal River Unit 3 Cycle 8 Core Operating Limits Rept, Per Tech Spec 6.9.1.7 ML20043B8431990-05-24024 May 1990 Describes Alternative Testing of Reactor Bldg Spray Suction Valves BSV-1 & BSV-8,per Generic Ltr 89-04.At Least One Valve Will Be Disassembled & Inspected During Each Refueling Outage Using Alternate Insp Method ML20043B2771990-05-18018 May 1990 Advises of Mod to Original Commitment & Plans to Store Seal Ring in Original Storage Location During Plant Operations, Per 790606 Ltr.Mod Minimizes Personnel Exposure & Enhances Seal Plate Leak Tightness Due to Less Handling ML20043B0321990-05-17017 May 1990 Provides Details of Resolution Util Will Pursue Re Reactor Bldg Flooding Detailed in Encl LER 90-005.Mod Will Be Installed to Add Alarm in Main Control Room to Indicate When Flood Level Reaches Point & Operator Action Begins ML20043A5441990-05-16016 May 1990 Discusses Status of Safety & Performance Improvement Program Portion of B&W Owners Group EOP Review Project ML20042G7681990-05-10010 May 1990 Submits Unsatisfactory Performance Testing Incident Repts, Per 10CFR26, Fitness for Duty. Results of Three Positive Blind Test Samples Certified to Contain No Drugs ML20043A4931990-05-10010 May 1990 Forwards Executed Amend 8 to Indemnity Agreement B-54 ML20042G2101990-05-0707 May 1990 Provides Notice of MW Kirk Permanent Reassignment from Position & Requests Termination of Senior Reactor Operator License 20481-1,effective 900505 ML20042E8611990-04-26026 April 1990 Forwards Annual Financial Repts for Six Participating Owners of Plant ML20012F2941990-03-30030 March 1990 Forwards Nonproprietary Rev to 51-1176431-02, Crystal River 3 Reactor Vessel...Temp Overpressure Protection, in Support of Tech Spec Change Request 174,Suppl 1 Re Response to Generic Ltr 88-11 ML20042D8321990-03-30030 March 1990 Provides Supplemental Response to Station Blackout Rule Implementation & Affirms That Diesel Generator Target Reliability Will Be Maintained ML20012E2041990-03-23023 March 1990 Requests Temporary Waiver of Compliance Granted on Tech Spec 3.9.8.2 Re DHR Power Source Requirements ML20012D9471990-03-21021 March 1990 Requests Approval of Capsule Withdrawal Schedule in Table 3-19 of BAW-1543,Rev 3, Master Integrated Reactor Vessel Surveillance Program to Allow Plant Refuel 7 Outage Plans to Continue on Schedule.Changes Needing NRC Approval Listed ML20012D7371990-03-19019 March 1990 Responds to Generic Ltr 89-19 Re Resolution of USI A-47. Util Will Implement Appropriate Sys to Protect Against Overfill Concerns ML20012C4501990-03-13013 March 1990 Forwards Listing of Insurance Policies in Place for Plant as of 900225 ML20012B4821990-03-0707 March 1990 Forwards Inservice Insp Pump & Valve Program Relief Request V-371 Proposing Alternate Acceptance Criteria Requirements for IWP-4150 for Fluctuations in Hydraulic Instrument Readings ML20012B3651990-03-0101 March 1990 Lists Five Addl Drugs Included in 10CFR26 Re fitness-for- Duty Testing Program.Specimens Identified as Positive on Initial Screening Will Be Confirmed Using Gas Chromatography or Mass Spectrometry at Listed cut-off Levels ML20012A4041990-02-27027 February 1990 Forwards 1989 Annual Rept of Personnel Exposure in Accordance w/10CFR20.407 & Tech Spec 6.9.1.5.(a) & Annual Rept of Facility Changes,Tests & Experiments in Accordance w/10CFR50.59 ML20006G1731990-02-23023 February 1990 Advises That Util Voluntarily Agrees to Participate in Emergency Response Data Sys Proposed in Generic Ltr 89-15 ML20011F2411990-02-21021 February 1990 Provides Followup on & Documents Discussion in 900116 Meeting Re Emergency Diesel Generator Loading 1990-09-20
[Table view] |
Text
. .
.c^re h* )
t, #
ooo Power C 0 m
- O R a y e o se November 29,1984 3F1184-21 Director of Nuclear Reactor Regulation Attention: Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Response to Generic Letter 84-15
Dear Sir:
Your Generic Letter 84-15, dated July 2,1984, requesting data and commentary related to Emergency Diesel Generator Reliability was reviewed by Florida Power Corporation (FPC).
Responses to the three areas covered follow.
- 1. REDUCTION IN NUMBER OF COLD FAST START SURVEILLANCE TESTS FOR DIESEL GENERATORS REQUEST: Describe current program to avoid cold fast start surveillance testing.
RESPONSE: FPC diesel generators are not subjected to cold fast starts for surveillance testing. Operability of the diesel generators is demonstrated in accordance with Crystal River Unit 3 (CR-3) Technical Specification 4.8.1.1.2.a.4.
That is, verifying that the diesel starts from ambient conditions and accelerates to at least 900 RPM in less than 10 seconds. However, the diesel engine coolant is continuously circulated and maintained at a temperature between 1230F and 1520F- The oil temperature is maintained at 1100F. Prior to surveillance, the oil prelube pump is run for 2 minutes.
This program was previously described in FPC's response to Generic Letter 85-14, dated January 13, 1984. The EDG capability to perform a cold fast start is demonstrated (except for timing to rated speed) through actual demands. If an actual demand shows an inability to cold fast start (start without prelubrication), the EDG would be declared inoperable and corrective actions would be initiated. FPC contends that this approach reduces cold fast starts while maintaining demonstration of cold fast start capability.
8412030377 841129 PDR ADOCK 05000302 P gO h
PDR l O G EN ERAL OFFICE 3201 Thirty fourth Street South e P.O. Box 14042, St. Petersburg. Florida 33733 e 813-866-5151 !
o L
i-November 29,1984 l 3Fil84-21 Page 2
- 2. DIESEL GENERATOR RELIABILITY DATA REQUEST: Report the reliability of each diesel. generator for its last 20 and 100 demands.
RESPONSE: Significant effort was expended in the attempt to reformat EDG records into the framework of the Regulatory Guide 1.108, position C.2.e definitions of valid tests and failures. . CR-3, a pre-1978 plant, has not committed to Regulatory Guide 1.108, and does not record diesel generator demands, failures, and successes in accordance with the Regulatory Guide Position C.2.e.
In that the reformatting could not be accomplished, the following quantitative reliability factors and the supporting data does not question the validity of the start or failure per Regulatory Guide 1.108. All start attempts and failures are assessed as valid. Undoubtedly, in the chronology.
of demands / tests for each EDG, there are attempted starts classified as valid which would be invalid, and failures noted which would be successes per the Regulatory Guide. The data is more conservative than would be the case if validity were as defined by the Regulatory Guide. The assessment quantified below resulted from a review of Non-Conforming Operations Reports (NCOR's).
EDG 3A Data and Assessment s ,
The last 20 demands started February 12,1984 and ended' August 14,1984.
There was one failure documented by NCOR 84-181 dated August 14,1984.
The last 100 demands started April 16, 1981 and ended August 14, 1984.
There were three (3) failures documented by NCOR 82-019 dated January 25,1982, NCOR 82-057 dated February 26,1982, and NCOR 84-181 dated August 14,1984.
The failure, documented by NCOR 84-181 is probably not a failure in terms of the validity definitions of the Regulatory Guide. With this test reclassified as a success, the quantified reliability is:
For the last 20 demands, reliability is 1.00/ demand.
For the last 100 demands, reliability is .98/ demand, f
t'
November 29,1984 3F1184-21 Page 3 EDG 3B Data and Assessment The last 20 demands started February 28, 1984 and ended August 15, 1984.
There was one failure documented by NCOR 84-103, dated April 23,1984.
The last 100 demands started July 2,1981 and ended August 15,1984. There were six (6) failures documented by NCOR 82-053 dated February 24,1982, NCOR 82-115 dated April 12,1982, NCOR 82-161 dated June 9,1982, NCOR 82-188 dated July 12,1982, NCOR 83-314 dated November 7,1983, and NCOR 84-103 dated April 23, 1984. The failures documented by NCOR's82-115, 82-161,82-188, and 84-103 are probably not failures in terms of the validity definitions of the Regulatory Guide. With these tests reclassified as successes, the quantified reliability is:
For the last 20 demands, relia'bility is 1.00/ demand.
For the last 100 demands, reliability is .98/ demand.
REQUEST: Licensees are requested to indicate whether they maintain a record which itemizes the demands and failures by each diesel generator unit in the manner outlined in Regulatory Guide 1.108 position C.3.a for each diesel generator unit.
RESPONSE: FPC maintains data on file for the demands on the EDG's and failures, but it is not in the form outlined in Regulatory Guide 1.108. Evaluation and analysis is for failures, not of current quantified reliability factors.
REQUEST: Licensees should also indicate whether a yearly data report is maintained for each diesel generator's reliability.
RESPCNSE: No report is maintained, but data for such a report is available.
- 3. DIESEL GENERATOR RELIABILITY REQUEST: Describe the current EDG reliability program, if any, for attaining and maintaining a reliability goal for the EDG's.
RESPONSE: Florida Power Corporation does not have a "specified" reliability program for attaining an EDG reliability goal. Florida Power does have a
, corrective action program and a number of procedures that, when combined together, do form an effective program that maintains the diesel l generators in a reliable as reasonably achievable manner. The corrective action program was developed in accordance with 10 CFR 50, Appendix B, and does include the diesel generators. A description of this is provided in the discussion of our evaluation of the NRC Example Performance j Program. The plant procedures that comprise the EDG reliability program t
include:
i
d
. November 29,1984
-3F1184-21 Page 4
- 1. Surveillance Procedures
- a. Emergency diesel generator fuel oil quality and monthly functional test.
. b. . Refueling interval engine inspection and maintenance per manufacturer's recommendations.
- c. Refueling interval engineered safeguards ir.tegrated plant.
response test (for concurrent RB high pressure signals and loss of offsite power).
2.- Preventative Maintenance Procedures 1
- a. Semi-annual electrical checks.
Check and clean stator windings Check brushes Check slip rings Stator insulation check Rotor insulation check
- b. Variable icequency (shiftly to annually) diesel generator and J
diesel generator support equipment lubrication checks (verify level) and lubrication replacement.
i
- c. Annual diesel breaker and breaker relay checks.
i
- d. Periodic inspection and cleaning the EDG air receivers for the 4-starting air. ,
- 3. Maintenance Procedures:
i -
- a. Diesel generator governor and servo-booster cleaning, '
inspection, removal and installation.
- b. Diesel generator radiator inlet piping disassembly and reassembly.
- c. Diesel generator cooling water pumps disassembly and reassembly.
- d. Diesel generator turbo-charger disassembly and reassembly.
l
' /
. - - - - - - - ~
' November 29,1984 3F1184-21 Page 5
- e. Maintenance of diesel generator switchboard meters and transducers.
- f. Diesel Generator special mounted pump disassembly and reassembly.
Following completion of Surveillance - or Preventative Maintenance Procedures, the results are reviewed by the Shift Supervisor and the responsible Shop Superintendent. This review is intended to:
- a. Identify any deficiencies.
- b. Determine if a Work Request should be initiated for corrective actions or maintenance.
- c. Determine if a Non-Conforming Operations Report (NCOR) should be i Initiated for discrepancies.
- d. Verify proper disposition of all discrepancies noted during the performance of the activity.
- e. Verify post-activity tests are complete so the equipment can be ,
- considered operable.
4
- f. Verify removal of clearance tagging.
+
When scheduling performance of the tests and preventative maintenance, as many tasks as reasonably possible are performed concurrently. This practice minimizes diesel tag-outs and, therefore, reduces the potential for
, human error during restoration to service, reduces the number of EDG restoration starts and ultimately maximizes diesel generator availability.
A significant percentage of the EDG failures are attributed to either a failure to come to rated speed in the required time or, more probably, a failure to detect time elapsed to attain rated speed and voltage. Florida ;
, Power is upgrading relay schemes and providing an elapsed time counter to '
provide more accurate assessment of time to attain rated speed and voltage for use during surveillance testing. ,
As requested, Florida Power has compared the recommendations of l- NUREG/CR-0660, " Enhancement of On-site Emergency Diesel Generator Reliability", with current plant practices.
~
Our review Indicates that appropriate recommendations of the NUREG are incorporated in designs and practices.
t 4
e k
-r w g,-, y +,p -n-- ,,y g-,-m- , , , - - , - ---,ro y m n w -r. ---m-- ----m----n- -r- ----,,-e --n a m- a e- e <w --
November 29,1984 3Fil84-21 Page 6
,w With respect to Recommendation A.2 concerning air quality in the Diesel Generator Room: the r Ays and contactors which ue located in the EDG area are enclosed inside y,asketed cabinets. Those cabinets which require cooling are louvered.
As recommended by Item B.1 concerning EDG prelube: the non-emergency EDG starts pre-lubing prior to starting.
Per Recommendation B.3 which discusses testing, test loading, and preventative maintenance: to prevent incomplete combustion, the EDG is run at greater thaa or equal to 50 percent full load for four hours.
Additionally, Florida Power Corporation performs an EDG start, run, and load prior to returning the system to service. This assures tests leads have been removed, breakers correctly aligned, etc.
As recommended by Item C.1, EDG room ventilation and combustion air inlet: the engine exhaust gas is removed from the building by the exhaust stack to the atmosphere.
Pursuant to Recommendation C.2, fuel storage and handling: Florida Power has two pumps (per EDG) to transfer fuel from the fuel oil storage tank to the day tank. One pump is AC powered and the other is DC i powered. Additionally, we have an engine driven pump and a DC powered pump to transfer fuel from the day tank to the engine.
As recommended by C.5, concrete floors: Florida Power recently painted i the floors in the EDG rooms.
t In addition, FPC has reviewed more recent publications for recommendations to enhance EDG reliability. Included in our review was INPO's SOER 83-01, Diesel Generator Failures.
FPC's design organization's program that responds to corrective action requirements also provides for potential problems or deficiencies to be identified and processed. The design organization continuously reviews various forms of technical information in order to identify potential design problems and take required action. The process goal is early problem identification and resolution, regarding any plant system or equipment. Of ten (10) EDG related projects presently in progress in - the design organization, five (5) appear to have reliability considerations.
REQUEST: . Comment on and compare the existing program, or any proposed program, with the example performance specification.
RESPONSE: Florida Power Corporation has compared and evaluated our reliability program against the Example Performance Program. , The following is a discussion of our evaluation:
- November 29,1984 3F1184-21 Page 7
- 1. Reliability Goals While Florida Power does not have a quantified Reliability Goal (such as the recommended 0.95 level), we do strive to maintain the diesels as reliable as reasonably achievable. This type of approach to re!Iability has the advantage of continuing improvements if reliability can still be reasonably improved even after attaining 95% reliability.
As described in Response 2, this approach has resulted in a quantified reliability, when conservatively assessed, very close to the NRC recommended goal. When further analyzed and more reasonably assessed, the quantified reliability is significantly better than a .95 reliability goal. Thus, Florida Power Corporation has determined that this approach should continue to be utilized.
- 2. Reliability Level Remedial Actions
- 3. Surveillance Test Frequency
- 4. Remedial Action Criteria
- 5. Requalification Criteria
- 6. Failure to Requalify an EDG Items (2) through (6) describe a ccrrective action program intended to determine whether major degradation has occurred and to require additional corrective actions for degraded diesel generators. These corrective actions include:
- a. Maintain a report that implements NUREG/CR-0660 recommendations and requires an assessment of combined off-site and on-site power reliability.
- b. "Requalify" the degraded diesel generator through extensive testing.
Florida Power Corporation, in accordance with 10 CFR 50, Appendix B, has a corrective action program that encompasses the diesel generators. This program starts with the Test Requirements (per Technical Specification and manufacturer's recommendations). If an EDG falls to meet the ;
acceptance criteria of the appropriate requirement, a "Non-Conforming Operations Report" (NCOR) is written that includes a brief description of the event, the discovery method, the apparent cause and immediate l corrective actions.
l
November 29,1984 3Fil84-21 Page 8 The NCOR is then reviewed by various plant personnel to determine appropriate actions, per the Technical Specifications, and reporting requirements. If the event was significant, the event or inoperability is evaluated to determine:
- a. The cause.
- b. The safety Implications.
- c. The failure history (i.e., has this equipment been failing frequently for the same reason).
- d. The equipment manufacturer.
- e. The corrective action, which may include actions to prevent recurrence of the failure.
Corrective actions gene' rally result in a Corrective Action Assignment which involve one or a combination of the following:
- a. Additional preventative maintenance.
- b. An Engineering Evaluation to determine if a redesign and modification is necessary. (As an example, the modification discussed earlier, related to improvement in and assessment of EDG time to attain rated speed, is resultant from NCOR's and the corrective action program.)
- c. Additional performance monitoring.
- d. Revised and/or expanded testing requirements.
The intent of these corrective actions is to address the " root cause" of the failure and thus prevent repeat failures. (This is consistent with NUREG/CR-0660, Recommendation B.4.a and b.)
The current Florida Power Corporation corrective action program does not determine the occurrence of major degradation to the extent that the proposed program does. It is important to note that the determination of degradation, as proposed, is calculated on the basis of additional, extensive diesel testing. Thus, th!s determination is made at the expense of additional diesel mechanical wear, which appears to be contrary to NUREG-1024, Technical Specifications -
Enhancind the Safety Impactl , and the intent of this Specification.
Currently, our determination of diesel degradation is based solely on failure history and does not include unnecessary additional diesel starts. Florida Power Corporation considers the current corrective action program to be adequate.
4
. November 29,1984 3Fil84-21.
' Page 9
- 7. EDG Inoperability Limits The proposed Technical Specification would allow EDG inoperability in excess of the current 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and place a yearly limit on the cumulative Inoperability time.
While this proposal does allow additional flexibility, Florida Power would not choose, at this time, to adopt it. The yearly limit could cause deferred preventative maintenance or conflicts with Surveillance Requirements if a significant amount of the allowed time has already been used.
- 8. Valid Demands and Failures Florida Power Corporation is not committed to Regulatory Guide 1.108 and, therefore, does not determine demands and failures per section C.2.e. Florida Power considers all start attempts (automatic and manual)- to be a valid test. Tests that do not indicate conformance with Technical Specification are considered to be failures, including early termination of the tests due to abnormal conditions. Florida Power also considered manufacturer's notifications (10 CFR 21), as appropriate, to indicate diesel inoperability.
- 9. Reliability Records Florida Power Corporation does not maintain reliability records as suggested by Regulatory Guide 1.108, position C.3.a. The NCOR's, previously described, and surveillance data are available to determine tests and failures. Additionally, Florida Power Corporation is a participant of INPO's " Nuclear Plant Relbbility Data System" (NPRDS). As a participant, EDG failure data is retrievable for CR-3 i and for other utilities with similar diesel generators.
- 10. ADDITIONAL COMMENTS
- a. Action Statement Test Frequency The proposed Specification would lengthen the amount of time from when an A.C. power source is inoperable to when the operability of the diesels must be' demonstrated. Additionally, the 8-hour frequency testing thereafter would be deleted.
November 29,1984 3Fil84 21-
. Page 10 f
Florida Power considers the proposed Action Statement time requirements to be an. Improvement, as it will decrease the required amount of diesel run-time and, therefore, mechanical wear. The current Specification requires testing .within one hour of inoperability and every eight hours thereafter. This could cause-1) damage to the redundant system, 2) the system or plant to be .in a more vulnerable mode, and 3) failure to return it to an operable condition 2, Florida' Power Corporation will pursue this portion of the
- proposed change as an Amendment Request. We feel that such a change can enhance plant safety.
- b. Detailed Comments 4
Florida Power has limited its comments to the portions of the Specification dealing with a reliability program. Our detailed comments on the specifics of the program and the remainder of the Specification are available upon request.
FOOTNOTES TO RESPONSE AREA 3
- 1. NUREG-1024, Technical Specifications " Enhancing the Safety Impact",
November 1983, was written by an interdisciplinary NRC Task Group to identify problems with surveillance testing and to develop alternative approaches at the request of the CRGR. The CRGR found that "too frequent testing contributes to the wear of components, unnecessary test downtimes, ..., introduction of human errors and the potential for common cause failures, and added maintenance downtimes resulting from component wear", Pages 1-5.
! 2. NUREG-1024, Pages 3-4.
i Sincerely, c '
. R. Westafer Manager, Nuclear Operations Licensing and Fuel Management DEP/feb i