Responds to Violations Noted in Insp Rept 50-302/89-01. Corrective Actions:Required Actions of AP-450, Emergency Feedwater Actuation Performed
ML20236D930
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/14/1989
From: Widell R
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0389-07, 3F389-7, NUDOCS 8903230363
Download: ML20236D930 (3)


Text

<~ ~ ,

', i Florida Power C0HPORATI0N i

j March 14, 1989  ;

3F0389-07 1 1

U. S. Nuclear Regulatory Ocnnission Attention: Document Control Desk .

Washington, D. C. 205S5 l c

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License DPR-72 Inspection Report 89-01 j

Dear Sir:

Florida Power Corporation provides the attached response to NRC Inspection Report 89-01.

Should there be any questions, please contact this office. l Very truly yours, l Rolf C. Widell Director, Nuclear Operations Site Support WLR: mag Att.

xc: Regional Administrator, Region II Senior Resident Inspector 0903230363  % 3PNV02 (

PDR ADOCK O

l \

POST OFFICE BOX 219

  • CRYSTAL RIVER, FLORIDA 326294219 * (904) 563-2943 A Florida Progress Company
m*

FIGtIDA PCHER GEtFGUTIN  !

INSMTIN REFGE 89-01 REPIX 10 NOTIN CF VICMFIN VIOU EIW 89-01-03

_ Technical Specification (TS) 6.8.1.a requires the implementation of written prrrwhmas for those activities reccanended in Appendix "A" of Regulatory Guide ,

' 1.33, Novernber 1972. l Regulatory Guide 1.33, Appendix "A", _ Section B.1 re1-ads pIVoedures for $

plant startup and heatup.

Operating Procedure OP-202, Plant Heatup, step 5.5.14, directs that the Reactor  !

Protection System (RPS) channels be removed frun shutdown bypass. h caution- 8 note associated with this step states that if at least one main feedwater punp is not latched prior to removing the RPS channels fran shutdown bypass, an emergency feedwater actuation may m,w. ,

Contrary to the above, on January 15, 1989, while performing a plant heatup, at- .'

least one main feedwater punp did not remain latched while -the RPS channels were removed fran shutdown bypass which resulted in an inadvertent actuation of-the emergency feedwater system.  :

This is a Severity Isvel IV Violation (Supplement I).

FIMIDA IMER C35WATIN RESPGEE l Florida Power Corporation (FPC) accepts the violation. This violation was l reported in accordance with 10CFR50.73 as IER 89-03. i APPARENT CPOSE OF VIOIATIW The cause of the event was personnel error. The operator failed to recall the n4xlification which removed the auto bypass of EFIC, actuation below 20%. The l shift supervisor reviewed the procedure for the Main Feedwater Pump startup j and he also failed to recall the modification .which removed the auto bypass of EPIC actuation below 20%. The procedures did not provide . specific guidance on I the performance of these evolutions concurrently -and' are considered to be a  !

contributing factor.

~

4 i

(MRECTIVE ACTIGE The reglired actions of AP-450, Emergency Feedwater Actuation, were performed. j The cause of the EFIC actuation was immediately llentified and there were'no j!

indications of other abnormal conditions. The Main Feedwater Punp ,was relatched and the EFIC systen was restored to its wtomatic standby status. ,

DME OF FUIL CCMPLIANT Full otmpliance was achieved at 0438 on January 14,1989 when the EFIC system was restored.

!crICH TAlEN TO PREVENT RECURRENCE

.4 O

ACTI(N TMQN 'IO HEVENT RBQJRRENCE Operations Management held a meeting for shift supervisors and assistant shift supervisors to diarnaa the inspector's concern involving the supervisory weakness durirg this event. 'Ihis event and associated corrective actions will be reviewed with all cont.rol board operators in order to enhance awareness and prevent recurrence.

OP-202, Plant Heatup, will be revised to instruct the operator to cmplete the applicable portion of OP-605, Feedwater System, before continuing,

'Ihe "CAUTICN" following Step 5.5.13 of OP-202 will be revised to indicate that an EFIC actuation will occur if the shutdown bypass is removed and both Main Feedwater Punps are trigxd.

OP-605, Feedwater System, will b3 revised to include this same " CAUTION".