3F0289-05, Forwards Listed Annual Repts for 1988 Covering Reactor Vessel Surveillance Capsules,Challenges to Pressurizer PORV & Safety Valves,Facility Changes,Tests & Experiments & Personnel Exposure

From kanterella
Jump to navigation Jump to search
Forwards Listed Annual Repts for 1988 Covering Reactor Vessel Surveillance Capsules,Challenges to Pressurizer PORV & Safety Valves,Facility Changes,Tests & Experiments & Personnel Exposure
ML20235E701
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/10/1989
From: Widell R
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20235E705 List:
References
3F0289-05, 3F289-5, NUDOCS 8902220102
Download: ML20235E701 (4)


Text

. _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

. ,4

' ' Je u v'

    • C 8
  • Ek ' k$,**

Florida Power CORPORAT4ON February 10, 1989 3F0289-05 Document Control Desk U.S. Nuclear Regulatory Commission-Washington, D.C. 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 1988 Annual Reports

Dear Sir:

The following annual reports are submitted for the year 1988.

1. Annual Report of Reactor Vessel Surveillance Capsules in g accordance with Technical Specification 6.9.1.5.b.
2. Annual Report of Challenges to Pressurizer PORV and Safety

. Valves in accordance with Technical Specification 6.9.1.5.e.

3. Annual Report of Facility Changes, Tests, and Experiments in accordance with 10CFR50.59(b).
4. Annual Report of Personnel Exposure in accordance with 10CFR20.407 and Technical Specification 6.9.1.5.a.

Sincerely, I

i l

Rolf C. Widell, Director Nuclear Operations Site Support RCW/JWT/sdr Attachment xc: Regional Administrator, Region II p

Senior Resident Inspector

(

8902220102 890210 l ADOCK 05000302 PDR PDC R

GENERAL OFFICE: 3201 Thirty fourth Street South + P.O. Box 14042

  • St. Petersburg, Florida 33733 + (813) 866-5151 A Florida Progress Company l

a s- '

D calsmL RIVER IMIT 3 smem mumL Rnue m mam ven. namuAL SmtvErTIANCE CAPSDIES AS REUIIRED BY SIS 6.9.1.5. (b) 1 REEUTDG PERECB JANUARY 1,198810 INT 5H!R 31,1988 ) '

1

??les QaTently Ir#alled Holder Capsules Tube Position Installed ZY Top OC3-F Bottom CR3-A i

XW Top CR3-E Bottm 'IMIl-B YX Top 'IMI2-D Bott m OC3-D YZ Top 'IMI2-IG1 I Bott m 'IMI2-IG2 I

y WZ 'Ibp OC2-B Bott a m3-IG2 WX Top OC3-C Bottm 'IMIl-F DSHEICN/WI'IfERAHAL SW9mRY

'Ihe reactor head was not removed during 1988 and therefore no insertions or withdrawals have ocxxtrred.

O

b -

0 0 Ol#ERSEDP OF O@SUIES Florida Power Corporation:

CR3-A C83-E G3-IG2 (B&W Owners Group)

Duke Power Ocmpany:

OC2-B OC3-C OC3-D OC3-F Eta. p litan Edison Otmpany:

'IMIl-B M 1-F M 2-D M 2-IG1 (B&W Owners Group)

O M2-IG2 (B&W Owners Group) i i

IRRADIATION I.OCNTIN Same as listed above O

F r

QUdLENES 'IO mwmzm PRr.TRP Alg) nnr1P SAFETY VAIRES KR 1988 I

l

'Ihe Power Operated Relief Valve (RCV-10) was operated two (2) times during 1988. Both operations were durirq plant startup per OP-202. One was the January startup, the other was the OcWr startup. Two other plant startups were perfonned, but the plant had not been below node 3 and therefore the KEV was not operated.