3F0288-09, Forwards Inservice Insp Plan, Per ASME Boiler & Pressure Vessel Code,Section Xi,Article IWA-1400(c), Describing Inservice Insp Activities for Next 10 Yrs. Description of Util Control Process for Plan Also Encl

From kanterella
(Redirected from 3F0288-09)
Jump to navigation Jump to search
Forwards Inservice Insp Plan, Per ASME Boiler & Pressure Vessel Code,Section Xi,Article IWA-1400(c), Describing Inservice Insp Activities for Next 10 Yrs. Description of Util Control Process for Plan Also Encl
ML20196C491
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/09/1988
From: Ken Wilson
FLORIDA POWER CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20196C493 List:
References
3F0288-09, 3F288-9, NUDOCS 8802160121
Download: ML20196C491 (2)


Text

. .

..e, o 00 j;L e gy0 00;

b. , , , **

Florida Power C 0 R P O R AT IO N February 9, 1988 3F0288-09 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 NDE/ Inservice Inspection Plan (1983 Edition)

Dear Sir:

Florida Power Corporation (FPC) hereby submits the Inservice Inspection (ISI) Plan as required by the 1983 Edition of the ASME Boiler and Pressure Vessel Code,Section XI, Article IWA-1400(c).

Title 10 Code of Federal Regulations, 50.55a(g) requires that the Inservice Inspection and Testing Programs be updated every ten years to a new Edition of Section XI. This Plan is based on the 1983 Edition, through Summer 1983 addenda and describes our inservice inspection activities for the next ten years (ending March 15, 1997). Also attached is a description of FPC's control process for this Plan.

The ISI Plan is a general document specifically wr tten for submittal to the NRC. It is part of a larger, more detai?ad program document which includes Examination Procedures, detailed Schedules Drawings, etc. The Program is maintained onsite and is available for review by NRC staff.

Relief Requests associated with the 1983 Edition of Section XI for the Plan are under development and will be submitted under separate cover.

Sincerely, 21gg %2 2 M N Od K.R. Wilson, Manager  !

Nuclear Licensing l l PGH/dhd xc: See Next Page Post Office Box 219

  • Telephone (904) 795-3802 A Florida Progress Company

xc: Dr. J. Nelson Grace Regional Administrator, Region II Mr. T.F. Stetka Senior Resident Inspector l

l t

!