05000333/LER-1981-021, Forwards LER 81-021/03L-0
ML19350B988 | |
Person / Time | |
---|---|
Site: | FitzPatrick |
Issue date: | 03/19/1981 |
From: | Pasternak R POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
Shared Package | |
ML19350B989 | List:
|
References | |
JAFP-81-0263, JAFP-81-263, NUDOCS 8103240596 | |
Download: ML19350B988 (1) | |
Similar Documents at FitzPatrick | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217M1851999-10-19019 October 1999
[Table view]Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates JPN-99-035, Forwards Comments on Version 2 of Reactor Vessel Integrity Database for Plant.Table Listing Recommended Changes to Info in Rvid,Encl as Attachment 11999-10-15015 October 1999 Forwards Comments on Version 2 of Reactor Vessel Integrity Database for Plant.Table Listing Recommended Changes to Info in Rvid,Encl as Attachment 1 JPN-99-034, Forwards Proposed risk-informed ISI Program,Provided from NRC Review & Approval as Alternative to Current ASME Section XI Insp Requirements for Class 1 & 2 Piping1999-10-13013 October 1999 Forwards Proposed risk-informed ISI Program,Provided from NRC Review & Approval as Alternative to Current ASME Section XI Insp Requirements for Class 1 & 2 Piping JPN-99-033, Provides Response to Questions Contained in 990712,facsimile from NRC Re Ja FitzPatrick USI A-46 Program.Questions Were Also Discussed Between Members of Util & NRC Staff During Telcon1999-10-0808 October 1999 Provides Response to Questions Contained in 990712,facsimile from NRC Re Ja FitzPatrick USI A-46 Program.Questions Were Also Discussed Between Members of Util & NRC Staff During Telcon JPN-99-030, Forwards Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases to Extend LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days1999-09-29029 September 1999 Forwards Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases to Extend LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days JPN-99-032, Forwards Info Re Potential Environ Effects of Alternatives to Proposed Expansion of FitzPatrick Spent Fuel Pool,In Response to NRC Project Manager Request1999-09-29029 September 1999 Forwards Info Re Potential Environ Effects of Alternatives to Proposed Expansion of FitzPatrick Spent Fuel Pool,In Response to NRC Project Manager Request ML20212F8341999-09-22022 September 1999 Forwards Insp Rept 50-333/99-07 on 990718-0828.No Violations Noted JAFP-99-0262, Forwards Voluntary Response to Administrative Ltr 99-03, Re Preparation & Scheduling of Operator Licensing Exams. Completed NRC Form 536,containing Info Re Proposed Exam Preparation Schedule & Initial Operator License Exams,Encl1999-09-16016 September 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Re Preparation & Scheduling of Operator Licensing Exams. Completed NRC Form 536,containing Info Re Proposed Exam Preparation Schedule & Initial Operator License Exams,Encl ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics JAFP-99-0258, Forwards Operator License Restriction Change for Tj Pelton, License SOP-10090-3.License Is Requested to Be Reissued with Restriction for Corrective Lenses.Encl Withheld1999-09-0808 September 1999 Forwards Operator License Restriction Change for Tj Pelton, License SOP-10090-3.License Is Requested to Be Reissued with Restriction for Corrective Lenses.Encl Withheld ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues JPN-99-028, Informs That Util Requires Extension from 990901 to 1015,to Complete Review of Rvid & Forward Comments to Nrc,Per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity1999-08-30030 August 1999 Informs That Util Requires Extension from 990901 to 1015,to Complete Review of Rvid & Forward Comments to Nrc,Per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity JAFP-99-0247, Forwards JAFNPP Effluent & Waste Disposal Semi-Annual Rept for 990101-0630, IAW Amend 93,App B,Section 7.3.C of Plant Ts.Format Used for Rept Is Outlined in App B of Reg Guide 1.21,Rev 1.Distribution Is IAW Reg Guide 10.1,Rev 41999-08-26026 August 1999 Forwards JAFNPP Effluent & Waste Disposal Semi-Annual Rept for 990101-0630, IAW Amend 93,App B,Section 7.3.C of Plant Ts.Format Used for Rept Is Outlined in App B of Reg Guide 1.21,Rev 1.Distribution Is IAW Reg Guide 10.1,Rev 4 JAFP-99-0245, Informs That Two Licensed Operators Have Returned to Site Upon Release for Normal Duties by Physician.R Korthas, License OP-11159,meets ANSI Std 3.4-1983 & R Sarkissian License SOP-10007-3,was Terminated in Mar 19991999-08-19019 August 1999 Informs That Two Licensed Operators Have Returned to Site Upon Release for Normal Duties by Physician.R Korthas, License OP-11159,meets ANSI Std 3.4-1983 & R Sarkissian License SOP-10007-3,was Terminated in Mar 1999 ML20210U2621999-08-12012 August 1999 Forwards Insp Rept 50-333/99-06 on 990601-0717.No Violations Noted JPN-99-026, Forwards Relief Requests 18 & 19 to Jaf ISI Program Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) & Relief from ASME Section XI Code Re Insp of RPV Vertical Shell & Shell to Flange Welds1999-08-0505 August 1999 Forwards Relief Requests 18 & 19 to Jaf ISI Program Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) & Relief from ASME Section XI Code Re Insp of RPV Vertical Shell & Shell to Flange Welds JPN-99-025, Forwards Relief Request 17 Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) for Reactor Pressure Vessel Circumferential Shell Weld Exams1999-08-0505 August 1999 Forwards Relief Request 17 Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) for Reactor Pressure Vessel Circumferential Shell Weld Exams ML20216D9421999-07-28028 July 1999 Forwards Safety Evaluation Granting Requests for Relief from Requirements of ASME Code,Section XI for Second 10-year ISI Interval for James a FitzPatrick NPP JAFP-99-0229, Forwards Three Sets of Corrected Summaries of Changes for Inclusion Into Security Plan for Ja FitzPatrick Nuclear Power Plant,Rev 19 & Security Contingency Plan,Rev 5.Encls Withheld Per 10CFR73.21 & 10CFR2.790)d)(1)1999-07-22022 July 1999 Forwards Three Sets of Corrected Summaries of Changes for Inclusion Into Security Plan for Ja FitzPatrick Nuclear Power Plant,Rev 19 & Security Contingency Plan,Rev 5.Encls Withheld Per 10CFR73.21 & 10CFR2.790)d)(1) JAFP-99-0228, Forwards Rept Re Changes & Errors in ECCS Evaluation Models, Per 10CFR50.46(a)(3)(ii) for Period from 980701-990630.No Commitments Contained in Submittal1999-07-21021 July 1999 Forwards Rept Re Changes & Errors in ECCS Evaluation Models, Per 10CFR50.46(a)(3)(ii) for Period from 980701-990630.No Commitments Contained in Submittal ML20210A7001999-07-16016 July 1999 Forwards Request for Addl Info to Supplement Response Provided for GL 97-05, Steam Generator Tube Insp Techniques JAFP-99-0208, Provides Clarification of Info Re Proposed Its, & 0601.Table Reconciling Differences,Encl1999-07-14014 July 1999 Provides Clarification of Info Re Proposed Its, & 0601.Table Reconciling Differences,Encl ML20209D5511999-07-0606 July 1999 Informs That as Result of NRC Review of Licensee Response to GL 92-01,rev 1,suppl 1,staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210C9031999-06-30030 June 1999 Summarizes Impact of Changes & Errors in Methodology Used by GE to Demonstrate Compliance with ECCS Requirements of 10CFR50.46.Summary of Changes & Errors Provided in Attached Table 05000333/LER-1999-003-01, Forwards LER 99-003-01 Re SRV Setpoint Drift.Revised Rept Is Being Submitted to Change Commitment Due Date Made in Original LER1999-06-28028 June 1999 Forwards LER 99-003-01 Re SRV Setpoint Drift.Revised Rept Is Being Submitted to Change Commitment Due Date Made in Original LER JPN-99-021, Forwards Application for Amend to License DPR-59,changing to Pressure Temp Limits.Pressure Temp Curves & Associated LCO & Bases Changes Included in Proposed Amend1999-06-22022 June 1999 Forwards Application for Amend to License DPR-59,changing to Pressure Temp Limits.Pressure Temp Curves & Associated LCO & Bases Changes Included in Proposed Amend JPN-99-020, Submits Response to RAI Re ISI Program Relief Requests for Second 10-yr Interval Closeout & Summary Rept,Per 990426 Telcon with Nrc.Info Provided to Clarify or Withdraw Individual Relief Requests Contained in Summary Rept1999-06-21021 June 1999 Submits Response to RAI Re ISI Program Relief Requests for Second 10-yr Interval Closeout & Summary Rept,Per 990426 Telcon with Nrc.Info Provided to Clarify or Withdraw Individual Relief Requests Contained in Summary Rept ML20196G2981999-06-18018 June 1999 Forwards Insp Rept 50-333/99-04 on 990412 to 0529.Violations Being Treated as non-cited Violations ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First JPN-99-019, Withdraws Recent Exemption Request Re 10CFR50,App R, Use of Core Spray to Achieve Safe Shutdown. Exemption Dealt with Use of Core Spray for Reactor Coolant Makeup to Achieve Safe Shutdown in One Fire Area at Plant1999-06-15015 June 1999 Withdraws Recent Exemption Request Re 10CFR50,App R, Use of Core Spray to Achieve Safe Shutdown. Exemption Dealt with Use of Core Spray for Reactor Coolant Makeup to Achieve Safe Shutdown in One Fire Area at Plant ML20196L1451999-06-0707 June 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Ss Bajwa Will Be Section Chief for Ja Fitzpatrick & Indian Point NPPs JPN-99-018, Forwards Revised Application,Previously Submitted,For Amend to Plant TS for Converting CTS to ITS Consistent with Improved Std TS (NUREG-1433,Rev 1)1999-06-0101 June 1999 Forwards Revised Application,Previously Submitted,For Amend to Plant TS for Converting CTS to ITS Consistent with Improved Std TS (NUREG-1433,Rev 1) ML20207D9191999-05-27027 May 1999 Informs That on 990521 NRC Staff Held Planning Meeting to Identify Insp Activities at Facility Over Next Six Months JAFP-99-0171, Forwards Revised Ja FitzPatrick Nuclear Power Plant 1999 FSAR Update. Update Also Includes Changes to Chapter 17, QA Program Which Described in Attachment 1.No Commitments Contained in Ltr1999-05-20020 May 1999 Forwards Revised Ja FitzPatrick Nuclear Power Plant 1999 FSAR Update. Update Also Includes Changes to Chapter 17, QA Program Which Described in Attachment 1.No Commitments Contained in Ltr JPN-99-016, Forwards Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys.Commitment Made by Util,Encl1999-05-19019 May 1999 Forwards Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys.Commitment Made by Util,Encl ML20207A6751999-05-17017 May 1999 Forwards RAI Re 960626 Submittal & Suppl Related to IPEEEs for Plant.Licensee Committed to Revise Plant Fire IPEEE to Reflect Issues Associated with EPRI Fire PRA Implementation Guide within 120 Days of Issues Resolution JAFP-99-0168, Forwards Eight Operator License Renewal Applications for Listed Individuals.Without Encls1999-05-13013 May 1999 Forwards Eight Operator License Renewal Applications for Listed Individuals.Without Encls ML20206N0721999-05-11011 May 1999 Forwards Insp Rept 50-333/99-03 on 990301-0411.Four Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy JAFP-99-0160, Forwards 1998 Annual Radiological Environ Operating Rept for Ja FitzPatrick Nuclear Power Plant. Distribution for Rept Is IAW Reg Guide 10.1,Rev 41999-04-30030 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Ja FitzPatrick Nuclear Power Plant. Distribution for Rept Is IAW Reg Guide 10.1,Rev 4 ML20206C8551999-04-27027 April 1999 Informs That Util 990406 Submittal, Licensing Rept for Reracking of Ja FitzPatrick Spent Fuel Pool,Rev 7, Will Be Marked as Proprietary & Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) ML20205T1141999-04-22022 April 1999 Provides Comments from Technical Review of Draft Info Notice Re Unanticipated Reactor Water Draindown at Quad Cities Nuclear Power Station,Unit 2,ANO,Unit 2 & JAFNPP JPN-99-012, Informs That Authority Identified Typographical Error on Page 3 of Attachment 3 of 990331 Response to NRC RAI Re App R.Corrected Response to NRC Question 3 Is Attached1999-04-16016 April 1999 Informs That Authority Identified Typographical Error on Page 3 of Attachment 3 of 990331 Response to NRC RAI Re App R.Corrected Response to NRC Question 3 Is Attached ML20205P4641999-04-15015 April 1999 Forwards for Review & Comment Draft Info Notice That Describes Unanticipated Reactor Water Draindown at Quad Cities Nuclear Power Station Unit 2,Arkansas Nuclear One Unit 2 & Ja Fitzpatrick NPP ML20205P1991999-04-0909 April 1999 Discusses 990224 PPR & Forwards Plant Issues Matrix & Insp Plan.Advises of Planned Insp Effort Resulting from Plant PPR Review JAFP-99-0129, Submits Comments on Technical Review of Draft Info Notice Describing Unanticipated Reactor Water Draindown at Quad Cities Unit 2,ANO & FitzPatrick1999-04-0909 April 1999 Submits Comments on Technical Review of Draft Info Notice Describing Unanticipated Reactor Water Draindown at Quad Cities Unit 2,ANO & FitzPatrick JAFP-99-0127, Forwards Affidavit Signed by Holtec Which Describes Proprietary Nature of Licensing Rept & Addresses Considerations Listed in 10CFR2.790.Attachment 4 in Util Re Design Features Should Be Withheld1999-04-0808 April 1999 Forwards Affidavit Signed by Holtec Which Describes Proprietary Nature of Licensing Rept & Addresses Considerations Listed in 10CFR2.790.Attachment 4 in Util Re Design Features Should Be Withheld JAFP-99-0124, Forwards Rev 19 to JAFNPP Security Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Safeguards Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1)1999-04-0707 April 1999 Forwards Rev 19 to JAFNPP Security Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Safeguards Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1) JAFP-99-0125, Forwards Rev 5 to JAFNPP Security Contingency Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1)1999-04-0707 April 1999 Forwards Rev 5 to JAFNPP Security Contingency Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1) ML20205M8941999-04-0707 April 1999 Forwards Rev 21 to App C of JAFNPP Emergency Plan & Rev 1 to EAP-32, Recovery Support Group Manager 1999-09-09 Category:INCOMING CORRESPONDENCE MONTHYEARJPN-99-035, Forwards Comments on Version 2 of Reactor Vessel Integrity Database for Plant.Table Listing Recommended Changes to Info in Rvid,Encl as Attachment 11999-10-15015 October 1999
[Table view]Forwards Comments on Version 2 of Reactor Vessel Integrity Database for Plant.Table Listing Recommended Changes to Info in Rvid,Encl as Attachment 1 JPN-99-034, Forwards Proposed risk-informed ISI Program,Provided from NRC Review & Approval as Alternative to Current ASME Section XI Insp Requirements for Class 1 & 2 Piping1999-10-13013 October 1999 Forwards Proposed risk-informed ISI Program,Provided from NRC Review & Approval as Alternative to Current ASME Section XI Insp Requirements for Class 1 & 2 Piping JPN-99-033, Provides Response to Questions Contained in 990712,facsimile from NRC Re Ja FitzPatrick USI A-46 Program.Questions Were Also Discussed Between Members of Util & NRC Staff During Telcon1999-10-0808 October 1999 Provides Response to Questions Contained in 990712,facsimile from NRC Re Ja FitzPatrick USI A-46 Program.Questions Were Also Discussed Between Members of Util & NRC Staff During Telcon JPN-99-030, Forwards Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases to Extend LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days1999-09-29029 September 1999 Forwards Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases to Extend LCO Allowable Out of Service Time for RHRSW Sys from 7 Days to 11 Days JPN-99-032, Forwards Info Re Potential Environ Effects of Alternatives to Proposed Expansion of FitzPatrick Spent Fuel Pool,In Response to NRC Project Manager Request1999-09-29029 September 1999 Forwards Info Re Potential Environ Effects of Alternatives to Proposed Expansion of FitzPatrick Spent Fuel Pool,In Response to NRC Project Manager Request JAFP-99-0262, Forwards Voluntary Response to Administrative Ltr 99-03, Re Preparation & Scheduling of Operator Licensing Exams. Completed NRC Form 536,containing Info Re Proposed Exam Preparation Schedule & Initial Operator License Exams,Encl1999-09-16016 September 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Re Preparation & Scheduling of Operator Licensing Exams. Completed NRC Form 536,containing Info Re Proposed Exam Preparation Schedule & Initial Operator License Exams,Encl JAFP-99-0258, Forwards Operator License Restriction Change for Tj Pelton, License SOP-10090-3.License Is Requested to Be Reissued with Restriction for Corrective Lenses.Encl Withheld1999-09-0808 September 1999 Forwards Operator License Restriction Change for Tj Pelton, License SOP-10090-3.License Is Requested to Be Reissued with Restriction for Corrective Lenses.Encl Withheld JPN-99-028, Informs That Util Requires Extension from 990901 to 1015,to Complete Review of Rvid & Forward Comments to Nrc,Per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity1999-08-30030 August 1999 Informs That Util Requires Extension from 990901 to 1015,to Complete Review of Rvid & Forward Comments to Nrc,Per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity JAFP-99-0247, Forwards JAFNPP Effluent & Waste Disposal Semi-Annual Rept for 990101-0630, IAW Amend 93,App B,Section 7.3.C of Plant Ts.Format Used for Rept Is Outlined in App B of Reg Guide 1.21,Rev 1.Distribution Is IAW Reg Guide 10.1,Rev 41999-08-26026 August 1999 Forwards JAFNPP Effluent & Waste Disposal Semi-Annual Rept for 990101-0630, IAW Amend 93,App B,Section 7.3.C of Plant Ts.Format Used for Rept Is Outlined in App B of Reg Guide 1.21,Rev 1.Distribution Is IAW Reg Guide 10.1,Rev 4 JAFP-99-0245, Informs That Two Licensed Operators Have Returned to Site Upon Release for Normal Duties by Physician.R Korthas, License OP-11159,meets ANSI Std 3.4-1983 & R Sarkissian License SOP-10007-3,was Terminated in Mar 19991999-08-19019 August 1999 Informs That Two Licensed Operators Have Returned to Site Upon Release for Normal Duties by Physician.R Korthas, License OP-11159,meets ANSI Std 3.4-1983 & R Sarkissian License SOP-10007-3,was Terminated in Mar 1999 JPN-99-026, Forwards Relief Requests 18 & 19 to Jaf ISI Program Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) & Relief from ASME Section XI Code Re Insp of RPV Vertical Shell & Shell to Flange Welds1999-08-0505 August 1999 Forwards Relief Requests 18 & 19 to Jaf ISI Program Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) & Relief from ASME Section XI Code Re Insp of RPV Vertical Shell & Shell to Flange Welds JPN-99-025, Forwards Relief Request 17 Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) for Reactor Pressure Vessel Circumferential Shell Weld Exams1999-08-0505 August 1999 Forwards Relief Request 17 Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) for Reactor Pressure Vessel Circumferential Shell Weld Exams JAFP-99-0229, Forwards Three Sets of Corrected Summaries of Changes for Inclusion Into Security Plan for Ja FitzPatrick Nuclear Power Plant,Rev 19 & Security Contingency Plan,Rev 5.Encls Withheld Per 10CFR73.21 & 10CFR2.790)d)(1)1999-07-22022 July 1999 Forwards Three Sets of Corrected Summaries of Changes for Inclusion Into Security Plan for Ja FitzPatrick Nuclear Power Plant,Rev 19 & Security Contingency Plan,Rev 5.Encls Withheld Per 10CFR73.21 & 10CFR2.790)d)(1) JAFP-99-0228, Forwards Rept Re Changes & Errors in ECCS Evaluation Models, Per 10CFR50.46(a)(3)(ii) for Period from 980701-990630.No Commitments Contained in Submittal1999-07-21021 July 1999 Forwards Rept Re Changes & Errors in ECCS Evaluation Models, Per 10CFR50.46(a)(3)(ii) for Period from 980701-990630.No Commitments Contained in Submittal JAFP-99-0208, Provides Clarification of Info Re Proposed Its, & 0601.Table Reconciling Differences,Encl1999-07-14014 July 1999 Provides Clarification of Info Re Proposed Its, & 0601.Table Reconciling Differences,Encl ML20210C9031999-06-30030 June 1999 Summarizes Impact of Changes & Errors in Methodology Used by GE to Demonstrate Compliance with ECCS Requirements of 10CFR50.46.Summary of Changes & Errors Provided in Attached Table 05000333/LER-1999-003-01, Forwards LER 99-003-01 Re SRV Setpoint Drift.Revised Rept Is Being Submitted to Change Commitment Due Date Made in Original LER1999-06-28028 June 1999 Forwards LER 99-003-01 Re SRV Setpoint Drift.Revised Rept Is Being Submitted to Change Commitment Due Date Made in Original LER JPN-99-021, Forwards Application for Amend to License DPR-59,changing to Pressure Temp Limits.Pressure Temp Curves & Associated LCO & Bases Changes Included in Proposed Amend1999-06-22022 June 1999 Forwards Application for Amend to License DPR-59,changing to Pressure Temp Limits.Pressure Temp Curves & Associated LCO & Bases Changes Included in Proposed Amend JPN-99-020, Submits Response to RAI Re ISI Program Relief Requests for Second 10-yr Interval Closeout & Summary Rept,Per 990426 Telcon with Nrc.Info Provided to Clarify or Withdraw Individual Relief Requests Contained in Summary Rept1999-06-21021 June 1999 Submits Response to RAI Re ISI Program Relief Requests for Second 10-yr Interval Closeout & Summary Rept,Per 990426 Telcon with Nrc.Info Provided to Clarify or Withdraw Individual Relief Requests Contained in Summary Rept JPN-99-019, Withdraws Recent Exemption Request Re 10CFR50,App R, Use of Core Spray to Achieve Safe Shutdown. Exemption Dealt with Use of Core Spray for Reactor Coolant Makeup to Achieve Safe Shutdown in One Fire Area at Plant1999-06-15015 June 1999 Withdraws Recent Exemption Request Re 10CFR50,App R, Use of Core Spray to Achieve Safe Shutdown. Exemption Dealt with Use of Core Spray for Reactor Coolant Makeup to Achieve Safe Shutdown in One Fire Area at Plant JPN-99-018, Forwards Revised Application,Previously Submitted,For Amend to Plant TS for Converting CTS to ITS Consistent with Improved Std TS (NUREG-1433,Rev 1)1999-06-0101 June 1999 Forwards Revised Application,Previously Submitted,For Amend to Plant TS for Converting CTS to ITS Consistent with Improved Std TS (NUREG-1433,Rev 1) JAFP-99-0171, Forwards Revised Ja FitzPatrick Nuclear Power Plant 1999 FSAR Update. Update Also Includes Changes to Chapter 17, QA Program Which Described in Attachment 1.No Commitments Contained in Ltr1999-05-20020 May 1999 Forwards Revised Ja FitzPatrick Nuclear Power Plant 1999 FSAR Update. Update Also Includes Changes to Chapter 17, QA Program Which Described in Attachment 1.No Commitments Contained in Ltr JPN-99-016, Forwards Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys.Commitment Made by Util,Encl1999-05-19019 May 1999 Forwards Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys.Commitment Made by Util,Encl JAFP-99-0168, Forwards Eight Operator License Renewal Applications for Listed Individuals.Without Encls1999-05-13013 May 1999 Forwards Eight Operator License Renewal Applications for Listed Individuals.Without Encls JAFP-99-0160, Forwards 1998 Annual Radiological Environ Operating Rept for Ja FitzPatrick Nuclear Power Plant. Distribution for Rept Is IAW Reg Guide 10.1,Rev 41999-04-30030 April 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Ja FitzPatrick Nuclear Power Plant. Distribution for Rept Is IAW Reg Guide 10.1,Rev 4 ML20205T1141999-04-22022 April 1999 Provides Comments from Technical Review of Draft Info Notice Re Unanticipated Reactor Water Draindown at Quad Cities Nuclear Power Station,Unit 2,ANO,Unit 2 & JAFNPP JPN-99-012, Informs That Authority Identified Typographical Error on Page 3 of Attachment 3 of 990331 Response to NRC RAI Re App R.Corrected Response to NRC Question 3 Is Attached1999-04-16016 April 1999 Informs That Authority Identified Typographical Error on Page 3 of Attachment 3 of 990331 Response to NRC RAI Re App R.Corrected Response to NRC Question 3 Is Attached JAFP-99-0129, Submits Comments on Technical Review of Draft Info Notice Describing Unanticipated Reactor Water Draindown at Quad Cities Unit 2,ANO & FitzPatrick1999-04-0909 April 1999 Submits Comments on Technical Review of Draft Info Notice Describing Unanticipated Reactor Water Draindown at Quad Cities Unit 2,ANO & FitzPatrick JAFP-99-0127, Forwards Affidavit Signed by Holtec Which Describes Proprietary Nature of Licensing Rept & Addresses Considerations Listed in 10CFR2.790.Attachment 4 in Util Re Design Features Should Be Withheld1999-04-0808 April 1999 Forwards Affidavit Signed by Holtec Which Describes Proprietary Nature of Licensing Rept & Addresses Considerations Listed in 10CFR2.790.Attachment 4 in Util Re Design Features Should Be Withheld JAFP-99-0124, Forwards Rev 19 to JAFNPP Security Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Safeguards Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1)1999-04-0707 April 1999 Forwards Rev 19 to JAFNPP Security Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Safeguards Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1) JAFP-99-0125, Forwards Rev 5 to JAFNPP Security Contingency Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1)1999-04-0707 April 1999 Forwards Rev 5 to JAFNPP Security Contingency Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1) ML20205M8941999-04-0707 April 1999 Forwards Rev 21 to App C of JAFNPP Emergency Plan & Rev 1 to EAP-32, Recovery Support Group Manager JPN-99-011, Forwards Application for Amend to License DPR-59,removing Position Title of General Manager from Sections & Will Delegate Responsibilities to Another Staff Member,In Writing1999-04-0505 April 1999 Forwards Application for Amend to License DPR-59,removing Position Title of General Manager from Sections & Will Delegate Responsibilities to Another Staff Member,In Writing ML20205G4111999-03-31031 March 1999 Forwards Rev 7 to JAFNPP EP App J & Rev 6,pages 7 & 8 to EAP-5.3 JPN-99-008, Forwards Application for Amend to License DPR-59,converting CTS to Be Consistent with Improved Std TS in NUREG-1433, Rev 1.Synopsis of LAR for Conversion to Its,Pending Lars, List of Subsections,Scope of Changes & Commitments,Encl1999-03-31031 March 1999 Forwards Application for Amend to License DPR-59,converting CTS to Be Consistent with Improved Std TS in NUREG-1433, Rev 1.Synopsis of LAR for Conversion to Its,Pending Lars, List of Subsections,Scope of Changes & Commitments,Encl JPN-99-010, Transmits Revised Exemption Request from Some of Requirements of 10CFR50,App R.Exemption Would Permit Use of CS for Rc Makeup to Achieve Safe Shutdown in Fire Area XI at JAFNPP1999-03-31031 March 1999 Transmits Revised Exemption Request from Some of Requirements of 10CFR50,App R.Exemption Would Permit Use of CS for Rc Makeup to Achieve Safe Shutdown in Fire Area XI at JAFNPP 05000333/LER-1999-001-01, Forwards LER 99-001-01 Re Incorrect EDG line-up During Fire Placing Plant in Outside Design Basis.Suppl Contains Results of Completed Root Cause Evaluations & Subsequent Corrective Actions Taken.Rept Contains No Commitments1999-03-31031 March 1999 Forwards LER 99-001-01 Re Incorrect EDG line-up During Fire Placing Plant in Outside Design Basis.Suppl Contains Results of Completed Root Cause Evaluations & Subsequent Corrective Actions Taken.Rept Contains No Commitments JAFP-99-0112, Informs of Util Determination That Listed Individuals No Longer Need to Maintain Operating License for Ja FitzPatrick Nuclear Plant.Termination of Listed Licenses,Requested1999-03-29029 March 1999 Informs of Util Determination That Listed Individuals No Longer Need to Maintain Operating License for Ja FitzPatrick Nuclear Plant.Termination of Listed Licenses,Requested JAFP-99-0114, Requests That License OP-11037,for Bs Brooks,Be re-issued Without Restriction for Corrective Lenses.Nrc Form 369,encl. Without Encl1999-03-29029 March 1999 Requests That License OP-11037,for Bs Brooks,Be re-issued Without Restriction for Corrective Lenses.Nrc Form 369,encl. Without Encl JAFP-99-0097, Forwards JAFNPP Referenced Simulation Facility Four Year Performance Testing Rept, Containing Description of Performance Testing Completed During Past Four Years & Description of Testing Scheduled During Next Four Years1999-03-17017 March 1999 Forwards JAFNPP Referenced Simulation Facility Four Year Performance Testing Rept, Containing Description of Performance Testing Completed During Past Four Years & Description of Testing Scheduled During Next Four Years ML20204B6241999-03-17017 March 1999 Forwards Plant Referenced Simulation Facility Four Year Performance Testing Rept, Per 10CFR55.45(b)ii ML20204C7371999-03-15015 March 1999 Forwards Revised EP Coversheets for Sections to Vol 1 & Rev 26,Vol 3 to EPIP SAP-10, Meteorological Monitoring Sys Surveillance JAFP-99-0085, Submits in-vessel Visual Insp Summary Rept for RFO 13 for Ja FitzPatrick Nuclear Power Plant.All Relevant Indications Recorded During Insp Were Satisfactorily Dispositioned IAW Util Internal C/A Tracking Sys & Were Found Acceptable1999-03-0808 March 1999 Submits in-vessel Visual Insp Summary Rept for RFO 13 for Ja FitzPatrick Nuclear Power Plant.All Relevant Indications Recorded During Insp Were Satisfactorily Dispositioned IAW Util Internal C/A Tracking Sys & Were Found Acceptable ML20207J3201999-03-0505 March 1999 Forwards Form NRC-369,requesting That Restriction for Corrective Lenses Be Placed on Current License SOP-10089-3, for Ks Allen.Encl Withheld Per 10CFR2.790(a)(6).Without Encl JAFP-99-0073, Submits Annual Rept on SRV Challenges & Failures,Per Plant TS 6.9.A.2.b.No Challenges to SRVs from Automatic Control Circuits or from RCS Pressure Transients,Occurred.Ltr Contains No New Commitments1999-02-26026 February 1999 Submits Annual Rept on SRV Challenges & Failures,Per Plant TS 6.9.A.2.b.No Challenges to SRVs from Automatic Control Circuits or from RCS Pressure Transients,Occurred.Ltr Contains No New Commitments JAFP-99-0071, Forwards Semi-Annual Radioactive Effluent Release Rept for Period of 980701-1231. Format Used for Effluent Data Is Outlined in App B of Reg Guide 1.21,Rev 1.Distribution Is IAW Reg Guide 10.1,Rev 41999-02-25025 February 1999 Forwards Semi-Annual Radioactive Effluent Release Rept for Period of 980701-1231. Format Used for Effluent Data Is Outlined in App B of Reg Guide 1.21,Rev 1.Distribution Is IAW Reg Guide 10.1,Rev 4 JAFP-99-0068, Forwards Form NRC-5 Equivalent Records of All Individuals Monitored at JAFNPP from 980101-1231 on Electronic Media, Per 10CFR20.2206(b) & App a of NRC Reg Guide 8.7, Instruction for Recording & Reporting..1999-02-22022 February 1999 Forwards Form NRC-5 Equivalent Records of All Individuals Monitored at JAFNPP from 980101-1231 on Electronic Media, Per 10CFR20.2206(b) & App a of NRC Reg Guide 8.7, Instruction for Recording & Reporting.. JAFP-99-0019, Informs of Licensee Intent to Upgrade ERDS at Ja FitzPatrick in Preparation for Year 2000 (Y2K) Readiness,Per GL 98-01. Encl Contains Brief Summary of Proposed Changes to ERDS1999-01-25025 January 1999 Informs of Licensee Intent to Upgrade ERDS at Ja FitzPatrick in Preparation for Year 2000 (Y2K) Readiness,Per GL 98-01. Encl Contains Brief Summary of Proposed Changes to ERDS JAFP-99-0012, Documents Util Position Re Methodology for LPRM Calibr During Reactor Operation Using Traversing In-core Probe Sys1999-01-18018 January 1999 Documents Util Position Re Methodology for LPRM Calibr During Reactor Operation Using Traversing In-core Probe Sys JPN-99-002, Forwards Application for Amend to License DPR-59,removing Local Power Range Monitor (LPRM) Signal Calibr Method from TS Table 4.1-21999-01-15015 January 1999 Forwards Application for Amend to License DPR-59,removing Local Power Range Monitor (LPRM) Signal Calibr Method from TS Table 4.1-2 1999-09-08 Category:UTILITY TO NRC MONTHYEARJPN-90-063, Responds to NRC Re Deviations Noted in Insp Rept 50-333/90-19.Interim Corrective Action:Temporary Procedure Change Implemented to Administratively Prohibit Concurrent Closure of Upstream Feeder Breakers Until Issue Resolved1990-09-18018 September 1990
[Table view]Responds to NRC Re Deviations Noted in Insp Rept 50-333/90-19.Interim Corrective Action:Temporary Procedure Change Implemented to Administratively Prohibit Concurrent Closure of Upstream Feeder Breakers Until Issue Resolved JPN-90-061, Forwards Analyses Re Installation of Hardened Wetwell Vent, Including Benefits of Elevated Vs Ground Level Gas Release. Analyses Provide Further Evidence That Addition of Elevated Release to Existing Hardened Vent Not Cost Beneficial1990-09-0707 September 1990 Forwards Analyses Re Installation of Hardened Wetwell Vent, Including Benefits of Elevated Vs Ground Level Gas Release. Analyses Provide Further Evidence That Addition of Elevated Release to Existing Hardened Vent Not Cost Beneficial JPN-90-060, Forwards Info to Satisfy 900716 Commitment Re Switchgear Deficiency,Per SSFI Insp Rept 50-333/89-80.Waiver Requested Re Design Requirements for Three Phase Bolted Fault Criteria for Switchgear Configuration for Diesel Generator Testing1990-09-0404 September 1990 Forwards Info to Satisfy 900716 Commitment Re Switchgear Deficiency,Per SSFI Insp Rept 50-333/89-80.Waiver Requested Re Design Requirements for Three Phase Bolted Fault Criteria for Switchgear Configuration for Diesel Generator Testing JPN-90-057, Forwards GE Supplemental Rept of Ultrasonic Indications in Top Head Weld VC-TH-1-2 at Ja Fitzpatrick Power Station1990-08-14014 August 1990 Forwards GE Supplemental Rept of Ultrasonic Indications in Top Head Weld VC-TH-1-2 at Ja Fitzpatrick Power Station JAFP-90-0581, Forwards Proposed Rev 6 to IAP-2, Classification of Emergency Conditions, Per Insp Rept 50-333/90-15,Unresolved Item 89-11-03.Rev Incorporates Changes Assuring That Applicable Initiating Conditions,Per NUREG-0654,addressed1990-07-30030 July 1990 Forwards Proposed Rev 6 to IAP-2, Classification of Emergency Conditions, Per Insp Rept 50-333/90-15,Unresolved Item 89-11-03.Rev Incorporates Changes Assuring That Applicable Initiating Conditions,Per NUREG-0654,addressed JPN-90-055, Forwards Comments on Installation of Hardened Wetwell Vent at Plant,Per 891027 Response to Generic Ltr 89-16.Concludes That Hardened Vent Not Cost Beneficial & Consideration of Mods Be Deferred Until Individual Plant Evaluation Complete1990-07-25025 July 1990 Forwards Comments on Installation of Hardened Wetwell Vent at Plant,Per 891027 Response to Generic Ltr 89-16.Concludes That Hardened Vent Not Cost Beneficial & Consideration of Mods Be Deferred Until Individual Plant Evaluation Complete 05000333/LER-1989-012, Advises That Suppl to LER 89-012-00 Re Postulated Fault 4 Kv Bus Fault Will Be Submitted by 9009041990-07-16016 July 1990 Advises That Suppl to LER 89-012-00 Re Postulated Fault 4 Kv Bus Fault Will Be Submitted by 900904 JAFP-90-0517, Responds to NRC Re Violations Noted in Insp Rept 50-333/90-17.Corrective Action:Suspended Surveillances Reinstated on 9005071990-07-0606 July 1990 Responds to NRC Re Violations Noted in Insp Rept 50-333/90-17.Corrective Action:Suspended Surveillances Reinstated on 900507 JPN-90-049, Forwards Application for Amend to License DPR-59,making Temporary Change Re LPCI Pump Flow Permanent,Per . Change Reduced Surveillance Test Flow Acceptance Value for RHR Pump1990-06-21021 June 1990 Forwards Application for Amend to License DPR-59,making Temporary Change Re LPCI Pump Flow Permanent,Per . Change Reduced Surveillance Test Flow Acceptance Value for RHR Pump JAFP-90-0468, Informs That Licensed Operator Requalification Training Program at Plant Completed Transition to Program Based on Sys Approach to Training as Ref to in 10CFR55.4 & 591990-06-14014 June 1990 Informs That Licensed Operator Requalification Training Program at Plant Completed Transition to Program Based on Sys Approach to Training as Ref to in 10CFR55.4 & 59 JPN-90-048, Forwards Application for Amend to License DPR-59,revising Tech Specs to Reflect Containment Isolation Valves in RHR & Core Spray keep-full Sys1990-06-12012 June 1990 Forwards Application for Amend to License DPR-59,revising Tech Specs to Reflect Containment Isolation Valves in RHR & Core Spray keep-full Sys JPN-90-046, Forwards Application for Amend to License DPR-59 Re Performance Discharge Testing of 125-volt Dc Batteries & LPCI Motor Operated Valve Independent Power Supplies1990-06-11011 June 1990 Forwards Application for Amend to License DPR-59 Re Performance Discharge Testing of 125-volt Dc Batteries & LPCI Motor Operated Valve Independent Power Supplies JPN-90-045, Forwards Reload 9/Cycle 10 Core Operating Limits Rept1990-06-11011 June 1990 Forwards Reload 9/Cycle 10 Core Operating Limits Rept JAFP-90-0456, Responds to Notice of Violation & Proposed Imposition of Civil Penalties in Amount of $75,000 Re Radiation Exposure. Corrective Actions:Worker Decontaminated & Examined by Physician.Civil Penalty Fee Transferred Electronically1990-06-11011 June 1990 Responds to Notice of Violation & Proposed Imposition of Civil Penalties in Amount of $75,000 Re Radiation Exposure. Corrective Actions:Worker Decontaminated & Examined by Physician.Civil Penalty Fee Transferred Electronically JPN-90-047, Forwards GE Nonproprietary Rept, GE11 Lead Test Assembly Fo Ja Fitzpatrick Nuclear Power Plant Reload 9 Cycle 10 & Proprietary Rept GE11 Lead Test Assembly Fuel Bundle.... Proprietary Rept Withheld (Ref 10CFR2.790)1990-06-11011 June 1990 Forwards GE Nonproprietary Rept, GE11 Lead Test Assembly Fo Ja Fitzpatrick Nuclear Power Plant Reload 9 Cycle 10 & Proprietary Rept GE11 Lead Test Assembly Fuel Bundle.... Proprietary Rept Withheld (Ref 10CFR2.790) JAFP-90-0455, Responds to NRC Re Violations Noted in Insp Rept 50-333/90-02.Corrective Actions:Refuel Floor Work Stopped, Chief Radiation Protection Technician Disciplined & Importance of Following Procedural Guidelines Reinforced1990-06-0808 June 1990 Responds to NRC Re Violations Noted in Insp Rept 50-333/90-02.Corrective Actions:Refuel Floor Work Stopped, Chief Radiation Protection Technician Disciplined & Importance of Following Procedural Guidelines Reinforced ML20043H0451990-06-0808 June 1990 Responds to NRC 900509 Ltr Re Violations Noted in Insp Rept 50-333/90-02.Corrective Actions:Refuel Floor Work Stopped, Chief Radiation Protection Technician Disciplined & Importance of Following Procedural Guidelines Reinforced JPN-90-044, Forwards IGSCC Insp 1990 Refueling Outage Summary Rept Addendum1990-06-0707 June 1990 Forwards IGSCC Insp 1990 Refueling Outage Summary Rept Addendum JPN-90-043, Forwards Application for Amend to License DPR-59,revising Tech Spec 5.5.B to Increase Number of Spent Fuel Assemblies That Can Be Stored in Spent Fuel Pool1990-05-31031 May 1990 Forwards Application for Amend to License DPR-59,revising Tech Spec 5.5.B to Increase Number of Spent Fuel Assemblies That Can Be Stored in Spent Fuel Pool JPN-90-042, Forwards Application for Amend to License DPR-59,updating Tech Spec Tables 3.2-8 & 4.2-8 to Reflect Installation of post-accident Monitoring Instrumentation,Per Reg Guide 1.97 & Deleting Tables 3.2-6,4.2-6 & 4.7-11990-05-30030 May 1990 Forwards Application for Amend to License DPR-59,updating Tech Spec Tables 3.2-8 & 4.2-8 to Reflect Installation of post-accident Monitoring Instrumentation,Per Reg Guide 1.97 & Deleting Tables 3.2-6,4.2-6 & 4.7-1 JPN-90-040, Forwards Structural Evaluation of Indications in Reactor Top Head at Ja Fitzpatrick Power Station, Based on Evaluation Analyses for Flaw Indications Identified During Routine Inservice Insps1990-05-25025 May 1990 Forwards Structural Evaluation of Indications in Reactor Top Head at Ja Fitzpatrick Power Station, Based on Evaluation Analyses for Flaw Indications Identified During Routine Inservice Insps JPN-90-038, Responds to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow. Channel Boxes Not Reused After First Lifetime.Methodology Developed by Ge,Vendor for Plant, Used to Account for Channel Bow1990-05-16016 May 1990 Responds to NRC Bulletin 90-002, Loss of Thermal Margin Caused by Channel Box Bow. Channel Boxes Not Reused After First Lifetime.Methodology Developed by Ge,Vendor for Plant, Used to Account for Channel Bow JAFP-90-0414, Responds to NRC Re Violations Noted in Insp Rept 50-333/90-01.Corrective Actions:Disciplinary Actions Taken & Job Performance Counseling Provided Re Responsibilites for Control Room Operations & Command in Control Room1990-05-14014 May 1990 Responds to NRC Re Violations Noted in Insp Rept 50-333/90-01.Corrective Actions:Disciplinary Actions Taken & Job Performance Counseling Provided Re Responsibilites for Control Room Operations & Command in Control Room JAFP-90-0415, Responds to NRC Re Violations Noted in Insp Rept 50-333/90-13.Util Requests That Notice of Violation Be Withdrawn & Reclassified as Deviation & That Submittal of Inaccurate Info Be Considered Isolated Case1990-05-14014 May 1990 Responds to NRC Re Violations Noted in Insp Rept 50-333/90-13.Util Requests That Notice of Violation Be Withdrawn & Reclassified as Deviation & That Submittal of Inaccurate Info Be Considered Isolated Case ML20043B1021990-05-14014 May 1990 Responds to NRC 900412 Ltr Re Violations Noted in Insp Rept 50-333/90-01.Corrective Actions:Disciplinary Actions Taken & Job Performance Counseling Provided Re Responsibilites for Control Room Operations & Command in Control Room JAFP-90-0396, Responds to NRC Re Violations Noted in Insp Rept 50-333/90-11.Corrective Actions:Mod Error Corrected,New Transmitters Installed & Mod Procedures to Be Revised to Assign Responsibility for Calibr Points Value Calculation1990-05-0909 May 1990 Responds to NRC Re Violations Noted in Insp Rept 50-333/90-11.Corrective Actions:Mod Error Corrected,New Transmitters Installed & Mod Procedures to Be Revised to Assign Responsibility for Calibr Points Value Calculation JPN-90-036, Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, Safety Implication of Control Sys in LWR Nuclear Power Plants1990-04-30030 April 1990 Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, Safety Implication of Control Sys in LWR Nuclear Power Plants JPN-90-033, Forwards Addl Info Re ATWS Rule Concerning Alternate Rod Insertion & Recirculation Pump Trip,Including Description of Sys Mods1990-04-23023 April 1990 Forwards Addl Info Re ATWS Rule Concerning Alternate Rod Insertion & Recirculation Pump Trip,Including Description of Sys Mods JPN-90-034, Forwards Development of Inconel Weld Overlay Repair for Carbon Steel to Stainless Steel Weld Joints1990-04-20020 April 1990 Forwards Development of Inconel Weld Overlay Repair for Carbon Steel to Stainless Steel Weld Joints JPN-90-032, Forwards Application for Amend to License DPR-59,changing Tech Specs to Remove cycle-specific Parameter Limits & Ref Core Operating Limits Rept Which Contains Limits,Per Generic Ltr 88-161990-04-20020 April 1990 Forwards Application for Amend to License DPR-59,changing Tech Specs to Remove cycle-specific Parameter Limits & Ref Core Operating Limits Rept Which Contains Limits,Per Generic Ltr 88-16 JPN-90-030, Forwards Temporary Addendum Rept for Rev 1 to Security Plan. Rept Withheld (Ref 10CFR73.21 & 2.790(d)(1))1990-04-0505 April 1990 Forwards Temporary Addendum Rept for Rev 1 to Security Plan. Rept Withheld (Ref 10CFR73.21 & 2.790(d)(1)) JPN-90-031, Forwards Rev 12 to Security Plan.Rev Withheld (Ref 10CFR73.21 & 2.790(d)(1))1990-04-0505 April 1990 Forwards Rev 12 to Security Plan.Rev Withheld (Ref 10CFR73.21 & 2.790(d)(1)) JPN-90-028, Forwards Application for Amend to License DPR-59,revising Sections 3.5.F & 4.5.F of Tech Specs, Min ECCS Availability1990-04-0202 April 1990 Forwards Application for Amend to License DPR-59,revising Sections 3.5.F & 4.5.F of Tech Specs, Min ECCS Availability JPN-90-023, Forwards Application for Amend to License DPR-59,changing Tech Spec Section 4.9.F, LPCI Motor-Operated Valve Independent Power Supplies, on Page 222a.Changes Purely Editorial in Nature & Revises Surveillance Requirement1990-03-13013 March 1990 Forwards Application for Amend to License DPR-59,changing Tech Spec Section 4.9.F, LPCI Motor-Operated Valve Independent Power Supplies, on Page 222a.Changes Purely Editorial in Nature & Revises Surveillance Requirement ML20012C0441990-03-0909 March 1990 Forwards Application for Amend to License DPR-59,clarifying Spec 3.9.B.3 Re Diesel Generator Operability to Eliminate Erroneous Ref to Both Diesel Generator Sys JPN-90-022, Forwards Application for Amend to License DPR-59,clarifying Spec 3.9.B.3 Re Diesel Generator Operability to Eliminate Erroneous Ref to Both Diesel Generator Sys1990-03-0909 March 1990 Forwards Application for Amend to License DPR-59,clarifying Spec 3.9.B.3 Re Diesel Generator Operability to Eliminate Erroneous Ref to Both Diesel Generator Sys ML20012A1021990-03-0101 March 1990 Forwards Inservice Insp Hydrostatic Test Program for Class 2 & 3 Sys Conducted During First 10-Yr Insp Interval. Relief Requested for Second 10-yr Insp Interval for Hydrostatic Relief Requests Contained in Encl JPN-90-021, Forwards Inservice Insp Hydrostatic Test Program for Class 2 & 3 Sys Conducted During First 10-Yr Insp Interval. Relief Requested for Second 10-yr Insp Interval for Hydrostatic Relief Requests Contained in Encl1990-03-0101 March 1990 Forwards Inservice Insp Hydrostatic Test Program for Class 2 & 3 Sys Conducted During First 10-Yr Insp Interval. Relief Requested for Second 10-yr Insp Interval for Hydrostatic Relief Requests Contained in Encl JAFP-90-0183, Forwards New York Power Authority Ja Fitzpatrick Nuclear Power Plant Effluent & Waste Disposal Semiannual Rept Jul-Dec 1989 & Rev 7 to Odcm1990-02-28028 February 1990 Forwards New York Power Authority Ja Fitzpatrick Nuclear Power Plant Effluent & Waste Disposal Semiannual Rept Jul-Dec 1989 & Rev 7 to Odcm ML20012A0201990-02-28028 February 1990 Forwards Response to NRC SALP Initial Rept 50-333/88-99 for May 1988 - Sept 1989.Emergency Operating Procedures Being Upgraded to Rev 4 of Emergency Procedures Guidelines & Will Be in Place Upon Startup from Spring Refueling Outage JPN-90-016, Requests That 900209 Application for Amend to License DPR-59 Be Processed on Emergency Basis & Approved by 900225 to Avoid Premature Plant Shutdown1990-02-21021 February 1990 Requests That 900209 Application for Amend to License DPR-59 Be Processed on Emergency Basis & Approved by 900225 to Avoid Premature Plant Shutdown JPN-90-015, Forwards Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Testing of Circulating Water/Svc Water Sys for Mussels Will Begin Spring 19901990-02-13013 February 1990 Forwards Response to Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment. Testing of Circulating Water/Svc Water Sys for Mussels Will Begin Spring 1990 JPN-90-013, Forwards Application for Amend to License DPR-59,revising Tech Specs Re RHR Pump Operability1990-02-0909 February 1990 Forwards Application for Amend to License DPR-59,revising Tech Specs Re RHR Pump Operability JPN-90-014, Notifies Second 10-yr Inservice Insp Interval Scheduled to End in Jul 1995 & Valve Insp During 1990,91 & 93 Refueling Outages1990-02-0808 February 1990 Notifies Second 10-yr Inservice Insp Interval Scheduled to End in Jul 1995 & Valve Insp During 1990,91 & 93 Refueling Outages JPN-90-012, Forwards Preoutage IGSCC Insp Plan for Upcoming 1990 Refueling Outage.Util Will Not Routinely Submit Preoutage Plans in Future Per Generic Ltr 88-01 & NUREG-03131990-01-29029 January 1990 Forwards Preoutage IGSCC Insp Plan for Upcoming 1990 Refueling Outage.Util Will Not Routinely Submit Preoutage Plans in Future Per Generic Ltr 88-01 & NUREG-0313 ML20006C3811990-01-29029 January 1990 Forwards Preoutage IGSCC Insp Plan for Upcoming 1990 Refueling Outage.Util Will Not Routinely Submit Preoutage Plans in Future Per Generic Ltr 88-01 & NUREG-0313 JAFP-90-0095, Responds to NRC Re Violations Noted in Insp Rept 50-333/89-21.Corrective Action:Background Instrumentation Results Will Be Reviewed on Periodic Basis1990-01-29029 January 1990 Responds to NRC Re Violations Noted in Insp Rept 50-333/89-21.Corrective Action:Background Instrumentation Results Will Be Reviewed on Periodic Basis JAFP-90-0066, Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor Darling Model S350W Swing-Check Valves or Valves of Similar Design. No Insp of Valves Performed1990-01-19019 January 1990 Responds to NRC Bulletin 89-002, Stress Corrosion Cracking of High Hardness Type 410 Stainless Steel Internal Preloaded Bolting in Anchor Darling Model S350W Swing-Check Valves or Valves of Similar Design. No Insp of Valves Performed JPN-90-009, Forwards Application for Amend to License DPR-59,revising Tech Specs Re Augmented Inservice Insp of Main Steam & Feedwater Piping Welds.Spec 4.6.F.2, Structural Integrity & Associated Bases on Pages 144 & 153 Deleted1990-01-16016 January 1990 Forwards Application for Amend to License DPR-59,revising Tech Specs Re Augmented Inservice Insp of Main Steam & Feedwater Piping Welds.Spec 4.6.F.2, Structural Integrity & Associated Bases on Pages 144 & 153 Deleted JPN-90-011, Forwards Application for Amend to License DPR-59,revising Tech Spec 4.11.B.2, Crescent Area Ventilation to Require Calibr of Existing Temp Indicator Controllers or New Temp Control Switches1990-01-16016 January 1990 Forwards Application for Amend to License DPR-59,revising Tech Spec 4.11.B.2, Crescent Area Ventilation to Require Calibr of Existing Temp Indicator Controllers or New Temp Control Switches 1990-09-07 |
Event date: | |
---|---|
Report date: | |
3331981021R00 - NRC Website | |
text
r POWER AUTHORITY OF THE STATE OF NEW YORK J AMES A. FsT2 patrick N UCLE A R power PLANT P.o. Box 41 RAYMOND J. PASTERNAX Lycomeng, New York 13093 ResWent Meneger 31s-342-3840
, s ( L[f ru March 19, 1981 SERIAL:
JAFP-81-0263 D'
V
{w p
a
@ W(W'.'Y ##
cy,y r_b' Mr. Boyce H. Grier geV f,f#
.,f United States Nuclear Regulatory Commission N
F s
Region 1 b
A'M, '
631 Park Avenue King of Prussia, Pennsylvania 19406 col }Tl) ) '
Reference:
Docket No. 50-333 Licensee Event Report: 81-021/03L-0
Dear Mr. Grier:
We have enclosed the referenced Licensee Event Report in accordance with Section 6.0 of Technical Specifications and USNRC Regulatory Guide 1.16.
If there are any questions concerning this report, please contact Mr. W. Verne Chlids at 3i5-342-3840, Extension 207 Very truly yours,
-[
?.
V
/, ',
/
.,/
RJP:VC:jjh Raymond J. Pasternak Enclosure Resident Manager CC: USNRC Director, Office of Inspection & Enforcement (30 copies)
USNRC Director, Office of Management Information & Program Control (3 copies)
Assistant Director of Operating Reactors, USNRC Directorate of Licensing (1)
Nuclear Safety Analysis Center, Palo Alto, California (1)
Internal Power Authority Distribution NRC Resident inspector Document Control Center