| | | Reporting criterion |
|---|
| 05000333/LER-1997-001, :on 970123,manual Reactor Scram Occurred Due to Fouling of Circulating Water Sys Traveling Screens.Caused by Potential Loss of CWS Intake Water Due to Restriction of Flow Through Three CWS Traveling Screens.Procedures Revised |
- on 970123,manual Reactor Scram Occurred Due to Fouling of Circulating Water Sys Traveling Screens.Caused by Potential Loss of CWS Intake Water Due to Restriction of Flow Through Three CWS Traveling Screens.Procedures Revised
| |
| 05000333/LER-1997-002, :on 970124,shutdown Cooling Isolation Occurred. Caused by Pressure Transient.Placed Shutdown Cooling in Service After Resetting Isolation Logic & Refilling & Venting Sys |
- on 970124,shutdown Cooling Isolation Occurred. Caused by Pressure Transient.Placed Shutdown Cooling in Service After Resetting Isolation Logic & Refilling & Venting Sys
| 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2) |
| 05000333/LER-1997-003, :on 970213,identified Potential Overpressurization of Containment Penetrations Due to Thermal Expansion.Caused by Original Plant Design.Completed Operability Determinations IAW GL 91-18 |
- on 970213,identified Potential Overpressurization of Containment Penetrations Due to Thermal Expansion.Caused by Original Plant Design.Completed Operability Determinations IAW GL 91-18
| 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2) |
| 05000333/LER-1997-004-01, :on 970428,safety Relief Valve Failed to Open During Setpoint Verification Testing.Caused by Presence of Small Screw.Revised Target-Rock 2-Stage SRV Assembly Test Procedures,Reported Per 10CFR21 |
- on 970428,safety Relief Valve Failed to Open During Setpoint Verification Testing.Caused by Presence of Small Screw.Revised Target-Rock 2-Stage SRV Assembly Test Procedures,Reported Per 10CFR21
| |
| 05000333/LER-1997-005, :on 970525,manual Reactor Scram Occurred Due to Failure of Number 3 Main Tcv.Caused by Damaged Valve Spring Can Coupling.Replaced Valve Spring Can Coupling Bolt of Four TCVs & Four CIVs & Completed Review |
- on 970525,manual Reactor Scram Occurred Due to Failure of Number 3 Main Tcv.Caused by Damaged Valve Spring Can Coupling.Replaced Valve Spring Can Coupling Bolt of Four TCVs & Four CIVs & Completed Review
| 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2) |
| 05000333/LER-1997-006-01, :on 970616,discovered That Instrumentation Isolation Trip Function Surveillance Test Had Not Been Performed at Required Frequency.Caused by Personnel Error. Completed Surveillance Test |
- on 970616,discovered That Instrumentation Isolation Trip Function Surveillance Test Had Not Been Performed at Required Frequency.Caused by Personnel Error. Completed Surveillance Test
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(1) |
| 05000333/LER-1997-008, Forwards LER 97-008-00 Re Inoperability of Both Trains of SGTS Due to Flow Restriction in Discharge Line | Forwards LER 97-008-00 Re Inoperability of Both Trains of SGTS Due to Flow Restriction in Discharge Line | 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability |
| 05000333/LER-1997-008-01, :on 970806,both Trains of SGTS Were Declared Inoperable Due to Flow Restriction in Discharge Line. Developed Periodic Surveillance That Can Adequately Detect Blockage in Drain Line |
- on 970806,both Trains of SGTS Were Declared Inoperable Due to Flow Restriction in Discharge Line. Developed Periodic Surveillance That Can Adequately Detect Blockage in Drain Line
| |
| 05000333/LER-1997-009-01, :on 970905,discovered Radwaste Bldg Exhaust Monitor Instrument Channel Calibr Test,Required Ts.Caused by Personnel Error.Comprehensive Root Cause Analysis Completed to Review & Identified Human Performance Considerations |
- on 970905,discovered Radwaste Bldg Exhaust Monitor Instrument Channel Calibr Test,Required Ts.Caused by Personnel Error.Comprehensive Root Cause Analysis Completed to Review & Identified Human Performance Considerations
| 10 CFR 50.73(a)(2)(1) |
| 05000333/LER-1997-009, Forwards LER 97-009-00 Re Exceeded Quarterly Calibr Frequency for Radwaste Bldg Exhaust Radiation Monitor.No Commitments Contained in Rept | Forwards LER 97-009-00 Re Exceeded Quarterly Calibr Frequency for Radwaste Bldg Exhaust Radiation Monitor.No Commitments Contained in Rept | |
| 05000333/LER-1997-010-01, :on 971021,determined That Surveillance Testing of Primary Containment Pressure Chamber,Drywell Vacuum Breakers Coincident W/Loca.Caused by Inadequate Procedures Reviews.Procedures Revised |
- on 971021,determined That Surveillance Testing of Primary Containment Pressure Chamber,Drywell Vacuum Breakers Coincident W/Loca.Caused by Inadequate Procedures Reviews.Procedures Revised
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded |
| 05000333/LER-1997-010, Forwards LER 97-010-00 Re Surveillance Testing of Pressure Suppression Chamber.No Commitments Contained in Rept | Forwards LER 97-010-00 Re Surveillance Testing of Pressure Suppression Chamber.No Commitments Contained in Rept | 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded |
| 05000333/LER-1997-011, Forwards LER 97-011-00 Re Invalid ESF Actuation & Failure to Perform TS Required Acltions While Performing Troubleshooting Activities | Forwards LER 97-011-00 Re Invalid ESF Actuation & Failure to Perform TS Required Acltions While Performing Troubleshooting Activities | 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
| 05000333/LER-1997-011-01, :on 971024,invalid ESF Actuation & Failure to Perform TS Required Actions Occurred While Performing Required Actions While Troubleshooting Activities.Restored HPCI Sys to Normal IAW Plant Procedures |
- on 971024,invalid ESF Actuation & Failure to Perform TS Required Actions Occurred While Performing Required Actions While Troubleshooting Activities.Restored HPCI Sys to Normal IAW Plant Procedures
| 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(1) |
| 05000333/LER-1997-012-01, :on 971214,drywell Personnel Airlock Outer Door Seals Local Leak Rate Test Was Not Properly Performed.Caused by Inattention to Detail on Part of Mechanic Who Installed Label.Removed Incorrect Label |
- on 971214,drywell Personnel Airlock Outer Door Seals Local Leak Rate Test Was Not Properly Performed.Caused by Inattention to Detail on Part of Mechanic Who Installed Label.Removed Incorrect Label
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) |
| 05000333/LER-1997-012, :on 971214,drywall Personnel Airlock Outer Door Seals Local Leak Rate Test Was Not Properly Performed.Caused by Mechanic Installing Incorrect Label.Removed Incorrect Label & Installing Correct Label |
- on 971214,drywall Personnel Airlock Outer Door Seals Local Leak Rate Test Was Not Properly Performed.Caused by Mechanic Installing Incorrect Label.Removed Incorrect Label & Installing Correct Label
| 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2) |
| 05000333/LER-1997-013, Forwards LER 97-013-00 Re High Pressure Coolant Injection Sys Which Was Declared Inoperable Due to Instrument Malfunction During Surveillance Testing.No Commitments Made | Forwards LER 97-013-00 Re High Pressure Coolant Injection Sys Which Was Declared Inoperable Due to Instrument Malfunction During Surveillance Testing.No Commitments Made | 10 CFR 50.73(a)(2) |
| 05000333/LER-1997-013-01, :on 971216,high Pressure Coolant Sys Was Declared Inoperable.Caused by Instrument Malfunction During Surveillance Testing.Completed Repair Activities to Correct Adjustments to Master Trip Unit |
- on 971216,high Pressure Coolant Sys Was Declared Inoperable.Caused by Instrument Malfunction During Surveillance Testing.Completed Repair Activities to Correct Adjustments to Master Trip Unit
| 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2) |