' " *"' 8 8" PACILITV NARIS (H OOCati feutADER (2)
PAGE(3 JARIES A.FITZPATRICK NUCLEAR POWER PLANT o 15101010131313 1 loFl 011 TITLE 448 I
HPCI STEAM SUPPLY VALVE INOPERATIVE EvtNT DATS(el Lem NUnastR gel REPORT DATE 17)
OTHER PACILITitt INVOLVtO (S)
MONTH DAY YEAR YEAR
- - II,0,
'"b MONTM DAY vtAR P ACILITV NAMES 00CKET NUwSERist 0l6l0l0log l l 0l1 0l4
'E 58l5 0l 0l1 0l0 0l1 il5 8l 5 o isio 3 0r oi l
~
" ' ' * " * " ' " ' ' " " * " * " ' ' ' " ' " ' " ' ' " ' " ' " ' ' ' ' ' * ' " * ' ' ' " * * * * ' ~ * ' * ' " * * ' " * ~ ~ ' ' " "
oneRAfiNo N
MODE m K
20 405(el K734sH3Havl 73.71M R
K 400(eH1H4 08.38(eHM g
30.78teH2Het 73.711el n.,
1i0, O Monum K=.I.
KnuH H I s
K 40BisH1HND 00.734sH2Hal K734eH2HumHA) g, ER,g,7,gg7;,,
30 405(eH1HWI to 73EaH2HG JefAf OO.734sH2Hve41HO)
K40SieH1Hel K734aH2Hal K73teH3Het LICENGEE Cose?ACT POR TMit LtR 1121 NAME TELEPHONE NUMSER ARE A C004 ROBERT T. LISEN0, MAINTENANCE SUPERINTENDENT 3 4 2 -l3l8 410 3l115 1 1 i 1
COMPLEf t ONE LING POR I ACH COMPONENT PAltunt OttCRisto 1N TMit REPORT 1933 Mjyyg4
"%#,'((
CAust sysitM COMPONENT
"$y%$C, Ag jf m OR CAUS$
Sv8 TEM COMPONENT
~
BJ 7; 4i i i 0, 8,2 Y
X i
G i
, i i l l a
l l I l l l l l
l I I l I i SUPPttMENTAL REPORT EXPECTto 114 MONTM OAV VfAR SUOMiS$ ION Ytt (19 yee, eenwn. GMPLCTRO SUOn0!S$lON CA tti NO l
l l
AseTRACT,u= M r.oe 4..
A,..-,
.a m
, n ei While operating at full power the llPCI steam supply isolation valve breaker alarm relay failed.
Repair necessitated both the closing of the llPCI steam supply isolation valve and de-energizing the supply breaker for a period of 2-1/2 hours. This resulted in the llPCI system being declared inoperative and surveillance on redundant systems performed per Technical Specifications Section 3.5.C and 4.5.C.
The DC coil on the alarm relay failed. The failure of the alarm relay did not prevent automatic operation of the valve but repairs required de-energizing the breaker.
Since the redundant ADS system and RCIC were available this event did not represent a serious degradation of the public's health and safety.
8502070100 050125 PDR ADOCK 05000333 9
PM I E 23,
.?>l** *"
f/
A e'
James A. F6t; Pat,lck ruclear Power Plant PO. Box 41 Lycoming, New York 13093 315 342 3840 Harold A.Glovier
- > NewYorkPbwer
& Authority January 25, 1985 JAFP-85-0078 United States Regulatory Cmmission Document Control Desk Washington, DC 20555
REFERENCE:
DOCKET No. 50-333 LICENSEE EVENT REPORT: 85-001-00
Dear Sir:
We have enclosed the referenced Licensee Event Report in accordance with 10CFR50.73.
If there are any questions concerning this report, please contact tir.
Robert Liseno at 315-342-3840, extension 220.
Very truly yours, f.
cs.<a.u a DLD A. GIDVIER HAG:R nan CC: USNRC, Region I (1)
INFO Records Center, Atlanta, Ga. (1)
American Nuclear Insurers (1)
Internal Power Authority Distribution i
NRC Resident Inspector Docunent Control Center LER/0R File
@v~h
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000333/LER-1985-001, :on 850104,HPCI Steam Supply Isolation Valve Breaker Alarm Relay Failed.Necessary Repairs Resulted in HPCI Sys Being Declared Inoperable for 2 1/2 H.Caused by Faulty Dc Coil |
- on 850104,HPCI Steam Supply Isolation Valve Breaker Alarm Relay Failed.Necessary Repairs Resulted in HPCI Sys Being Declared Inoperable for 2 1/2 H.Caused by Faulty Dc Coil
| | | 05000333/LER-1985-002, :on 850117 & 18,shift Technical Advisor Position Unfulfilled.Qualified Individual Called in When Deficiency Noted.Caused by Personnel Error Due to Implementation of Worker Schedule Changes |
- on 850117 & 18,shift Technical Advisor Position Unfulfilled.Qualified Individual Called in When Deficiency Noted.Caused by Personnel Error Due to Implementation of Worker Schedule Changes
| | | 05000333/LER-1985-003, :on 850205,emergency Diesel Generators a & C & Emergency Svc Water Pump a Declared Inoperable When Pump Tripped During Startup for Routine Surveillance.On 850207, Pump Tripped on Overcurrent During Startup |
- on 850205,emergency Diesel Generators a & C & Emergency Svc Water Pump a Declared Inoperable When Pump Tripped During Startup for Routine Surveillance.On 850207, Pump Tripped on Overcurrent During Startup
| | | 05000333/LER-1985-004, :on 850212,one of Two Reactor Bldg Pressure Suppression Chamber Vacuum Breaker Valves Made Inoperable & Remained Inoperable in Excess of Tech Specs.Caused by Restriction by Scaffolding |
- on 850212,one of Two Reactor Bldg Pressure Suppression Chamber Vacuum Breaker Valves Made Inoperable & Remained Inoperable in Excess of Tech Specs.Caused by Restriction by Scaffolding
| | | 05000333/LER-1985-005, :on 850206,secondary Containment Integrity Breached During Full Power.Caused by Faulty Latch Mechanism on Outer Door.Mechanism Repaired |
- on 850206,secondary Containment Integrity Breached During Full Power.Caused by Faulty Latch Mechanism on Outer Door.Mechanism Repaired
| | | 05000333/LER-1985-006, :on 850215 Turbine Trip & Reactor Scam Occurred.Caused by Closed Instrument Root Valve for Pressure Transmitter.Mod to Unbalance Circuit,Providing Indication of Circuit Failure Planned |
- on 850215 Turbine Trip & Reactor Scam Occurred.Caused by Closed Instrument Root Valve for Pressure Transmitter.Mod to Unbalance Circuit,Providing Indication of Circuit Failure Planned
| | | 05000333/LER-1985-007, :on 850220,actuation of Reactor Protection Sys Occurred.Caused by Erroneous Low Level Signal Resulting from Protective Tagging Evolution to Remove Reactor Pressure Vessel Transmitter from Svc |
- on 850220,actuation of Reactor Protection Sys Occurred.Caused by Erroneous Low Level Signal Resulting from Protective Tagging Evolution to Remove Reactor Pressure Vessel Transmitter from Svc
| | | 05000333/LER-1985-008, :on 850301,during 1985 Refueling Outage,Five Penetrations Showed Leakage Possibly Exceeding 0.6La Limit in Tech Spec 4.7.A.2.b.2.Caused by Normal Wear.Valve Repairs &/Or Replacements Successfully Completed |
- on 850301,during 1985 Refueling Outage,Five Penetrations Showed Leakage Possibly Exceeding 0.6La Limit in Tech Spec 4.7.A.2.b.2.Caused by Normal Wear.Valve Repairs &/Or Replacements Successfully Completed
| | | 05000333/LER-1985-009, :on 850322,three Target Rock Safety/Relief Valves Had Setpoint Values Outside Allowable Tolerances. Possibly Caused by Inadequate Clearances in Laberinth Seal Area or Pilot Seat Leakage.Valves Overhauled |
- on 850322,three Target Rock Safety/Relief Valves Had Setpoint Values Outside Allowable Tolerances. Possibly Caused by Inadequate Clearances in Laberinth Seal Area or Pilot Seat Leakage.Valves Overhauled
| | | 05000333/LER-1985-010, :on 850421,during Refueling Outage,Fuel Assembly Inadvertently Lifted from Reactor Vessel W/Fuel Support Grapple When Visual Contact Grapple Lost.Caused by Operator Error.Operators Counseled |
- on 850421,during Refueling Outage,Fuel Assembly Inadvertently Lifted from Reactor Vessel W/Fuel Support Grapple When Visual Contact Grapple Lost.Caused by Operator Error.Operators Counseled
| | | 05000333/LER-1985-011, :on 850506,during Refueling Outage,Inoperable Snubbers Found as Result of Functional Testing.Lockup & Bleed Rates Outside Acceptable Range.Snubbers Overhauled. Remaining Snubbers Functionally Tested |
- on 850506,during Refueling Outage,Inoperable Snubbers Found as Result of Functional Testing.Lockup & Bleed Rates Outside Acceptable Range.Snubbers Overhauled. Remaining Snubbers Functionally Tested
| | | 05000333/LER-1985-012, :on 850503,during Scheduled Maint Outage,Two Reactor Scrams Occurred.Caused by Improperly Valved Instruments Resulting in False Low Level Signal & Backfilled Instrument Line,Respectively |
- on 850503,during Scheduled Maint Outage,Two Reactor Scrams Occurred.Caused by Improperly Valved Instruments Resulting in False Low Level Signal & Backfilled Instrument Line,Respectively
| | | 05000333/LER-1985-013, :on 850418,two Safety/Relief Valves Found Out of Tolerance During Testing.Possibly Caused by Inadequate Clearance in Labyrinth Seal Area & Pilot Seat Leakage.Pilot Overhauled to Current Procedure |
- on 850418,two Safety/Relief Valves Found Out of Tolerance During Testing.Possibly Caused by Inadequate Clearance in Labyrinth Seal Area & Pilot Seat Leakage.Pilot Overhauled to Current Procedure
| | | 05000333/LER-1985-014, :on 850511,while Performing Surveillance Test, Reactor High Pressure Switches 02 Ps 128A & 02 Ps 128B Found to Actuate Above Tech Spec Limits.Switches Recalibr & Surveillance Frequency Increased |
- on 850511,while Performing Surveillance Test, Reactor High Pressure Switches 02 Ps 128A & 02 Ps 128B Found to Actuate Above Tech Spec Limits.Switches Recalibr & Surveillance Frequency Increased
| | | 05000333/LER-1985-015, :on 850601,APRMs A,D,E & F Tripped Downscale After Placing Reactor Mode Switch on Run & Increasing Power.Aprms D&F Found Out of Tolerance High.Cause Not Stated.Setpoints Adjusted & Surveyed Weekly |
- on 850601,APRMs A,D,E & F Tripped Downscale After Placing Reactor Mode Switch on Run & Increasing Power.Aprms D&F Found Out of Tolerance High.Cause Not Stated.Setpoints Adjusted & Surveyed Weekly
| | | 05000333/LER-1985-016, :on 850524,reactor Scram Signal Initiated During Scheduled Refueling Outage.Caused by Personnel Error. Scram Reset & Personnel Counseled |
- on 850524,reactor Scram Signal Initiated During Scheduled Refueling Outage.Caused by Personnel Error. Scram Reset & Personnel Counseled
| | | 05000333/LER-1985-017, :on 850610,reactor Scram Occurred.Caused by MSIV Closure While in Run Mode Due to Improper Valve Lineup on Steam Flow Instrumentation.Scram Procedures Followed & Personnel Reinstructed |
- on 850610,reactor Scram Occurred.Caused by MSIV Closure While in Run Mode Due to Improper Valve Lineup on Steam Flow Instrumentation.Scram Procedures Followed & Personnel Reinstructed
| | | 05000333/LER-1985-018, :on 850624,reactor Scram Occurred Due to Recirculation Flow Transient.Caused by Faulty Input Diode in Demodulator Board.Amplifier & Demodulator Board Replaced |
- on 850624,reactor Scram Occurred Due to Recirculation Flow Transient.Caused by Faulty Input Diode in Demodulator Board.Amplifier & Demodulator Board Replaced
| | | 05000333/LER-1985-019, :on 850719,reactor Scram Occurred.Caused by Loss of Electrical Power to 4 Kv Buses 10300 & 10500 Due to Operator Error.Operators Retrained on Electrical Distribution Sys |
- on 850719,reactor Scram Occurred.Caused by Loss of Electrical Power to 4 Kv Buses 10300 & 10500 Due to Operator Error.Operators Retrained on Electrical Distribution Sys
| | | 05000333/LER-1985-020, :on 850725,HPCI Sys Inoperable Due to Steam Line Isolation on High Ambient Temp.Caused by Procedural Inadequacy in Failing to Secure Plant Ventilation Sys When Environ Conditions Near Design Limits |
- on 850725,HPCI Sys Inoperable Due to Steam Line Isolation on High Ambient Temp.Caused by Procedural Inadequacy in Failing to Secure Plant Ventilation Sys When Environ Conditions Near Design Limits
| | | 05000333/LER-1985-021, :on 850726 & 0809,two Reactor Scrams Occurred. Caused by Pressure Transients Due to Installation of Zero Leakage Shutoff Valves to Turbine Control Valve Control Sys.Orifices Installed |
- on 850726 & 0809,two Reactor Scrams Occurred. Caused by Pressure Transients Due to Installation of Zero Leakage Shutoff Valves to Turbine Control Valve Control Sys.Orifices Installed
| | | 05000333/LER-1985-022, :on 850820,during Main Steam Line High Radiation Functional Test,Msiv B Closed.Caused by Wiring Error in MSIV Solenoids.Solenoids Replaced & Rewired Correctly |
- on 850820,during Main Steam Line High Radiation Functional Test,Msiv B Closed.Caused by Wiring Error in MSIV Solenoids.Solenoids Replaced & Rewired Correctly
| | | 05000333/LER-1985-023, :on 850905,emergency Diesel Generators a & C Inadvertently Started.Caused by Operator Error.Operators Counseled on Necessity for Completing Procedural Step Before Starting Next Step |
- on 850905,emergency Diesel Generators a & C Inadvertently Started.Caused by Operator Error.Operators Counseled on Necessity for Completing Procedural Step Before Starting Next Step
| | | 05000333/LER-1985-024, :on 850913,since Sys Installation & Startup in May 1985,oxygen Analyzers a & B Out of Svc Numerous Times Due to Sensor Software & Procedural Problems.Vendor Will Help Resolve Problems During Outage |
- on 850913,since Sys Installation & Startup in May 1985,oxygen Analyzers a & B Out of Svc Numerous Times Due to Sensor Software & Procedural Problems.Vendor Will Help Resolve Problems During Outage
| | | 05000333/LER-1985-025, :on 851029,outboard Steam Supply Isolation Valve Experienced Motor Operator Failure Causing High Pressure Core Injection Sys to Be Declared Inoperative. Caused by Loose Locking Screw |
- on 851029,outboard Steam Supply Isolation Valve Experienced Motor Operator Failure Causing High Pressure Core Injection Sys to Be Declared Inoperative. Caused by Loose Locking Screw
| | | 05000333/LER-1985-026, :on 851031,breaker Operation on Output Line Caused Turbine Generator Load Unbalance Resulting in Reactor Scram.Caused by motor-operated Disconnect at 345 Kv Substation.Plant Performed Per Design |
- on 851031,breaker Operation on Output Line Caused Turbine Generator Load Unbalance Resulting in Reactor Scram.Caused by motor-operated Disconnect at 345 Kv Substation.Plant Performed Per Design
| |
|