05000302/LER-1997-045, Forwards LER 97-045-00,discussing Condition Re Two Valves in CAS Which Did Not Meet Seismic Class I Qualification Requirement.No Commitment Made in LER

From kanterella
Jump to navigation Jump to search
Forwards LER 97-045-00,discussing Condition Re Two Valves in CAS Which Did Not Meet Seismic Class I Qualification Requirement.No Commitment Made in LER
ML20198A728
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/31/1997
From: Rencheck M
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198A733 List:
References
3F1297-53, NUDOCS 9801060073
Download: ML20198A728 (1)


LER-2097-045, Forwards LER 97-045-00,discussing Condition Re Two Valves in CAS Which Did Not Meet Seismic Class I Qualification Requirement.No Commitment Made in LER
Event date:
Report date:
3022097045R00 - NRC Website

text

-

(

Florida Power m

c7.ew o mm"was December 31,1997 3F1297-53 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001

Subject:

LICENSEE EVENT REPORT (LER) 50 302/97 045-00

Dear Sir:

1 Please find the enclosed Licensee Event Report (LER) 50-302/97-045-00. This LER discusses a condition wherc two vs!ves in the Chemical Addition System did not meet the Seismic Class I qualification requiremerit. C .1tainment isolation valves CAV-6 and CAV-7 actuators were not "

restrained as originally designed. This report is being submitted pursuant to 10CFR50.73.

Sincerely,

/&

M. W. Rencheck Diroctor Nuclear Engineering and Projects MWR/pmp Enclosures xc: Regional Administrator, Region 11 Senior Resident inspector NRR Project Manager I

-g

'V & g il 9801000073 971231 PDR ADOCK 05000302

~

i,ki 1 CRYSTAL RNER ENEROY COMPLEX: t sno w. Power Line street . crystai River. rierton 3442*s70s . (ss2> 7ss44es A Flortsu Progresa compary