Revises Commitment Contained in Re LER 97-016-00. Revision Does Not Represent Substantial Change in Corrective Action Planned by FPC
ML20210P911
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/22/1997
From: Holden J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0897-42, 3F897-42, NUDOCS 9708270395
Download: ML20210P911 (3)


LER-2097-016, Revises Commitment Contained in Re LER 97-016-00. Revision Does Not Represent Substantial Change in Corrective Action Planned by FPC
Event date:
Report date:
3022097016R00 - NRC Website

text

. _. .. _ .

Florida -

Pcwer-EE"u,.

. o-. m so =

. August 22,1997

. 3F0897-42 U.S. Nuclear Regulatory Commission

. Atto: Document Control Desk Washington, D.C. 20555-0001 Subject- REVISION OF A COMMITMENT MADE IN LICENSEE EVENT REPORT (LER) 50-302/97-016-00

Reference:

FPC Letter to NRC 3F0797-16, " Licensee Event Report 50-302/97-016-00,"

dated July 11,1997

Dear Sir:

The' purpose of this letter is to revise a commitment contained in the subject letter. The following commitment was made in LER 50-302/97-016-00:

A program wil! be developed to identify design outputs and assumptions which could be invalidated by field activities or operating procedures. This action will be completed by December 15,1997.

During the initial stages of program development, FPC recognized a more affective corrective action to prevent recurrence for the type of calculation process weakness identified. Therefore, the above commitment is revised to the following:

Nuclear Engineering Procedure NEP-213. " Design Analyses / Calculations," will be revised to provide guidance for performing plant walkdowns verifying and

./p

){'

e ,

assessing field conditions that may affect desigt, input validity and calculation results. This action will be completed by October 30,1997.

9708270395 970822 PDR ADOCK 05000302 ((\h\hkh1kh,W,El!EH i mtEnla,m G PDR ***

CRYSTAL river ENERGY COMPLEX: 1s7so w Pow = une s . cryns mvw. Fw. 3442s s70s . tas2i 70s s4as A huds hopean connpeny

m v: i e.

.0-nd: .,

.M U_- S fe l. . uc ear Regulatory Commission

, ' 3F0897 42' F

- Page 2 (The above commitment revision does _not represent a substantial change in the corrective action planned by FPC. A revision to LER 50-302/97-016-00 is not necessary, ,

Sincerely, -

fdj

J. J. Holden -

Director-

' Site Nuclear operations i JJH/dwh

' Attachment

xc: Regional Administrator, Region 11 -

Senior Resident inspector e

NRR Project Manager -

i ..

1

?- -

~

. . . . . .. ~

. U.S. Nuclear Regulatory. Commission 4

' 3F0897 42 Page 3:

AITACRMENT

. The following table contains a listing of commitments contained in FPC's response:

RESPONSE COMMITMENT DUE DATE SECTION Cover Page Nuclear Engineering . Procedure NEP-213, " Design October 30,1997 Analyses / Calculations," will be revised to provide guidance for pedorming plant walkdowns verifying and assessing field conditions that may affect design input validity and calculation results.

t i

3

- , ,- ~ ,