05000302/LER-1997-031, Forwards LER 97-031-01,discussing Results of Evaluation Performed for Cables Identified in LER 97-031-00

From kanterella
Jump to navigation Jump to search
Forwards LER 97-031-01,discussing Results of Evaluation Performed for Cables Identified in LER 97-031-00
ML20198M876
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/15/1998
From: Rencheck M
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20198M878 List:
References
3F0198-10, 3F198-10, NUDOCS 9801200147
Download: ML20198M876 (1)


LER-2097-031, Forwards LER 97-031-01,discussing Results of Evaluation Performed for Cables Identified in LER 97-031-00
Event date:
Report date:
3022097031R00 - NRC Website

text

.

Florida Pcwer

!.O.*^

me.  %. s January 15,1998 3F0198-10 U.S. Nuclear Regulatory Commission Attn; Document Control Desk Washington, D.C. 20555-000

Subject:

LICENSEE EVENT REPORT 50-302/97 031-01

Reference:

Licensee Event Report 50-302/97-031-00 FPC to NRC letter 3F1097-17, dated October 27,1997

Dear Sir:

Please find the enclosed supplemental Licensee Event Report (LER) 50-302/97-031-01. In LER 50 302/97-03100, FPC discussed inadequate cable sizing and the potential for cables to experience a temperature higher than the cable insulation ratir,g. FPC made a commitrnent to perform an evaluation on the affected cables and suppement the LER with the results of the evaluation. This LER supplement discusses the reults of the evaluation performed by FPC for the cables identified in LER 50-302/97-031-00.

Sincerely, hM. W. Rencheck1%L Director Nuclear Engineering and Projects MWR/pmp Enclosure ,f xc: Regional Administrator, Region ll Senior Resident inspector h ji NRR Project Manager 9001200147 900115 PDR Il 11 I til l!Il l! ll ADOCK 05000302 ll. sll l 1:1 a l!l.l l! ll 5 pop , e .

CRYSTAL RIVER ENERGY COMPLEX: 1s7eo w . we s c,vns ww. rioeide 3442s e70s e tasai 7ss sese