I P~G Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 Phone 201 /622-7000 Mr. Boyce H. Grier Director of USNRC Off ice of Inspections and Enforcements Region 1 631 Park Avenue King of Prussia, Pennsylvania* 19406
Dear Mr. Grier:
LICENSE NO. DPR-70 DOCKET NO. 50-272 SUPPLEMENTAL REPORT REPORTABLE OCCURRENCE 78-26/03L July 12, 1978
~--'
- u
',}
(/)
'.'*)
.. f\\
Pursuant to the requirements of Salem Generating Station Unit No~ 1 Technical Specifications, Section 6.9.1.9.dt we ar~
submitting Supplemental Licensee Event Report-for Reportable Occurrence 78-26/03L.
Sincerely yours, F. P. Librizzi General Manager -
Electric Production r- "<
~ - r ;~
... r:_ C:)
r,~ CJ j
(...-;~~
\\~ ;;:~
- =::::...-:;
__, c::
0
'/i1if'~nrm n-..,_
Director, Office of Insp7ctio~*ib~"'-l!liijif lJOCKff fJLf CiiW!
and Enforcement (30 copies)
Utrij; CC:
Director, Office of Management Information and Program Control (3 copies)
The Energy People 1
e
.J~eport Npmber:
Report Date:
Occurrence Date:
Facility:
I 78-26/03L 7/12/78 5/23/78 Salem Generating Station Public Service Electric & Gas Company Hancocks Bridge, New Jersey 08038 ID.ENTIFICA']:"ION OF OCCURRENCE:
Failure of motor oper~ted valve lSJl (Parallel suction from RWST)
CONDITIONS PRIOR TO OCCURRENCE:
Cold ShutdoW!l - Mode 5 DESCRIPTION OF OCCURRENCE:
While performing Technica]. Specification surveillance test 4.0.S, an open signal was initiated and valve lSJl did not move.
Maintenance personnel were notified and found that Limitorque motor windings had failed to ground.
Further investigation revealed that failed motor was ;i.ncorrect size.
Motor should have been 10 ft. lb~ rated and 5 ft. lb. was found instalied.
DESIGNATION OF APPARENT CAU~E OF OCCURRENCE:
Failure of motor operator was caused by excessive current which re-sulted in motor windings failing to ground.
Excessive current was a result of incorrect motor sizing.
Motor was replaced due to events described in LER 77-03/03L.
Person-nel error resulted in incorrect motor being installed.
ANALYSIS OF OCCURRENCE:
The incorrect motor installed on lSJl threatened to cause a reduction 6f the degree of redundancy of the engineered safety features in that the suction from the RWST no longer met the required single failure *criteria.
CORRECTIVE ACTION
The £ailed motor on the operator of lSJl was replaced with a 10 ft. lb.
torque motor and tqe valve was retested satisfactory.
Although this occurrence is felt to be an isolated case, twenty-five (251. motor operators from the Safety Injection, Service Water, Con-tainment Spray, Chemical and Volume Control, and Residual Heat Removal Systems will be selected at,random and valve operator motor sizing will be verified.
L
~..,~ LER 78-26/03Le I *
lSJl Motor Operator Manufacturer:
Limitorque Size:
SMB-00 Prepared by ____ T_.--:-L __
._s_p~e_n_c_e_r ________ _
SORC Meeting No.
43-78
~-------------------
""*... *~u...c::
nc\\OULAI ORY COMMISSION
- ~te Report (7-771 LICENSEE EVENT REP.T lWvious Report Date 6/12/7)
CONTROL BLOCK: I I. I I I IQ (PLEASE PRINT OR TYPE ALL REQUIREC IN FORMATION I t
6 [ill *1 N !J I s I G I s I 1 IG)I o I o I -1 o I o I o I o I o I - I o I o 101 4 I 1 I 1 J 1 I 1 181 I I© 1
8 9
1.JCENSEE CODE 14 15 l.ICENSE NUMBER 25 26 1.ICENSE* TYPE JO 57 CAT 58 CON'T (TilJ 7
8
~~~~; L1J© I o I s I o I o I o I 2 I 1 I 2 101 o I s I 2 I 3 I 1 I a I© I o 17 I 1 I 2 I 7 1 a I@
60 61
. OOCl<ET NUMBER 68 69 EVENT CATE 74 75 REPORT CATE 80 EVENT DESCRIPTION ANO PROBABLE CONSEQUENCES@
[]JI} I While performing surveillance test. an open sjqnaJ was initiated and
(]JI] I valve lSJl did not move.
Investigation showed Limitorgue motor winding.I
(([!]
failed.
Further investigation revealed that incorrect*size motor was
[))))
installed.
Motor should have been 10 ft. lb. rated.
5 ft. lb. rated
[]JD was installed.
Tl)is is the first occurrence of this type.
[§))]
7 8 9 IIrrJ 7
8.
SYSTEM cooE I SIFI@
9 10
CAUSE
CAUSE COMP.
VAi.VE CODE SUBCODE COMPONENT CODE SUBCOOE SUBCODE l.!.l w@ 1v1A1L1v101P1e ~ L!J@
11
- 12.
13 18 19 20 SEQUENTIAL OCCURRENCE REPORT
/,"'.;\\
l.ER!RO CVENT YEAR REPORT NO.
CODE TYPE
\\:.:J RePoRr 17 I al 1-1 10121 61 1.....--1 I ol 31 LIJ I
1-NuMeER 21.
22 23 24 26 27 2S 29 JO 31 REVISION NC.
L.!..J 32 80 TAKEN ACTION ON PLANT METHOD HOURS SUBMITTED FORM :>UB.
SUPPi.i ER ACTION FUTURE EFFECT SHUTDOWN
~ ATTACHMENT NPR04 PRIME COMP.
COMPONENT MANUFACTURER L£J@W@
L!J@)
W I 01 01 o I
!. W@ W@ l!!.J@
33 34 35 36 37 40 41 42 43 I L I 2 I. 0 I 0 '
CAUSE DESCRIPTION ANO CORRECTIVE ACTIONS @
44 47 [JI[] I Motor* replaced due to events described in LER 77-03/03L.
Personnel OJJJ error resulted in incorrect motor being installed.
Correct size motor IIIlJ installed and retested.
25 valves selected for motor size verification.I OJil IIEJ 1
a 9 FACILITY ljQ\\
STATUS
% POWER OTI-IER STATUS \\:::;:!
o:m W I 0 I 0 I 0 !@l.._ _ ___,,;N:.:..,l.;;.;A---.. _ _.
1 a 9 10 12 n
ACTIVITY CONTENT t.=°\\
RELEASED OF RELEA$E
. AMOUNT OF ACTIVITY DE W@ L!J@I N/A 1
a 9
10
- 11 80 METHOD OF DISCOVERY DESCRIPTION @
OISCOVERY*
I W@lvalve Surveillance Test 44 45 46 80 I
Nl:A 44 45 80 PERSONNEL EXPOSURES
~
NUMBER
~TYPE~
DESCRIPTION~
ITEJ I o I o I o k~W~._..,____,N-.:./..;.A..;..._ ____________________ __.
1 a 9
, 1 12 13 PERSONNEi. INJURIES c.\\
so NUMBER OESCRIPTION~
ITTI] I olo I ol@).__ ___ _._.~N~A:..-------------------------~
1 a 9 11 12 so LOSS OF OR DAMAGE TO FACILITY f43\\
TYPE
DESCRIPTION
'::::;:J rIIIJ Lz.J@)'-------......-:*N:.o...:.:A~------------------------------1 7
8 9
10 PUBLICITY
(.;;-\\
NRC use 0 y
ISSUEOC,;\\ DESCRIPTION~
N l III:§] Lzj~I---* ----*-*-----**=N~/A~------------------
I I I I I I I I I I I I I~
1 a 9 10 68 69 aa ;;
so NAMEOFPREPARER~~--T L_. __
s~p~e-.-n~c~e~r=--~~~~~-
PHONE: (609)365-7000 Salen Ext.~
528
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000272/LER-2078-001-03, Inoperability of No. 14 Steam Flow Channel II Due to Excessive Trip Setpoint | Inoperability of No. 14 Steam Flow Channel II Due to Excessive Trip Setpoint | | | 05000272/LER-2078-002-03, Failure of Loop 13 Channel | Failure of Loop 13 Channel | | | 05000272/LER-2078-003-03, Excessive Air Flow Upon Exit of Containment | Excessive Air Flow Upon Exit of Containment | | | 05000272/LER-2078-004-99, Inoperability of Boron Injection Tank Due to Low Boron Concentration | Inoperability of Boron Injection Tank Due to Low Boron Concentration | | | 05000272/LER-2078-005-03, Loss of Position Indication on Valve | Loss of Position Indication on Valve | | | 05000272/LER-2078-006-03, Decrease in Pressurizer Pressure | Decrease in Pressurizer Pressure | | | 05000272/LER-2078-007-03, Low Battery Voltage | Low Battery Voltage | | | 05000272/LER-2078-008-03, Boron Concentration | Boron Concentration | | | 05000272/LER-2078-009-04, Letter Reportable Occurrence on Excessive Concentration of Suspended Solids in Non-Radioactive Waste Treatment Basin Effluent | Letter Reportable Occurrence on Excessive Concentration of Suspended Solids in Non-Radioactive Waste Treatment Basin Effluent | | | 05000272/LER-2078-011-03, Inadequate Air Flow Through No. 11 HEPA Train | Inadequate Air Flow Through No. 11 HEPA Train | | | 05000272/LER-2078-012-03, Inoperability of Apd Unit | Inoperability of Apd Unit | | | 05000272/LER-2078-013-01, Inoperability of Four Service Water Strainers | Inoperability of Four Service Water Strainers | | | 05000272/LER-2078-014-03, Reactor Coolant System Fluoride Sample | Reactor Coolant System Fluoride Sample | | | 05000272/LER-2078-015-04, Letter Reportable Occurrence on Non-Radwaste Sampling for Suspended Solids Analysis | Letter Reportable Occurrence on Non-Radwaste Sampling for Suspended Solids Analysis | | | 05000272/LER-2078-016-03, Excessive Tilt Ratio of Quadrant Power | Excessive Tilt Ratio of Quadrant Power | | | 05000272/LER-2078-017-03, Tilt Ratio During Power Escalation | Tilt Ratio During Power Escalation | | | 05000272/LER-2078-018-03, Excessive Trip Setpoint During Functional Test on PWR Range Channel N43 | Excessive Trip Setpoint During Functional Test on PWR Range Channel N43 | | | 05000272/LER-2078-019-04, Letter Reportable Occurrence on Monthly Water Quality Samples | Letter Reportable Occurrence on Monthly Water Quality Samples | | | 05000272/LER-2078-020-04, Letter Reportable Occurrence of Missed Sampling of River Water for Biocide | Letter Reportable Occurrence of Missed Sampling of River Water for Biocide | | | 05000272/LER-2078-021-03, Missed Surveillance of Fluoride Sample | Missed Surveillance of Fluoride Sample | | | 05000272/LER-2078-022-01, Seismic Test Results for NEMA 12 Enclosures | Seismic Test Results for NEMA 12 Enclosures | | | 05000272/LER-2078-024-04, Letter Reportable Occurrence on Excessive Concentration of Iodine in Milk Sample Collected at Environmental Sampling Location | Letter Reportable Occurrence on Excessive Concentration of Iodine in Milk Sample Collected at Environmental Sampling Location | | | 05000272/LER-2078-025-03, Re Missed Tech. Specification Surveillance: 4.8.2.4.1 DC and 4.8.2.2 AC Breaker Alignment and Power Availability | Re Missed Tech. Specification Surveillance: 4.8.2.4.1 DC and 4.8.2.2 AC Breaker Alignment and Power Availability | | | 05000272/LER-2078-026-03, Failure of Motor Operated Valve | Failure of Motor Operated Valve | | | 05000272/LER-2078-027-03, Malfunctioning Exterior Door of Containment Entry Air Lock | Malfunctioning Exterior Door of Containment Entry Air Lock | | | 05000272/LER-2078-028-03, No. 1 - Licensee Event Report 1978 for Reportable Occurrence 78-28/03L Re Inoperable 100 Ft. Elevation Air Lock Interior Door | No. 1 - Licensee Event Report 1978 for Reportable Occurrence 78-28/03L Re Inoperable 100 Ft. Elevation Air Lock Interior Door | | | 05000272/LER-2078-029-01, Inoperability of Two Power Range Channels During Training Startups | Inoperability of Two Power Range Channels During Training Startups | | | 05000272/LER-2078-030-03, Licensee Event Report 1978 for Reportable Occurrence 78-30/03L Re Control Bank and Shutdown Rod Misalignment | Licensee Event Report 1978 for Reportable Occurrence 78-30/03L Re Control Bank and Shutdown Rod Misalignment | | | 05000272/LER-2078-032-04, Letter Reportable Occurrence on Non-Radwaste Sampling for Suspended Solids Analysis | Letter Reportable Occurrence on Non-Radwaste Sampling for Suspended Solids Analysis | | | 05000272/LER-2078-033-03, No. 11 Steam Generator Steam Flow Channel II | No. 11 Steam Generator Steam Flow Channel II | | | 05000272/LER-2078-034-04, Letter Reportable Occurrence on Missed Surveillance of Monthly Functional Test of Steam Generator Blowdown Radiation Monitoring Channels | Letter Reportable Occurrence on Missed Surveillance of Monthly Functional Test of Steam Generator Blowdown Radiation Monitoring Channels | | | 05000272/LER-2078-035-03, Loss of Power to No. 2 Station Power Transformer | Loss of Power to No. 2 Station Power Transformer | | | 05000272/LER-2078-036-03, Licensee Event Report 1978 for Reportable Occurrence 78-36/03L Re Vital Bus Under Voltage Relay Setting Outside Technical Specification Limit | Licensee Event Report 1978 for Reportable Occurrence 78-36/03L Re Vital Bus Under Voltage Relay Setting Outside Technical Specification Limit | | | 05000272/LER-2078-037-04, Letter Reportable Occurrence on Non-Radwaste Sampling for Suspended Solids | Letter Reportable Occurrence on Non-Radwaste Sampling for Suspended Solids | | | 05000272/LER-2078-038-03, Licensee Event Report 1978 for Reportable Occurrence 78-38/03L Re No. 11 Steam Generator Flow Channel II Inoperable | Licensee Event Report 1978 for Reportable Occurrence 78-38/03L Re No. 11 Steam Generator Flow Channel II Inoperable | | | 05000272/LER-2078-039-03, Licensee Event Report 1978 for Reportable Occurrence 78-39/03L Re No. 13 Containment Fan Foil Unit Inoperable | Licensee Event Report 1978 for Reportable Occurrence 78-39/03L Re No. 13 Containment Fan Foil Unit Inoperable | | | 05000272/LER-2078-040-03, Inoperability of Makeup Valve from Demineralized Water Plant | Inoperability of Makeup Valve from Demineralized Water Plant | | | 05000272/LER-2078-041-03, Excessive Quadrant Power Tilt Ratio During Power Escalation | Excessive Quadrant Power Tilt Ratio During Power Escalation | | | 05000272/LER-2078-042-03, Excessive Trip Setpoint During Functional Test on No. 13 S/G Steam Flow Channel 1 | Excessive Trip Setpoint During Functional Test on No. 13 S/G Steam Flow Channel 1 | | | 05000272/LER-2078-043-03, LER 1978 for Reportable Occurrence 78-43/03L on Quadrant Power Tilt Ratio Greater than 1.02 | LER 1978 for Reportable Occurrence 78-43/03L on Quadrant Power Tilt Ratio Greater than 1.02 | | | 05000272/LER-2078-044-03, Inoperability of No. 11 S/G Feedwater Flow Channel 2 | Inoperability of No. 11 S/G Feedwater Flow Channel 2 | | | 05000272/LER-2078-045-03, LER 1978 for Reportable Occurrence 78-45/03L on 100 Ft. Elevation Personnel Airlock Inoperable | LER 1978 for Reportable Occurrence 78-45/03L on 100 Ft. Elevation Personnel Airlock Inoperable | | | 05000272/LER-2078-056-03, Submit Licensee Event Report for Reportable Occurrence 78-56/03L | Submit Licensee Event Report for Reportable Occurrence 78-56/03L | | | 05000272/LER-2078-080-03, Inoperability of 1B Diesel | Inoperability of 1B Diesel | |
|