- ~.)PS~G Public Service Electric and Gas Company Mr. Boyce H~ Grier Director of USNRC Off ice of Inspections and Enforcements Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406
Dear Mr. Grier:
LICENSE NO. DPR-70 DOCKET NO.
50~272 REPORTABLE OCCURRENCE 78-02/03L Pursuant to the requirements of Salem Generating Station Unit No. 1 Technical Specifications, Section 6.9.1, we are submitting Licensee Event Report for Reportable Occurrence 78*-02/03L.
This report is required within thirty (30) days of the occurrence.
Sincerely yours, F. P. Librizzi General Manager -
Electric Production CC:
Director, Office of Inspection and Enforcement (30 copies)
Director, Office of Management Information and Program Control (3 copies)
The Energy People l/ooa/ s W 0 I 1
95-2001 300M 8-75
__ Report Number:
Report Date:
. Occurrence Date:
Facility:
78~02/03L 1/.78 1/6/78 Salem Generating Station Public Service Electric & Gas Company Hancocks Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:
Inoperable Reactor Trip Instrumentation, Reactor Coolant Loop 13 OTt:.T CONDITIONS PRIOR TO OCCURRENCE:
Operational Mode 1
'Reactor Power:
88% increasing to 100%
DESCRIPTION OF OCCURRENCE:
At 0650 hours0.00752 days <br />0.181 hours <br />0.00107 weeks <br />2.47325e-4 months <br />, while increasing reactor power to 100%, the "Over-temperature t:.T.
Block Rod Withdrawal and Start Turbine Runback" alarm was received in the control.room.
Loop 13 OTt:.T.channel had failed.
The control operator blocked loop 13 t:.T and Tavg Deviation and declared loop 13 OTt:.T channel inoperable.
Technical Specifica-tion 3.3.1.1 Action Statement No. 2 was implemented and.the OTt:.T channel was placed in the tripped condition..
Instrumentation per-sonnel investigated and reworked loop 13 OTt:.T channel such that the channel was returned to service at 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br />.
Action State-ment No. 2 for LCO 3.3.1.1 was then terminated.
DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:
The.cause* of this occurrence was the failure of a Hagan Function Generator.
The function generator failure resulted from a failed capacitor.
The failure of this capacitor reduced the OTt:.T set-point to the actual t:.T value which is in the conservative direction.
ANALYSIS OF OCCURRENCE:
Technical Specification Action Statement No. 2 for LCO 3.3.1.l states that with the number of operable channels one less than the total number of channels, startup and/or power operation may proceed provided the following conditions are satisfied:
a)
The inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
b)
The minimum channels operable requirement is met.
c)
Either, Thermal Power is restricted to < 75% of Rated Thermal Power and the Power Range, Neutron Flux-Trip Setpoint is reduced to < 85% of Rated Thermal Power within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; or, Quadrant Power Tilt Ratio is monitored at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
LER 78-02/03L 1/11/78 L90P 13 OT~T channel was placed in the tripped condition within 1
~.hour. All other OT~T channels were operable throughout this event~
' The channel was returned to service within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, therefore, monitoring of the Quadrant Power Tilt Ratio was not required.
CORRECTIVE ACTION
The failed function generator was taken to the instrumentation repair shop where investigation revealed the failed capacitor.
The capacitor was replaced and the unit was bench tested with satisfactory results.
The function generator was returned to service in the loop 13 OT~T channel.
Functional testing confirmed operability.
FAILURE DATA:
Function Generator Manufacturer: -
Type:
Hagan Controls Orville, Ohio 4111513 Prepared by T. L. Spencer
~~~~~--=-~~~~~~~
SORC Meeting No.
4-78
--.~~.....,-~~~~~~-
Manager.~
al em Genera ting Station
e.
LICENSEE EVENT REPORT REPORT DATE: 1/11/78 CONTROL BLOCK UCENSEE NAME 6
LICENSE NUM8ER IOIOl-IOIO!OIOIOl-1 OIOJ 15 2
REPORT REPORT CATEGORY TV" SOURCE OOCKET NUMBER e
LICENSE TVPI!:
k 41 11 11 11 l~
E.Vl!:NT OAT£
~
CON'T's,-1-J ~ ~ ~p I 51 o I -I o I 2 I 71 2J I 0111 01 6171 81 69 14 EVENT OESCl'llPTION EVENT TVPI!:
REPORT OATllt I 0 I 11 11 11 7 I ~
75
@))I While increasing power to
- iOO%., Loop 13 OTf:.T Channel failed.
Action I
7 8 9 ao
@)) Statement 2 for LCO 3.3.1.1 was implemented and the failed cahnnel place 7
8
@:E]I in the tripped condition.
All remaining channels were operable.
The J 1 el *
@J!ll failed capacitor was replaced and the function generator recalibrated.
I 1
s g ao [fil!] I This is the first OTAT channel failure.
(78-02/03Ll I
7 8 9 PRIME SQ SVSTl!:M
CAUSE
COMPONENT COMPONENT r,;'T;'1 COO£ COOE COMPONENT COOE SUPPl..IER MANUFACTURER l:!.1!.Jl.LlA.J
~ IIINISITl13JjJJ LNJ IHI 011151 7
8 9 10 11 12 17 43 44 47 VIOLATION lliJ 48 CAUSE OESCl'llftTlON
~!This occurrence was caused by a failed capacitor in a Hagan Control.
@]f 1\\.ype 4111513 Furiction Generator.
I so I
1 a g ao IIIfil 1 a
-:g~.--,.-----------------------------------------ao~
l"AClt..ITV MTHOOO...
mil STrFi.
7 IJ
'lo POWER 101a1aJ 10 I
OT~
STATUS OISCOVERV l~ __ N 1,A ____ __.I l1!J 13 44 45 OISCOVE. R'f OlltSCAIPTION N;A ao l"ORMO...
ACTIVITY CONTENT Rlltl..EASEO QI' RELEASE AMOUNT OF ACTIVITY
(!lil
~ l.[j I
N/A 7
8 9
10 11 LOCATION 0" Rf:U::ASE I
'~-----------N~/_A __________ ~I
~
~
ao P£RSONNEL EXPOSURES NUM9ER TV~
Ol!:SCAIPTION 1010101 [fill~.----......-.N~/=A"------------------------------------..sJ 7
9 11 12 13 15 PERSONNEL INJURIES NUMet:R 0£SCAIPTION
µ:El190101~ 1 1
t;..112r--------""N.._/""'A'"'---------------------~J OFFSIT1! CONSEQUENCH
µI!! t!I N/A LOSS OR OAMAGE TO FACILITY TV~
OESCAIPTION GJ!}1z1 nl--.----~~~*~N~/A:.:-_.._ __ _._ __________ ~------------.....iJ 1 ar-
.ta IS P\\JILICITY G:Iil"::----------.---------..Lll.i'..g..-------------------------------~
7
~'r'-~-----~-~-------~~~-~------~--------------.;....--,=
[I]!]~----------------------------------------------------~
7 8 9 ID NAMtl: _______
T.;::..:o:--=L~. -=S-=o~e:.=n.a.;c:io..::ce.-r....,. __ _
PHONI: (609)365-7000 Ext. Salem 528
to**r.r'~ r,**E* 1
,,i u :~~. 1 1.;.~c DISTi\\iBUTION SERVICES BRANCH
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000272/LER-2078-001-03, Inoperability of No. 14 Steam Flow Channel II Due to Excessive Trip Setpoint | Inoperability of No. 14 Steam Flow Channel II Due to Excessive Trip Setpoint | | | 05000272/LER-2078-002-03, Failure of Loop 13 Channel | Failure of Loop 13 Channel | | | 05000272/LER-2078-003-03, Excessive Air Flow Upon Exit of Containment | Excessive Air Flow Upon Exit of Containment | | | 05000272/LER-2078-004-99, Inoperability of Boron Injection Tank Due to Low Boron Concentration | Inoperability of Boron Injection Tank Due to Low Boron Concentration | | | 05000272/LER-2078-005-03, Loss of Position Indication on Valve | Loss of Position Indication on Valve | | | 05000272/LER-2078-006-03, Decrease in Pressurizer Pressure | Decrease in Pressurizer Pressure | | | 05000272/LER-2078-007-03, Low Battery Voltage | Low Battery Voltage | | | 05000272/LER-2078-008-03, Boron Concentration | Boron Concentration | | | 05000272/LER-2078-009-04, Letter Reportable Occurrence on Excessive Concentration of Suspended Solids in Non-Radioactive Waste Treatment Basin Effluent | Letter Reportable Occurrence on Excessive Concentration of Suspended Solids in Non-Radioactive Waste Treatment Basin Effluent | | | 05000272/LER-2078-011-03, Inadequate Air Flow Through No. 11 HEPA Train | Inadequate Air Flow Through No. 11 HEPA Train | | | 05000272/LER-2078-012-03, Inoperability of Apd Unit | Inoperability of Apd Unit | | | 05000272/LER-2078-013-01, Inoperability of Four Service Water Strainers | Inoperability of Four Service Water Strainers | | | 05000272/LER-2078-014-03, Reactor Coolant System Fluoride Sample | Reactor Coolant System Fluoride Sample | | | 05000272/LER-2078-015-04, Letter Reportable Occurrence on Non-Radwaste Sampling for Suspended Solids Analysis | Letter Reportable Occurrence on Non-Radwaste Sampling for Suspended Solids Analysis | | | 05000272/LER-2078-016-03, Excessive Tilt Ratio of Quadrant Power | Excessive Tilt Ratio of Quadrant Power | | | 05000272/LER-2078-017-03, Tilt Ratio During Power Escalation | Tilt Ratio During Power Escalation | | | 05000272/LER-2078-018-03, Excessive Trip Setpoint During Functional Test on PWR Range Channel N43 | Excessive Trip Setpoint During Functional Test on PWR Range Channel N43 | | | 05000272/LER-2078-019-04, Letter Reportable Occurrence on Monthly Water Quality Samples | Letter Reportable Occurrence on Monthly Water Quality Samples | | | 05000272/LER-2078-020-04, Letter Reportable Occurrence of Missed Sampling of River Water for Biocide | Letter Reportable Occurrence of Missed Sampling of River Water for Biocide | | | 05000272/LER-2078-021-03, Missed Surveillance of Fluoride Sample | Missed Surveillance of Fluoride Sample | | | 05000272/LER-2078-022-01, Seismic Test Results for NEMA 12 Enclosures | Seismic Test Results for NEMA 12 Enclosures | | | 05000272/LER-2078-024-04, Letter Reportable Occurrence on Excessive Concentration of Iodine in Milk Sample Collected at Environmental Sampling Location | Letter Reportable Occurrence on Excessive Concentration of Iodine in Milk Sample Collected at Environmental Sampling Location | | | 05000272/LER-2078-025-03, Re Missed Tech. Specification Surveillance: 4.8.2.4.1 DC and 4.8.2.2 AC Breaker Alignment and Power Availability | Re Missed Tech. Specification Surveillance: 4.8.2.4.1 DC and 4.8.2.2 AC Breaker Alignment and Power Availability | | | 05000272/LER-2078-026-03, Failure of Motor Operated Valve | Failure of Motor Operated Valve | | | 05000272/LER-2078-027-03, Malfunctioning Exterior Door of Containment Entry Air Lock | Malfunctioning Exterior Door of Containment Entry Air Lock | | | 05000272/LER-2078-028-03, No. 1 - Licensee Event Report 1978 for Reportable Occurrence 78-28/03L Re Inoperable 100 Ft. Elevation Air Lock Interior Door | No. 1 - Licensee Event Report 1978 for Reportable Occurrence 78-28/03L Re Inoperable 100 Ft. Elevation Air Lock Interior Door | | | 05000272/LER-2078-029-01, Inoperability of Two Power Range Channels During Training Startups | Inoperability of Two Power Range Channels During Training Startups | | | 05000272/LER-2078-030-03, Licensee Event Report 1978 for Reportable Occurrence 78-30/03L Re Control Bank and Shutdown Rod Misalignment | Licensee Event Report 1978 for Reportable Occurrence 78-30/03L Re Control Bank and Shutdown Rod Misalignment | | | 05000272/LER-2078-032-04, Letter Reportable Occurrence on Non-Radwaste Sampling for Suspended Solids Analysis | Letter Reportable Occurrence on Non-Radwaste Sampling for Suspended Solids Analysis | | | 05000272/LER-2078-033-03, No. 11 Steam Generator Steam Flow Channel II | No. 11 Steam Generator Steam Flow Channel II | | | 05000272/LER-2078-034-04, Letter Reportable Occurrence on Missed Surveillance of Monthly Functional Test of Steam Generator Blowdown Radiation Monitoring Channels | Letter Reportable Occurrence on Missed Surveillance of Monthly Functional Test of Steam Generator Blowdown Radiation Monitoring Channels | | | 05000272/LER-2078-035-03, Loss of Power to No. 2 Station Power Transformer | Loss of Power to No. 2 Station Power Transformer | | | 05000272/LER-2078-036-03, Licensee Event Report 1978 for Reportable Occurrence 78-36/03L Re Vital Bus Under Voltage Relay Setting Outside Technical Specification Limit | Licensee Event Report 1978 for Reportable Occurrence 78-36/03L Re Vital Bus Under Voltage Relay Setting Outside Technical Specification Limit | | | 05000272/LER-2078-037-04, Letter Reportable Occurrence on Non-Radwaste Sampling for Suspended Solids | Letter Reportable Occurrence on Non-Radwaste Sampling for Suspended Solids | | | 05000272/LER-2078-038-03, Licensee Event Report 1978 for Reportable Occurrence 78-38/03L Re No. 11 Steam Generator Flow Channel II Inoperable | Licensee Event Report 1978 for Reportable Occurrence 78-38/03L Re No. 11 Steam Generator Flow Channel II Inoperable | | | 05000272/LER-2078-039-03, Licensee Event Report 1978 for Reportable Occurrence 78-39/03L Re No. 13 Containment Fan Foil Unit Inoperable | Licensee Event Report 1978 for Reportable Occurrence 78-39/03L Re No. 13 Containment Fan Foil Unit Inoperable | | | 05000272/LER-2078-040-03, Inoperability of Makeup Valve from Demineralized Water Plant | Inoperability of Makeup Valve from Demineralized Water Plant | | | 05000272/LER-2078-041-03, Excessive Quadrant Power Tilt Ratio During Power Escalation | Excessive Quadrant Power Tilt Ratio During Power Escalation | | | 05000272/LER-2078-042-03, Excessive Trip Setpoint During Functional Test on No. 13 S/G Steam Flow Channel 1 | Excessive Trip Setpoint During Functional Test on No. 13 S/G Steam Flow Channel 1 | | | 05000272/LER-2078-043-03, LER 1978 for Reportable Occurrence 78-43/03L on Quadrant Power Tilt Ratio Greater than 1.02 | LER 1978 for Reportable Occurrence 78-43/03L on Quadrant Power Tilt Ratio Greater than 1.02 | | | 05000272/LER-2078-044-03, Inoperability of No. 11 S/G Feedwater Flow Channel 2 | Inoperability of No. 11 S/G Feedwater Flow Channel 2 | | | 05000272/LER-2078-045-03, LER 1978 for Reportable Occurrence 78-45/03L on 100 Ft. Elevation Personnel Airlock Inoperable | LER 1978 for Reportable Occurrence 78-45/03L on 100 Ft. Elevation Personnel Airlock Inoperable | | | 05000272/LER-2078-056-03, Submit Licensee Event Report for Reportable Occurrence 78-56/03L | Submit Licensee Event Report for Reportable Occurrence 78-56/03L | | | 05000272/LER-2078-080-03, Inoperability of 1B Diesel | Inoperability of 1B Diesel | |
|