O PSEG PubFc Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station March 11, 1983 Mr.
R. C. Haynes Regional Administrator USNRC Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406
Dear Mr. Haynes:
LICENSE NO. DPR-70 DOCKET NO. 50-272 REPORTABLE OCCURRENCE 83-015/03L Pursuant to the requirements of Salem Generating Station Unit No.
1, Technical Specifications, Section 6.9.1.9.b, we are submitting Licensee Event Report for Reportable Occurrence 83-015/03L.
This report is required within thirty (30) days of the occurrence.
Sincerely yours,
, b/f H.
J. Midura l
General Manager -
Salem Operations b[
l-RF:ks CC:
Distribution 8303180419 830311
') p PDRADOCK05000g The Energy People
% 2189 (20M) 11-81
Report Number:
83-015/03L Report Date:
03-10-83 Occurrence Date: '02-10-83 Facility:-
Salem Generating Station Unit 1 Public Service Electric & Gas Company Hancock's Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:
Electrical Power Systems - No. 1A Emergency Diesel Generator - Inoperable.
This report was initiated by Incident Report 83-039 CONDITIONS PRIOR TO OCCURRENCE:
Mode 4 - RX Power 0 % - Unit Load 0 MWe.
DESCRIPTION OF OCCURRENCE:
At_0300 hours, February 10, 1983, during routine surveillance testing of No. 1A Emergency Diesel Generator, an equipment operator observed a Jacket Water High Temperature slarm.
The operator immediately tripoed the diesel; he noticed that Service Water Flow Control Valve 11SW42 was apparently not opening sufficiently to adequately cool the jacket water system.
The generator was declared inoperable and at 0302 hours0.0035 days <br />0.0839 hours <br />4.993386e-4 weeks <br />1.14911e-4 months <br />, February 10, 1983, Technical Specification Action Statement 3.8.1.1a was entered.
Surveillance of the redundant A.C.
power sources was immediately performed and operability satisfactorily demonstrated.
APPARENT CAUSE OF OCCURRENCE:
At 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />, the equipment operator shifted the controller for Valve 11SW42 to the manual mode, opened the valve, and restarted the diesel.
The jacket water temperature remained in specification, the controller was shifted to the automatic mode, and the valve operated satisfactorily during subsequent testing of the emergency generator.
A calibration check of the service water flow control transmitter was satisfactory, and lacking any further evidence of problems, the controller setpoint was readjusted and the generator was retested.
The surveillance was satisfactory, the generator was declared operable, and at 0539 hours0.00624 days <br />0.15 hours <br />8.912037e-4 weeks <br />2.050895e-4 months <br />, February 10, 1983, Action Statement 3.8.1.1a was terminated.
Further investigation of the problem was prompted by review of the
corrective action
It revealed that a missing handwheel on Instrument Root Valve 11SW41 may have resulted in pressure fluctuations in the flow transmitter high side sensing line.
The valve is of the
~
,LER 83-015/03L APPARENT CAUSE OF OCCURRENCE: (cont'd)
' diaphragm type; with the handwheel missing, the valve was in an intermediate, unrestrained position.
Although the sensing line was not isolated, movement of the valve diaphragm during system operation could result in pressure variations, which in turn may have caused erratic operation of Valve 11SW42.
As noted, subsequent operation of the generator was satisfactory, and the problem was apparently isolated in nature.
ANALYSIS OF OCCURRENCE:
The operability of the A.C.
and D.C.
power sources and associated distribution systems during operation ensures that sufficient power will be available to supply the safety related equipment for safe shutdown of the facility and mitigation of accidents.
The requirements are consistent with the initial condition assumptions of the-secident analyses, and are based on maintaining a single supply with an assumed loss of offsite power and single failure of the other A.C. source.
As noted, the redundant A.C.
sources were operable, and therefore no risk to the health and safety of the public was involved.
The occurrence constituted operation in a degraded mode permitted by a limiting condition for operation.
The event is reportable in 1
accordance with Technical Specification 6.9.1.9b.
Action Statement 3.8.1.1a requires:
With either an offsite circuit or diesel generator of the required A.C.
electrical power sources inoperable, demonstrate the operability of the remaining A.C.
sources by performing 1
surveillance requirements 4.8.1.1.1a and 4.8.1.1.2a2 within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least two offsite circuits and three diesel generators to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the time of initial loss or be in at least hot standby within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in cold shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
CORRECTIVE ACTION
As noted, the operability of redundant A.C.
power sources was immediately demonstrated.
Following satisfactory performance of surveillance testing, the generator was declared operable.
Upon discovery of the missing valve handwheel, the handwheel was replaced and the valve was opened.
The possible indeterminate position of diaphragm type valves resulting from the loss of a handwheel will be addressed in weekly operations information directives.
The incident'will also be discussed in the station training program, as part of a continuing effort to upgrade operating and maintenance practices.
]
- LER 83-015/03L.
FAILURE DATA:
Grinnell Corp.
1 inch Saunders Valve Ty pe - 1876-MC-OL Prepared By R.
Frahm
/
k General-Manager -
SORC Meeting No.
83-091B i
4 y
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000272/LER-1983-001-03, /03L-0:on 830104,vital Bus 1B Tripped,Rendering RHR Loop Inoperable.Caused by Differential Relay Protection. Redundant RHR Loop Immediately Placed in Operation | /03L-0:on 830104,vital Bus 1B Tripped,Rendering RHR Loop Inoperable.Caused by Differential Relay Protection. Redundant RHR Loop Immediately Placed in Operation | | | 05000311/LER-1983-001, Forwards LER 83-001/03L-0.Detailed Event Analysis Encl | Forwards LER 83-001/03L-0.Detailed Event Analysis Encl | | | 05000311/LER-1983-001-03, /03L-0:on 830106,reactor Trip Breaker a Failed to Open Following Reactor Trip.Caused by Malfunctioning Breaker Undervoltage Relay Due to Binding of Relay Mechanism by Dirt or Corrosion.Breaker Replaced.Periodic Insp Initiate | /03L-0:on 830106,reactor Trip Breaker a Failed to Open Following Reactor Trip.Caused by Malfunctioning Breaker Undervoltage Relay Due to Binding of Relay Mechanism by Dirt or Corrosion.Breaker Replaced.Periodic Insp Initiated | | | 05000311/LER-1983-002, Forwards LER 83-002/03L-0.Detailed Event Analysis Encl | Forwards LER 83-002/03L-0.Detailed Event Analysis Encl | | | 05000311/LER-1983-002-03, /03L-0:on 830314,discovered Pressurizer Code Safety Valves 2PR3,2PR4 & 2PR5,tested by Wyle Labs During 830224-25,lifted Below 2,485 Psig Plus/Minus 1% Pressure Range & Displayed Heavy Audible & Visual Seat Leakage | /03L-0:on 830314,discovered Pressurizer Code Safety Valves 2PR3,2PR4 & 2PR5,tested by Wyle Labs During 830224-25,lifted Below 2,485 Psig Plus/Minus 1% Pressure Range & Displayed Heavy Audible & Visual Seat Leakage | | | 05000272/LER-1983-002-01, /01T-0:on 830106,station Power Transformer 12 de-energized for Planned Maint.Loss of Power to Automatic Starting Feature on Both Diesel Fire Pumps Resulted.Caused by Oversight Due to Human Error.Personnel Counseled | /01T-0:on 830106,station Power Transformer 12 de-energized for Planned Maint.Loss of Power to Automatic Starting Feature on Both Diesel Fire Pumps Resulted.Caused by Oversight Due to Human Error.Personnel Counseled | | | 05000272/LER-1983-003, Forwards LER 83-003/04L-0.Detailed Event Analysis Encl | Forwards LER 83-003/04L-0.Detailed Event Analysis Encl | | | 05000272/LER-1983-003-04, /04L-0:on 830121,during Commencement of Refueling Shutdown for Unit 2,Unit 1 Restart Delayed Approx 7 Wks. Caused by Problems W/Steam Generator Nozzle Dams & Degradation of Welds in Svc Water Piping | /04L-0:on 830121,during Commencement of Refueling Shutdown for Unit 2,Unit 1 Restart Delayed Approx 7 Wks. Caused by Problems W/Steam Generator Nozzle Dams & Degradation of Welds in Svc Water Piping | | | 05000311/LER-1983-003-03, /03L-0:on 830111,rod Position Indicator Channel 1SA2 Indicated Approx Half Scale,Contrary to Flux Map Indication That No Change in Rod Position Occurred.Caused by Failed Signal Conditioner.Module Replaced | /03L-0:on 830111,rod Position Indicator Channel 1SA2 Indicated Approx Half Scale,Contrary to Flux Map Indication That No Change in Rod Position Occurred.Caused by Failed Signal Conditioner.Module Replaced | | | 05000311/LER-1983-003, Forwards LER 83-003/03L-0.Detailed Event Analysis Encl | Forwards LER 83-003/03L-0.Detailed Event Analysis Encl | | | 05000311/LER-1983-004-04, /04L-0:on 830317,during Gaseous Effluent Testing, Iodine/Particulate Collection Device Sample Pump Deenergized.Caused by Not Including Pump on Electrical Distribution List.Tagging Sys Will Be Revised | /04L-0:on 830317,during Gaseous Effluent Testing, Iodine/Particulate Collection Device Sample Pump Deenergized.Caused by Not Including Pump on Electrical Distribution List.Tagging Sys Will Be Revised | | | 05000311/LER-1983-004, Forwards LER 83-004/04L-0.Detailed Event Analysis Encl | Forwards LER 83-004/04L-0.Detailed Event Analysis Encl | | | 05000272/LER-1983-004, Forwards LER 83-004/03L-0.Detailed Event Analysis Encl | Forwards LER 83-004/03L-0.Detailed Event Analysis Encl | | | 05000272/LER-1983-004-03, /03L-0:on 830124,equipment Operator Discovered Leak on Diesel Generator 1B Jacket Water Sys.Caused by Cracked Piping Nipple Due to Personnel Standing on Jacket Water Sys Piping.Cracked Nipple Replaced | /03L-0:on 830124,equipment Operator Discovered Leak on Diesel Generator 1B Jacket Water Sys.Caused by Cracked Piping Nipple Due to Personnel Standing on Jacket Water Sys Piping.Cracked Nipple Replaced | | | 05000311/LER-1983-005-03, /03X-1:on 830122,both Channels of Pressurizer Overpressurization Protection Sys Declared Inoperable Due to Leakage in Pressurizer Relief Lines.Porv Plugs Replaced & PORV Circuitry Modified | /03X-1:on 830122,both Channels of Pressurizer Overpressurization Protection Sys Declared Inoperable Due to Leakage in Pressurizer Relief Lines.Porv Plugs Replaced & PORV Circuitry Modified | | | 05000311/LER-1983-005, Forwards LER 83-005/03L-0.Detailed Event Analysis Encl | Forwards LER 83-005/03L-0.Detailed Event Analysis Encl | | | 05000272/LER-1983-005, Forwards LER 83-005/03L-0.Detailed Event Analysis Encl | Forwards LER 83-005/03L-0.Detailed Event Analysis Encl | | | 05000272/LER-1983-005-03, /03L-0:on 830121,RHR Sys Automatic Isolation Function Not Tested Prior to Placing RHR Sys in Operation. Caused by Procedure Problems & Personnel Inexperience. Procedures Revised | /03L-0:on 830121,RHR Sys Automatic Isolation Function Not Tested Prior to Placing RHR Sys in Operation. Caused by Procedure Problems & Personnel Inexperience. Procedures Revised | | | 05000311/LER-1983-006-04, /04L-0:on 830408,decreased Sensitivity of Channel 2R41C Plant Vent Noble Gas Monitor Rendered Waste Gas Discharge Line Automatic Isolation Feature Inoperable.Caused by Leakage on Monitor Sample Lines & Internal Connections | /04L-0:on 830408,decreased Sensitivity of Channel 2R41C Plant Vent Noble Gas Monitor Rendered Waste Gas Discharge Line Automatic Isolation Feature Inoperable.Caused by Leakage on Monitor Sample Lines & Internal Connections | | | 05000311/LER-1983-006, Forwards LER 83-006/04L-0.Detailed Event Analysis Encl | Forwards LER 83-006/04L-0.Detailed Event Analysis Encl | | | 05000272/LER-1983-006-03, /03L-0:on 830126 & 28 Nonseismically Qualified Components & Power Boxes Discovered Installed in Dc Control Power Feeds to Emergency Diesel Generators.Caused by Personnel Oversight.Power Box Components Replaced | /03L-0:on 830126 & 28 Nonseismically Qualified Components & Power Boxes Discovered Installed in Dc Control Power Feeds to Emergency Diesel Generators.Caused by Personnel Oversight.Power Box Components Replaced | | | 05000272/LER-1983-006, Forwards LER 83-006/03L-0.Detailed Event Analysis Encl | Forwards LER 83-006/03L-0.Detailed Event Analysis Encl | | | 05000311/LER-1983-007, Telecopy Message of LER 83-007/01P:on 830218,two 1,000-kip Steam Generator Snubbers Failed to Meet Lockup & Bleed Rate Velocity Requirements.Cause Not Stated.Investigation Continuing.Detailed Rept to Be Submitted in 14 Days | Telecopy Message of LER 83-007/01P:on 830218,two 1,000-kip Steam Generator Snubbers Failed to Meet Lockup & Bleed Rate Velocity Requirements.Cause Not Stated.Investigation Continuing.Detailed Rept to Be Submitted in 14 Days | | | 05000272/LER-1983-007-03, /03L-0:on 830129,control Room Operator Discovered Low Flow Through Number 14 Reactor Coolant Loop Resistance Thermometer Detector Bypass.Caused by Obstruction in Hot Leg Flowpath.Hot Leg Cycled & Bypass Flow Restored to Norm | /03L-0:on 830129,control Room Operator Discovered Low Flow Through Number 14 Reactor Coolant Loop Resistance Thermometer Detector Bypass.Caused by Obstruction in Hot Leg Flowpath.Hot Leg Cycled & Bypass Flow Restored to Normal | | | 05000272/LER-1983-007, Forwards LER 83-007/03L-0.Detailed Event Analysis Encl | Forwards LER 83-007/03L-0.Detailed Event Analysis Encl | | | 05000311/LER-1983-007-01, /01T-0:on 830210 & 11,during Routine Surveillance Testing,Two Steam Generator Snubbers Failed to Meet Acceleration & Bleed Test Requirements.Caused by Aging of Snubber Piston Seal Rubber Matl.Seals Will Be Rebuilt | /01T-0:on 830210 & 11,during Routine Surveillance Testing,Two Steam Generator Snubbers Failed to Meet Acceleration & Bleed Test Requirements.Caused by Aging of Snubber Piston Seal Rubber Matl.Seals Will Be Rebuilt | | | 05000272/LER-1983-008, Supplemental LER 83-008/03X-1:on 830311,pressurizer Code Safety Valves 1PR3,1PR4 & 1PR5 Exceeded Lift Set Pressure Range & Had Heavy Seat Leakage.Partly Caused by Difference in Test Vs Actual Operating Conditions | Supplemental LER 83-008/03X-1:on 830311,pressurizer Code Safety Valves 1PR3,1PR4 & 1PR5 Exceeded Lift Set Pressure Range & Had Heavy Seat Leakage.Partly Caused by Difference in Test Vs Actual Operating Conditions | | | 05000272/LER-1983-008-03, /03L-0:on 830311,discovered Pressurizer Code Safety Valves Tested for Lift Set Pressure & Seat Leakage by Wyle Labs During 821102-13 Lifted in Excess of Tech Specs & Exhibited Heavy Seat Leakage.Cause Undetermined | /03L-0:on 830311,discovered Pressurizer Code Safety Valves Tested for Lift Set Pressure & Seat Leakage by Wyle Labs During 821102-13 Lifted in Excess of Tech Specs & Exhibited Heavy Seat Leakage.Cause Undetermined | | | 05000311/LER-1983-008-99, /99X-0:on 830218,diesel Generator Area Low Pressure Carbon Monoxide Sys Automatic Initiation Feature Disabled & Tagged Out for Planned Maint.Continuous Fire Watch Established.On 830131,event Became Reportable | /99X-0:on 830218,diesel Generator Area Low Pressure Carbon Monoxide Sys Automatic Initiation Feature Disabled & Tagged Out for Planned Maint.Continuous Fire Watch Established.On 830131,event Became Reportable | | | 05000311/LER-1983-008, Forwards LER 83-008/99X-0.Detailed Event Anaysis Encl | Forwards LER 83-008/99X-0.Detailed Event Anaysis Encl | | | 05000272/LER-1983-009-99, /99X-0:on 830130,during Routine Plant Cooldown, Inadvertent Safety Injection Occurred Due to Low Pressurizer Pressure.Caused by Operator Overlooking Decreasing Pressure. All safety-related Equipment Functioned as Designed | /99X-0:on 830130,during Routine Plant Cooldown, Inadvertent Safety Injection Occurred Due to Low Pressurizer Pressure.Caused by Operator Overlooking Decreasing Pressure. All safety-related Equipment Functioned as Designed | | | 05000272/LER-1983-009, Forwards LER 83-009/99X-0.Detailed Event Analysis Encl | Forwards LER 83-009/99X-0.Detailed Event Analysis Encl | | | 05000311/LER-1983-009, Forwards LER 83-009/03L-0.Detailed Event Analysis Encl | Forwards LER 83-009/03L-0.Detailed Event Analysis Encl | | | 05000311/LER-1983-009-03, /03L-0:on 830203,during Shutdown Operation,Sample Analysis of RCS Boron Concentration Revealed Concentration Less than Tech Spec Limit.Caused by Hydrolazing Steam Generators.Rcs Boration Performed to Maintain Concentration | /03L-0:on 830203,during Shutdown Operation,Sample Analysis of RCS Boron Concentration Revealed Concentration Less than Tech Spec Limit.Caused by Hydrolazing Steam Generators.Rcs Boration Performed to Maintain Concentration | | | 05000272/LER-1983-010-03, /03L-0:from 821016-830205,during Testing of Type B & C Components,Three Containment Isolation Valves Exhibited Leakage Rates in Excess of Test Equipment Range. Valves 1CC215 & 1VC8 Restroked.Valve 14GB4 Reworked | /03L-0:from 821016-830205,during Testing of Type B & C Components,Three Containment Isolation Valves Exhibited Leakage Rates in Excess of Test Equipment Range. Valves 1CC215 & 1VC8 Restroked.Valve 14GB4 Reworked | | | 05000311/LER-1983-010-03, /03L-0:on 830126,during Shutdown Operations, Control Air Header 21 Isolated & Tagged for Leak Rate Testing.Porv 2PR1 Closed Resulting in Loss of RCS Vent Path. Caused by Surge in Header 22 Due to Failed Valve | /03L-0:on 830126,during Shutdown Operations, Control Air Header 21 Isolated & Tagged for Leak Rate Testing.Porv 2PR1 Closed Resulting in Loss of RCS Vent Path. Caused by Surge in Header 22 Due to Failed Valve | | | 05000311/LER-1983-010, Forwards LER 83-010/03L-0.Detailed Event Analysis Encl | Forwards LER 83-010/03L-0.Detailed Event Analysis Encl | | | 05000272/LER-1983-010, Forwards LER 83-010/03L-0.Detailed Event Analysis Encl | Forwards LER 83-010/03L-0.Detailed Event Analysis Encl | | | 05000272/LER-1983-011, Forwards LER 83-011/01T-0.Detailed Event Analysis Encl | Forwards LER 83-011/01T-0.Detailed Event Analysis Encl | | | 05000311/LER-1983-011-03, /03L-0:on 830401,discovered That Monthly Testing of Control Room Emergency Air Conditioning Sys Was Overlooked.Caused by Insp Order Sys Card Requiring Testing Being Erroneously Stated.Card Revised | /03L-0:on 830401,discovered That Monthly Testing of Control Room Emergency Air Conditioning Sys Was Overlooked.Caused by Insp Order Sys Card Requiring Testing Being Erroneously Stated.Card Revised | | | 05000311/LER-1983-011, Forwards LER 83-011/03L-0.Detailed Event Analysis Encl | Forwards LER 83-011/03L-0.Detailed Event Analysis Encl | | | 05000272/LER-1983-012-01, /01T-0:on 830222,during Startup,Reactor Manually Tripped.Caused by Rapidly Decreasing Steam Generator Levels. Manual Trip Obscured Failure of Trip Breakers to Open Automatically.Plant Cooldown Commenced | /01T-0:on 830222,during Startup,Reactor Manually Tripped.Caused by Rapidly Decreasing Steam Generator Levels. Manual Trip Obscured Failure of Trip Breakers to Open Automatically.Plant Cooldown Commenced | | | 05000311/LER-1983-012-03, /03L-0:on 830406,10-ton Cardox Sys Pilot Valve Found in Closed Position & All Low Pressure Sys Declared Inoperable.Caused by Inadequacies in Sys Recharging Operation on 830304.Procedures Revised | /03L-0:on 830406,10-ton Cardox Sys Pilot Valve Found in Closed Position & All Low Pressure Sys Declared Inoperable.Caused by Inadequacies in Sys Recharging Operation on 830304.Procedures Revised | | | 05000311/LER-1983-012, Forwards LER 83-012/03L-0.Detailed Event Analysis Encl | Forwards LER 83-012/03L-0.Detailed Event Analysis Encl | | | 05000311/LER-1983-013, Forwards LER 83-013/03L-0.Detailed Event Analysis Encl | Forwards LER 83-013/03L-0.Detailed Event Analysis Encl | | | 05000272/LER-1983-013-99, /99T-0:on 830215,calculated Moderator Temp Coefficient (Mtc) Value for All Control Rods Withdrawn Found More Positive than Tech Spec Allowance But within Expected Deviation.Limitation on Withdrawal Will Be Maintained | /99T-0:on 830215,calculated Moderator Temp Coefficient (Mtc) Value for All Control Rods Withdrawn Found More Positive than Tech Spec Allowance But within Expected Deviation.Limitation on Withdrawal Will Be Maintained | | | 05000311/LER-1983-013-03, /03L-0:on 830409,during Routine Shutdown,Lube Oil Temp Increases Observed on Charging Pump 22.Caused by Restricted Svc Water Flow to Pump Due to Oyster Shells & Miscellaneous Mollusks.Shells Removed | /03L-0:on 830409,during Routine Shutdown,Lube Oil Temp Increases Observed on Charging Pump 22.Caused by Restricted Svc Water Flow to Pump Due to Oyster Shells & Miscellaneous Mollusks.Shells Removed | | | 05000272/LER-1983-013, Forwards LER 83-013/99T-0.Detailed Event Analysis Encl | Forwards LER 83-013/99T-0.Detailed Event Analysis Encl | | | 05000311/LER-1983-014-03, /03L-1:on 830413 & 18,operating Loads on 2A 4kV & 460-volt Vital Buses Observed to Trip.Caused by Spurious Operation of Safeguards Equipment Control Sys Due to Design Deficiencies.Equipment Restarted | /03L-1:on 830413 & 18,operating Loads on 2A 4kV & 460-volt Vital Buses Observed to Trip.Caused by Spurious Operation of Safeguards Equipment Control Sys Due to Design Deficiencies.Equipment Restarted | | | 05000272/LER-1983-014, Forwards LER 83-014/03L-0.Detailed Event Analysis Encl | Forwards LER 83-014/03L-0.Detailed Event Analysis Encl | |
|