Telecopy Message of LER 83-007/01P:on 830218,two 1,000-kip Steam Generator Snubbers Failed to Meet Lockup & Bleed Rate Velocity Requirements.Cause Not Stated.Investigation Continuing.Detailed Rept to Be Submitted in 14 Days
ML20079M539
Person / Time
Site: Salem PSEG icon.png
Issue date: 02/18/1983
From: Midura H
Public Service Enterprise Group
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
LER-83-007-01P, LER-83-7-1P, NUDOCS 8303030050
Download: ML20079M539 (1)


LER-2083-007, Telecopy Message of LER 83-007/01P:on 830218,two 1,000-kip Steam Generator Snubbers Failed to Meet Lockup & Bleed Rate Velocity Requirements.Cause Not Stated.Investigation Continuing.Detailed Rept to Be Submitted in 14 Days
Event date:
Report date:
3112083007R00 - NRC Website

text

_

DE31GliATED O'TIIFAL Certified By i

j

. Public Service Electric and Gas Company P.O. Box E Hancocks Bridga, New Jersey 08038 Salem Generating Station February 18, 1983 S G - 311

Mr. R. C. Haynes

! Regional Administrator-j USNRC i

Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Raynes 1

REPORTABLE OCCURRENCE 83-007/0lP SALEM NO. 2 UNIT LER This letter is to confirm our verbal report to the NRC i Resident Inspector on Friday, February 18, of a potential reportable occurrence in acc,ordance with1983, advising l

Technical specification Section 6.9.1.8e.

hydraulic anubbere commencing February 1983, 10,During it was routine f discovered that two snubbers did not meet the requirements

(

for lockup and bleed rate velocities.  !

the problems are similar in nature to those discovered onInitial results suggest Salem Unit 1 in November 1982.

and a detailed report will be submitted within the 14 d period required by the Technical Specifications.

4

{ Sincerely yours, 1 I

l ,

1 l

H. J. Midura l General Manager =

! Salem Operations l RFaks CC: Distribution I