Forwards Insp Repts 50-317/99-06 & 50-318/99-06.Two Violations Being Treated as Noncited Violations
ML20212A200
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/08/1999
From: Marilyn Evans
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Cruse C
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20212A204 List:
References
50-317-99-06, 50-318-99-06, NUDOCS 9909160109
Download: ML20212A200 (4)


See also: IR 05000317/1999006

Text

p

t

i

September 8, 1999

Mr. Charles H. Cruse

Vice President - Nuclear Energy

Baltimore Gas and Electric Company (BGE)

Calvert Cliffs Nuclear Power Plant

1650 Calvert Cliffs Parkway

Lusby, MD 20657-4702

SUBJECT: NRC REGION 1 INTEGRATED INSPECTION REPORT NOS. 50-317/99-06

AND 50-318/99-06

Dear Mr. Cruse: )

l

This report transmits the findings of the safety inspection conducted by NRC inspectors at the

Calvert Cliffs Nuclear Power Plant from June 27,1999 to August 14,1999. The enclosed report

presents the results of that inspection. At the conclusion of the inspection, these findings were

discussed with Mr. Katz and others of your staff.

Overall, the NRC has concluded that your facility was operated in a safe manner. Your conduct

of activities was generally characteiized by safety-conscious operations. An automatic

shutdown of Unit i during harsh weather was without complication and all equipment functioned

as designed. Also, we determined that you are implementing a security program that effectively )

protects against acts of radiological sabotage.

Based on the results of this inspection, the NRC has determined that two Severity Level IV

violations of NRC requirements occurred. These violations are being treated as non-cited

violations (NCVs), consistent with Appendix C of the NRC Enforcement Policy. The issues

involved a failure to document maintenance activities on an emergency diesel generator and a

failure to promptly report a condition outside of the design basis of the plant. These NCVs are

described in the subject inspection report. If you contest these violations or severity level of

these NCVs, you should provide a response within 30 days of the date of this inspection report,

with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control

Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, Region I, the

Resident inspector Office at Calvert Cliffs, and the Director, Office of Enforcement, United

States Nuclear Regulatory Commission, Washington, DC 20555-0001.

l

)  ;

1 i

9909160109 990908

PDR ADOCK 05000317

G PDR

OFFICIAL RECORD COPY IE:01

,

.

Mr. Charles H. Cruse 2

i

We appreciate your cooperation. In accordance with 10 CFR 2.790 of the NRC ' Rules of

Practice," a copy of this letter and its enclosures will be placed in the NRC Public Document

Room (PDR).

Sincerely,

OriginalSignedjby:

Michele G. Evans, Chief

Projects Branch 1

Division of Reactor Projects

i

Docket / License Nos.: 50-317/DPR-53

50-318/DPR-69

Enclosure: NRC Region 1 Integrated inspection Report Nos. 50-317/99-06 and

50-318/99-06 1

m

.

.  !

Mr. Charles H. Cruse 3

cc w/ encl:

B. Montgomery, Direct % Nuclear Regulatory Matters (CCNPP)

R. McLean, Administratc,;, Nuclear Evaluations ,

J. Walter, Engineering Division, Public Service Commission of Maryland 1

K. Burger, Esquire, Maryland People's Counsel I

R. Ochs, Maryland Safe Energy Coalition

State of Maryland (2)

l

I

1

I

.

l

'

Mr. Charles H. Cruse 4

Distribution w/ encl:

H. Miller, RA/J. Wiggins, DRA -

D. Screnci, PAO

Nuclear Safety Information Center (NSIC) l

PUBLIC

NRC Resident inspector

Region i Docket Room (with concurrences)

M. Evans, DRP

W. Cook, DRP

R. Junod, DRP

Distribution w/ encl: (VIA E-MAIL) i

M. Tschiltz, RI EDO Coordinator I

S. Stewart - Calvert Cliffs

E. Adensam, NRR

A. Dromerick, NRR

inspection Program Branch, NRR (IPAS)

R. Correia, NRR

DOCDESK

DOCUMENT NAME: G:\BRANCHi\CC8(UFF\CC9906.WPD

Ta receive a copy of this document. Indicate in the box: 'C" = Co:ry without attachment / enclosure "E" = Copy with attachment / enclosure *N" = No copy

OFFICE Rl/DRP a

Rl/DRP / l l l

NAME SStewart MD MEvans 11111b

DATE 09/09/99 lF" 09/%/99 09/ /99 09/ /99 09/ /99

OFFICIAL RECORD COPY