| Start date | Site | Title | System |
---|
ML24037A025 | 8 February 2024 | Sequoyah | Pre-Submittal Presentation - 02/08/2024 - Proposed License Amendment Request Change to the Sequoyah Nuclear Plant Technical Specifications 3.8.1 and 3.8.2 | |
NUREG-2194 Volume 2, Rev. 1, Standard Technical Specifications, Westinghouse Advanced Passive 1000 (AP1000) Plants, Volume 2: Bases | 31 January 2024 | | NUREG-2194, Vol. 2, Rev. 1, Standard Technical Specifications, Westinghouse Advanced Passive 1000 (AP1000) Plants, Volume 2: Bases | Steam Generator Reactor Coolant System Feedwater Service water Main Steam Isolation Valve Primary containment Main Turbine Shutdown Cooling HVAC Reactor Pressure Vessel Residual Heat Removal Shield Building Fuel Pool Cooling and Cleanup Automatic Depressurization System Circulating Water System Main Steam Safety Valve Remote shutdown Emergency Core Cooling System Decay Heat Removal Main Steam Line Control Room Envelope Main Condenser Control Rod Main Steam |
ML24003A770 | 18 January 2024 | | Monthly (28-day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 23, 2024 | Reactor Coolant System Secondary containment Service water Emergency Diesel Generator Shutdown Cooling Standby Gas Treatment System |
NRC-24-0002, Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 | 12 January 2024 | Fermi | Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 | |
2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 | 11 January 2024 | Arkansas Nuclear | Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 | Steam Generator Reactor Coolant System Feedwater Service water Reactor Protection System Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Control Room Emergency Ventilation Main Steam Line Main Steam Containment Spray |
CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) | 8 January 2024 | Watts Bar | Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) | Emergency Diesel Generator |
ML23257A198 | 26 December 2023 | National Bureau of Standards Reactor | Examination Report No. 50-184/OL-23-02, National Institute of Standards and Technology | Emergency Diesel Generator Emergency Core Cooling System Safety Relief Valve Control Rod |
ML23243B049 | 19 December 2023 | Vogtle | VEGP Units 3 and 4, Safety Evaluation, LAR-22-002, TS 3.8.3 Inverters Operating, Completion Time Extension - Enclosure 3 | Reactor Coolant System Remote shutdown |
ML23321A125 | 18 December 2023 | Technical Specifications Task Force | Draft Traveler SE of TSTF-592 Revise Automatic Depressurization System (ADS) Instrumentation Requirements | Reactor Core Isolation Cooling Reactor Pressure Vessel High Pressure Core Spray Core Spray Automatic Depressurization System Emergency Core Cooling System Main Steam Line |
ML23349A162 | 17 December 2023 | Quad Cities | Issuance of Amendment Nos. 298 and 294 Increase Completion Time in Technical Specification 3.8.1.B.4 (Emergency Circumstances) | Secondary containment Reactor Protection System Emergency Diesel Generator Reactor Building Ventilation Control Room Emergency Ventilation |
RS-23-128, Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | 15 December 2023 | Quad Cities | Response to Request for Additional Information for the Emergency License Amendment Request Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | Secondary containment High Pressure Coolant Injection Emergency Diesel Generator Reactor Core Isolation Cooling Control Room Emergency Ventilation |
ML23215A167 | 15 December 2023 | Prairie Island | Acceptance of Requested Licensing Action Amendment Request to Revise Surveillance Requirement 3.8.1.2 Note 3 | |
ML23349A036 | 14 December 2023 | Quad Cities | NRR E-mail Capture - Draft Request for Additional Information Re Quad Cities Emergency Amendment Related to Unit 1 Diesel Generator Inoperability | High Pressure Coolant Injection Emergency Diesel Generator Reactor Core Isolation Cooling |
JAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications | 14 December 2023 | FitzPatrick | License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications | Reactor Coolant System Secondary containment High Pressure Coolant Injection Reactor Core Isolation Cooling Primary containment Reactor Pressure Vessel Residual Heat Removal Automatic Depressurization System Remote shutdown Emergency Core Cooling System Decay Heat Removal Low Pressure Coolant Injection |
RS-23-123, Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | 13 December 2023 | Quad Cities | Emergency License Amendment Request - Increase Technical Specifications Completion Time in TS 3.8.1.B.4 from 7 Days to 30 Days | Reactor Protection System Emergency Diesel Generator Reactor Building Ventilation Control Room Emergency Ventilation Emergency Core Cooling System |
ML23341A019 | 13 December 2023 | | Monthly (28-day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: December 26, 2023 | Service water Reactor Protection System |
ML23310A149 | 8 December 2023 | Fermi | Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements | Emergency Diesel Generator Emergency Core Cooling System |
ML23293A057 | 6 December 2023 | Watts Bar | Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control | Steam Generator Safety Parameter Display System |
L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 | 5 December 2023 | Prairie Island | Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 | |
ML23335A065 | 1 December 2023 | Grand Gulf | NRR E-mail Capture - GGNS - Audit Questions for LARs Associated with TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Init. 4b and 50.69, Risk-Informed Cat. and Treatment of SSCs for Nuclear Pwr Rx (L-2023-LLA-0081/0080) | Service water Reactor Protection System Reactor Core Isolation Cooling Primary containment HVAC Core Spray Automatic Depressurization System Intermediate Range Monitor Decay Heat Removal |
ML23334A091 | 30 November 2023 | Diablo Canyon | NRR E-mail Capture - Diablo Canyon 1 and 2 - Audit Questions for License Amendment Associated with TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Steam Generator Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Emergency Core Cooling System Containment Spray |
ML23319A334 | 20 November 2023 | Quad Cities | Regulatory Audit in Support of License Amendment Requests to Adopt TSTF 505, Revision 2 and 10 CFR 50.69 | Emergency Diesel Generator Reactor Core Isolation Cooling Control Room Emergency Ventilation |
ML23313A165 | 16 November 2023 | | Monthly (28-day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: November 28, 2023 | Reactor Coolant System Service water Emergency Diesel Generator Control Room Emergency Filtration System Emergency Equipment Cooling Water |
L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles | 15 November 2023 | Turkey Point | License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles | Steam Generator Reactor Coolant System Feedwater High Pressure Coolant Injection Reactor Protection System Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Reactor Core Isolation Cooling Primary containment Reactor Pressure Vessel Core Spray Residual Heat Removal Reactor Water Cleanup Control Room Emergency Ventilation Main Steam Safety Valve Emergency Core Cooling System Main Steam Line Main Condenser Control Rod Main Steam Containment Spray |
ML23304A163 | 15 November 2023 | Prairie Island | Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Revise SR 3.8.1.2 Note 3 | |
NL-23-0825, Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection | 14 November 2023 | Farley | Reply to Notice of Violation EA-23-080 and Readiness for 95001 Inspection | Emergency Diesel Generator |
SECY-23-0094, Weekly Information Report Week Ending November 3, 2023 | 14 November 2023 | | SECY-23-0094: Weekly Information Report Week Ending November 3, 2023 | Service water |
IR 05000275/2023003 | 13 November 2023 | Diablo Canyon | Integrated Inspection Report 05000275/2023003 and 05000323/2023003 | Feedwater Emergency Diesel Generator Auxiliary Feedwater Residual Heat Removal Main Steam Safety Valve Main Steam Containment Spray |
ML23310A032 | 13 November 2023 | River Bend | Integrated Inspection Report 05000458/2023003 | Service water Emergency Diesel Generator Reactor Core Isolation Cooling Main Turbine Shutdown Cooling High Pressure Core Spray Core Spray Residual Heat Removal Reactor Water Cleanup Standby Liquid Control Emergency Core Cooling System Decay Heat Removal Main Steam |
IR 05000458/2023003 | 13 November 2023 | River Bend | Integrated Inspection Report 05000458/2023003 | Service water Emergency Diesel Generator Reactor Core Isolation Cooling Main Turbine Shutdown Cooling High Pressure Core Spray Core Spray Residual Heat Removal Reactor Water Cleanup Standby Liquid Control Emergency Core Cooling System Decay Heat Removal Main Steam |
IR 05000338/2023003 | 13 November 2023 | North Anna | Integrated Inspection Report 05000338/2023003 and 05000339/2023003 | Steam Generator Reactor Coolant System Service water Emergency Diesel Generator Auxiliary Feedwater |
ML23317A224 | 9 November 2023 | Summer | (Vcsns), Unit 1 - License Amendment Request - Inverter Allowed Outage Time (AOT) Extension | Reactor Coolant System Emergency Diesel Generator HVAC |
IR 05000461/2023003 | 8 November 2023 | Clinton | Integrated Inspection Report 05000461/2023003 | Reactor Coolant System Feedwater Service water Emergency Diesel Generator Reactor Core Isolation Cooling Shutdown Cooling Reactor Pressure Vessel High Pressure Core Spray Residual Heat Removal Automatic Depressurization System Standby Liquid Control Emergency Core Cooling System |
WBL-23-052, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual | 8 November 2023 | Watts Bar | Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual | Steam Generator Reactor Coolant System Feedwater Reactor Protection System Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater HVAC Auxiliary Building Gas Treatment System Residual Heat Removal Control Room Emergency Ventilation Shield Building Main Steam Safety Valve Remote shutdown Emergency Gas Treatment System Emergency Core Cooling System Decay Heat Removal Main Steam Line Control Room Envelope Main Condenser Control Rod Main Steam Containment Spray |
RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power | 2 November 2023 | Mcguire McGuire | Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power | Steam Generator Feedwater Service water Reactor Protection System Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Main Turbine Emergency Core Cooling System Decay Heat Removal Main Steam Line Control Rod Main Steam Containment Spray |
ML23304A387 | 31 October 2023 | 05200050 | LLC Revision 1 to Standard Design Approval Application, Part 4, US460 Generic Technical Specifications, Vol. 1 | Steam Generator Reactor Coolant System Feedwater Main Steam Isolation Valve Reactor Pressure Vessel Emergency Core Cooling System Decay Heat Removal Main Steam Line Control Rod Main Steam |
ML23297A051 | 30 October 2023 | Fermi | Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) | Reactor Coolant System Service water Emergency Diesel Generator Primary containment Shutdown Cooling Reactor Pressure Vessel Core Spray Residual Heat Removal Emergency Equipment Cooling Water Residual Heat Removal Service Water Decay Heat Removal |
ML23303A136 | 27 October 2023 | Perry | Enclosure C - Pnpp Technical Specification Bases, Revision 18 | Reactor Coolant System Feedwater Secondary containment Service water Reactor Protection System Emergency Diesel Generator Main Steam Isolation Valve Reactor Core Isolation Cooling Primary containment Main Turbine Shutdown Cooling Reactor Recirculation Pump HVAC Reactor Pressure Vessel High Pressure Core Spray Core Spray Residual Heat Removal Reactor Water Cleanup Shield Building Fuel Pool Cooling and Cleanup Automatic Depressurization System Standby Liquid Control Intermediate Range Monitor Remote shutdown Steam Jet Air Ejector Emergency Core Cooling System Decay Heat Removal Main Steam Line Safety Relief Valve Control Room Envelope Main Condenser Control Rod Main Steam Containment Spray Low Pressure Coolant Injection |
IR 05000333/2023010 | 26 October 2023 | FitzPatrick | Biennial Problem Identification and Resolution Inspection Report 05000333/2023010 | Service water High Pressure Coolant Injection Emergency Diesel Generator Primary Containment Isolation System Reactor Core Isolation Cooling Main Turbine Residual Heat Removal Main Condenser |
IR 05000348/2023091 | 19 October 2023 | Farley | Final Significance Determination of a White Finding and Notice of Violation and Assessment Followup Letter NRC Inspection Report 05000348/2023091 | Emergency Diesel Generator |
ML23275A171 | 16 October 2023 | Wolf Creek | October 16, 2023, Licensee Pre-submittal Meeting Slides - License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2 for Wolf Creek Generating Station | |
NRC-23-0071, Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating | 13 October 2023 | Fermi | Response to Request for Additional Information (RAI) for Exigent License Amendment Request for Revision of Technical Specification (TS) 3.8.1 AC Sources - Operating | Service water Emergency Diesel Generator Residual Heat Removal Service Water |
NRC-23-0062, Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 | 12 October 2023 | Fermi | Response to Request for Additional Information for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 | Emergency Diesel Generator Emergency Core Cooling System |
ML23272A155 | 10 October 2023 | Fermi | Letter to Licensee and Federal Register Notification of Amendment to Renewed Facility Operating License and Proposed No Significant Hazards Consideration Determination (Exigent Circumstances) (EPID L-2023-LLA-0134) (Letter) | |
NRC-23-0063, Inservice Testing Program for Pumps and Valves - Part 12: IST Program Pump Basis Revision 1 | 9 October 2023 | Fermi | Inservice Testing Program for Pumps and Valves - Part 12: IST Program Pump Basis Revision 1 | Reactor Coolant System Feedwater Secondary containment Service water High Pressure Coolant Injection Emergency Diesel Generator Main Steam Isolation Valve Reactor Core Isolation Cooling Primary containment Shutdown Cooling HVAC Reactor Pressure Vessel Core Spray Residual Heat Removal Fuel Pool Cooling and Cleanup Automatic Depressurization System Standby Liquid Control Emergency Equipment Cooling Water Residual Heat Removal Service Water Low Pressure Cooling Injection Emergency Core Cooling System Decay Heat Removal Main Condenser Control Rod Containment Spray Low Pressure Coolant Injection |
ML23278A240 | 6 October 2023 | River Bend | Regulatory Audit Plan in Support of License Amendment Requests to Revise TSs to Adopt Risk-Informed Completion Times and Implement the Provisions of 10 CFR 50.69 | |
ML23272A156 | 5 October 2023 | Fermi | Federal Register Notification of Amendment to Renewed Facility Operating License and Proposed No Significant Hazards Consideration Determination (Exigent Circumstances) (EPID L-2023-LLA-0134) FRN | Emergency Equipment Cooling Water Residual Heat Removal Service Water |
ML23275A122 | 2 October 2023 | Saint Lucie | Improved Technical Specifications Conversion, Section 3.7, Plant Systems, Revision 2 - Volume 12 | Steam Generator Reactor Coolant System Feedwater Service water Emergency Diesel Generator Main Steam Isolation Valve Auxiliary Feedwater Shutdown Cooling HVAC Residual Heat Removal Control Room Emergency Ventilation Shield Building Circulating Water System Main Steam Safety Valve Remote shutdown Emergency Core Cooling System Decay Heat Removal Main Steam Line Control Room Envelope Main Condenser Control Rod Main Steam Containment Spray |
ML23275A113 | 2 October 2023 | Saint Lucie | Improved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses Database - Volume 3 | Steam Generator Reactor Coolant System Reactor Protection System Shield Building |