Technical Specifications Task Force (TSTF) is an industry group responsible for developing standard changes to the Technical Specifications which individual licensees may request adoption from the NRC.

  • docket = PROJ0753
 Start dateTitleTSTFTopic
ML24053A1021 August 2024Draft Traveler Safety Evaluation of TSTF-576, Revise Safety/Relief Valve RequirementsTSTF-576Maintenance Rule Program
Simmer margin
ML24204A2711 August 2024TSTF-576 Safety Evaluation SupplementTSTF-576Shutdown Margin
Simmer margin
ML24106A2761 August 2024Draft Safety Evaluation of Technical Specifications Task Force Traveler TSTF-576, Revision 3, “Revise Safety/Relief Valve Requirements” (EPID L -2019-PMP-0207)TSTF-576
ML24207A18225 July 2024TSTF-601, Extend Shield Building Completion Time After Refueling, Acceptance Review LetterTSTF-601
ML24207A14625 July 2024Forthcoming Quarterly Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force
ML24207A15925 July 2024Forthcoming Public Meeting Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force (TSTF)TSTF-585
ML24172A05420 June 2024TSTF-600 Acceptance Review Letter TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing FrequencyTSTF-600
EPID:L-2024-PMP-000520 June 2024TSTF-600
ML24169A40620 May 2024Draft Traveler TSTF-604, Revise Ventilation System ActionsTSTF-448
TSTF-287
TSTF-426
TSTF-423
TSTF-432
TSTF-431
TSTF-604
Safe Shutdown
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Recently irradiated fuel
Affidavit
Control Room Habitability
ML24064A15517 May 2024LIC-600, Revision 2, Standard Technical Specifications Change Traveler Review and Adoption Process
ML24129A0668 May 20245_8_24 Meeting Handouts - History of Traveler Adoption
ML24129A0658 May 20245_8_24 Meeting Handouts - Active Traveler Summary Report and PrioritiesTSTF-576
TSTF-585
TSTF-596
TSTF-601
TSTF-599
TSTF-600
TSTF-597
TSTF-602
TSTF-603
Surveillance Frequency Control Program
ML24129A0678 May 20245_8_24 Meeting Handouts - Proposed Change to the PWR ECCS Mode 4 Requirements
ML24114A26524 April 2024TSTF-597 Acceptance Review LetterTSTF-597
ML24114A25724 April 2024TSTF-599 Acceptance Review LetterTSTF-599
EPID:L-2024-PMP-000024 April 2024TSTF-599
ML24113A15222 April 2024Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force
ML24067A1637 March 2024NRC Staff Comments on Draft Revision 3 TSTF-585, Revise LCO 3.0.3 to Require Managing RiskTSTF-505
TSTF-585
Large early release frequency
ML24044A1408 February 2024TSTF Handout for 02/08/2024 Quarterly MeetingTSTF-359
TSTF-576
TSTF-584
TSTF-585
TSTF-588
TSTF-589
TSTF-591
TSTF-592
TSTF-593
TSTF-596
TSTF-601
TSTF-599
TSTF-600
Surveillance Frequency Control Program
ML24038A3497 February 2024NRC Comments for Pre-submittal Meeting TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing FrequencyTSTF-545
TSTF-600
Incorporated by reference
ML24032A4691 February 2024Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force
ML24029A14731 January 2024TSTF-592 Cover Letter for Final SE of TSTF-592TSTF-592
ML24029A14831 January 2024Final Traveler SE of TSTF-592TSTF-505
TSTF-59
TSTF-592
Reactor Vessel Water Level
ML24009A2629 January 2024Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing FrequencyTSTF-600
ML24009A2639 January 2024Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-599, Eliminate Periodic Surveillance Test of Simultaneous Start of Redundant Diesel GeneratorsTSTF-599
ML23325A21418 December 2023Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) ProgramTSTF-591Probabilistic Risk Assessment
ML23321A12518 December 2023Draft Traveler SE of TSTF-592 Revise Automatic Depressurization System (ADS) Instrumentation RequirementsTSTF-505
TSTF-14
TSTF-592
Reactor Vessel Water Level
ML23325A21318 December 2023Cover Letter for Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) ProgramTSTF-591
ML24016A27012 December 2023TSTF-585, Draft Revision 3, Revise LCO 3.0.3 to Require Managing RiskTSTF-585
ML23299A25026 October 2023Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force
ML23269A15126 September 2023Draft Model SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) ProgramTSTF-591Probabilistic Risk Assessment
ML23262B22921 September 2023Cover Letter Transmitting Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) ProgramTSTF-591
ML23262B23021 September 2023Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) ProgramTSTF-505
TSTF-591
Probabilistic Risk Assessment
ML23257A15818 September 2023NRC Staff Feedback Draft TSTF-601, Extend Shield Building Completion Time After Refueling for Pre-submittal Meeting on 9/18/23TSTF-601
ML23124A22111 September 2023Cover Letter for Final SEs of TSTF-589, Eliminate Automatic Diesel Generator (DG) Start During ShutdownTSTF-589
ML23153A14411 September 2023Draft SE of Traveler TSTF-591, Revise Risk-Informed Completion Time (RICT) ProgramTSTF-505
TSTF-591
Probabilistic Risk Assessment
ML23241B03911 September 2023Final Model SE of TSTF-589, Eliminate Automatic Diesel Generator Start During ShutdownTSTF-589
ML23241B04011 September 2023Final Traveler SE of TSTF-589, Eliminate Automatic Diesel Generator Start During ShutdownTSTF-589Safe Shutdown
Recently irradiated fuel
Offsite Circuit
ML23250A0677 September 2023Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-601, Extend Shield Building Completion Time After RefuelingTSTF-601
ML23243B03431 August 2023Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-601, Extend Shield Building Completion Time After RefuelingTSTF-601
ML23234A17422 August 2023Forthcoming PRE-SUBMITTAL Teleconference with the Technical Specifications Task Force (TSTF) Regarding Draft Traveler TSTF-593, Revise Design FeaturesTSTF-593
ML23205A21410 August 2023Acceptance for Review Regarding Traveler TSTF-596, Revision 0, Expand the Applicability of the Surveillance Frequency Control Program (SFCP)TSTF-596Surveillance Frequency Control Program
ML23222A22710 August 2023Request for Additional Information Traveler TSTF-592, Revision 1, Revise Automatic Depressurization System (ADS) Instrumentation RequirementsTSTF-505
TSTF-592
ML23222A18810 August 2023Forthcoming Quarterly Public Teleconference Between the U. S. Nuclear Regulatory Commission and the Technical Specifications Task Force
EPID:L-2023-PMP-000210 August 2023TSTF-596
ML23206A12431 July 2023TSTF-584 Cover Letter for Final SETSTF-584
ML23206A07631 July 2023Final Traveler SE of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC InitiationTSTF-584Reactor Vessel Water Level
High Radiation Area
Anticipated operational occurrence
ML23206A07531 July 2023Final Model SE of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC InitiationTSTF-584Reactor Vessel Water Level
High Radiation Area
Anticipated operational occurrence
ML23209A04425 July 2023Email Concurrence for DSS Log 2188 (TSTF-584)TSTF-584
ML24183A2446 July 2023Relationship Between Natural Phenomena Protection Design Features and Operability R6TSTF-505
TSTF-372
TSTF-427
Safe Shutdown
High winds
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Tornado Generated Missile
Fukushima Dai-Ichi
Tornado Missile Protection
Earthquake
Operability Assessment
... further results